This Task Assignment (TA) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for environmental consulting services at the Millionaires Dry Cleaners site located at 6313 Miramar Parkway in Miramar, Broward County, Florida. The underlying contract number is HW683, with the specific task assignment designated as DC016A. The TA was executed on June 21, 2022, with a completion date of December 9, 2022. The FDEP project manager is Evan Miller, and the contractor's project manager is Adrian Smith.
The scope of work consists of three subtasks: project management, 2022 groundwater sampling, and preparation of a groundwater sampling report. Under Subtask 2, Geosyntec will conduct groundwater sampling from 11 existing monitoring wells (MW001 through MW11), collect depth-to-water measurements and groundwater samples, and analyze samples for volatile organic compounds using EPA Method 8260B. The contractor will also prepare an IDW waste characterization profile and coordinate disposal of up to 1 drum of purge water. Subtask 3 involves compiling analytical results and preparing a comprehensive groundwater sampling report with plume maps, water table maps, and geologic/hydrogeologic data, including possible teleconferences with FDEP. The total task value is $9,761.95 on a fixed unit rate basis, with 67 total labor hours allocated across the subtasks. The deliverable, comprising the 2022 Groundwater Sampling Report, field logs, ADaPT tables, and GIS tables, is due on September 9, 2022, with invoice payment conditional upon FDEP receipt and approval of these deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC016A Completion December 9, 2022
This Task Assignment authorizes Geosyntec to conduct annual groundwater sampling activities in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 20 June 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Adrian Smith 561-922-1094
ERIC_4233
6313 Miramar Parkway Miramar, Broward County, Florida
Millionaires Dry Cleaners
✔ $ 9,761.95
$ 9,761.95
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.06.21 11:14:07 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.06.21 10:14:14 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1,2,3- Submittal of 2022 Groundwater Sampling Report, ADaPT, field logs and GIS tables; Project Management 09/09/2022
Subtask 1,2,3- FDEP receipt and approval of 2022 Groundwater Sampling Report, ADaPT, field logs and GIS tables; Project Management $ 9,761.95
$ 9,761.95
HW683
DC016A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW683 Contract Negotiation File Millionaires Dry Cleaners Miramar, Broward County
ERIC_4233
Evan Miller, Project Manager June 20, 2022
Subject: Negotiation Summary
HW683 DC016A
This Task Assignment authorizes Geosyntec to conduct annual groundwater sampling activities.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2 – 2022 Groundwater Sampling Geosyntec will mobilize to the Site to conduct groundwater sampling of the existing 11 monitoring wells, MW001 through MW11. Geosyntec will collect depth to water (DTW) levels and groundwater samples. Collected groundwater samples will be analyzed for volatile organic compounds (VOCs) via Environmental Protection Agency (EPA) Method 8260B. Geosyntec will prepare an IDW waste characterization profile, an IDW manifest, and coordinate disposal for up to 1 drum of purge water generated during 2022 groundwater sampling.
Subtask 3 – Groundwater Sampling Report Following receipt of analytical results for the 2022 groundwater sampling, Geosyntec will compile the data collected and prepare a groundwater sampling report which will document the field activities and laboratory analyses results. This groundwater sampling report will include a review and interpretation of the 2022 groundwater analytical results, plume maps, water table maps, and geologic/hydrogeologic data, including possible teleconferences with FDEP to discuss the field data. One electronic copy of the final report (including ADaPT tables) will be submitted to FDEP by email and uploaded to the FDEP FTP website.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $9,761.95 with 67 labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 6/17/2022
Task #: HW683-DC034 SubTask 1 Project Management SubTask 6
Site: Millionaires Dry Cleaners SubTask 2 Groundwater Sampling SubTask 7
Activity/Phase: NAM SubTask 3 Groundwater Monitoring Report SubTask 8
Project Manager: Adrian Smith SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$53.41 Project Manager A. Smith 6 5.5 $68.75 Principal T. Kafka 1 0 1 0 0 0 0 0 0 0 $53.41 Senior Professional A. Smith 7 5 2 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 5 0 5 0 0 0 0 0 0 0 $37.50 Professional A. Galvin 16 0 16 0 0 0 0 0 0 0 $32.21 Senior Staff Professional A. Langteau 1 0 1 0 0 0 0 0 0 0 $30.05 Staff Professional R. Temple 30 30 0 0 0 0 0 0 0 0 $32.21 Administrative Assistant S. Darling 1 0 1 0 0 0 0 0 0 0
Total Hours 67 6 35 26 0 0 0 0 0 0 0
Direct Labor $2,530.40 $291.11 $1,168.55 $1,070.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $4,370.01 $502.75 $2,018.09 $1,849.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,900.41 $793.86 $3,186.64 $2,919.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $16.50 $16.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $181.50 $181.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $770.00 $770.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $990.00 $990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $760.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,071.91 $793.86 $5,358.14 $2,919.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $690.04 $79.39 $318.66 $291.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,761.95 $873.25 $5,676.80 $3,211.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 1 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Millionaires Dry Cleaners SUBTASK: Groundwater Sampling
DATE: 6/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Professional A. Smith 5
Staff Professional R. Temple
TOTAL LABOR 35
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck $120.00 Day 2 $240.00 Van $120.00 Day 0 $0.00
Subtotal $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Clark Environmental $165.00 $165.00
$0.00 $0.00 Subtotal $165.00
TOTAL SUB $165.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 11 0 $770.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00
RCRA-8 $14.00 0 0 $0.00
TOC $30.00 0 0 $0.00
TDS $16.00 0 0 $0.00
TRPH $88.00 0 0 $0.00
PFAS $315.00 0 0 $0.00
Subtotal $770.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 2 $220.00
Subtotal $220.00
TOTAL LAB $990.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00
Subtotal $0.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 2 $580.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $580.00 IDW Related
Drum $100.00 Drum 1 $100.00 Subtotal $100.00
Expendables $40.00 Day 2 $80.00
Subtotal $80.00
Other $0.00 Year 1 $0.00
Subtotal $0.00
TOTAL EQUIPMENT $760.00
Preparing field scope of work, schedule and communicate with owners for access (2 hrs), field preparation (1 hrs), Evaluating and interpreting field data (1 hr), technical support (1
Mobilization/demob for sampling at 2 hrs/day(4 hrs), equipment calibration (1 hr), groundwater sampling of 11 monitoring wells at 1.5 hrs/well (17 hrs), sample management (2 hrs), preparation of IDW waste characterization profile (1 hr), preparation of manifests and arrange disposal (1 hr), Mobilization/demob for IDW (2 hrs), observation of IDW pickup (2 hrs).
6/20/2022 Page 1 of 2 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Millionaires Dry Cleaners SUBTASK: GW Monitoring Report
DATE: 6/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Senior Professional A. Smith 2
Project Professional M. Hensley 5
Professional A. Galvin 16
Senior Staff Professional A. Langteau 1
Administrative Assistant S. Darling 1
TOTAL LABOR 26
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
PDF compilation and assembly
Preparing report recommendations (1 hr)
NAM report data evaluation/interpretation, PE certification of report (2 hrs)
Prepare 5 report figures at 1 hr per figure (5 hours)
Groundwater Monitoring Report preparation (16 hrs)
Spider diagram generation (1 hr)
6/20/2022 Page 2 of 2 Subtask 3
XR222178/DC034A Millionaires SOW - HW683 - June 2022_f
900 Broken Sound Parkway NW, Suite 200 Boca Raton, Florida 33487
PH 561.995.0900
FAX 561.995.0925
www.geosyntec.com
20 June 2022
Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Scope of Work and Level of Effort for 2022 Groundwater Sampling Millionaires Dry Cleaners (ERIC_4233) 6313 Miramar Parkway
Miramar, Broward County, Florida
Dear Mr. Miller, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work (SOW) and proposed Level of Effort (LOE) for groundwater sampling activities at the Millionaires Dry Cleaners Site (referred to herein as “Site”) located in Miramar, Broward County, Florida. A summary of the costs associated with the scope of work described below is included with the attached LOE.
Subtask 1 – Project Management
Subtask 2 – 2022 Groundwater Sampling
Geosyntec will mobilize to the Site to conduct groundwater sampling of the existing 11 monitoring wells, MW001 through MW11. Geosyntec will collect depth to water (DTW) levels and groundwater samples. Collected groundwater samples will be analyzed for volatile organic compounds (VOCs) via Environmental Protection Agency (EPA) Method 8260B. Geosyntec will prepare an IDW waste characterization profile, an IDW manifest, and coordinate disposal for up to 1 drum of purge water generated during 2022 groundwater sampling.
Subtask 3 – Groundwater Sampling Report
Following receipt of analytical results for the 2022 groundwater sampling, Geosyntec will compile the data collected and prepare a groundwater sampling report which will document the field activities and laboratory analyses results. This groundwater sampling report will include a review and interpretation of the 2022 groundwater analytical results, plume maps, water table maps, and geologic/hydrogeologic data, including possible teleconferences with FDEP to discuss the field
Mr. Evan Miller 20 June 2022
XR222178/DC034A Millionaires SOW - HW683 - June 2022_f data. One electronic copy of the final report (ADaPT tables not included) will be submitted to FDEP by email and uploaded to the FDEP FTP website.
Invoice and Deliverable Schedule:
Geosyntec proposes the following deliverable and Period of Performance schedule. The schedule below assumes two weeks for approval of the Task Assignment (TA) approval by the FDEP:
Subtask Deliverable Deliverable Due Date Invoice Amount
1,2 and 3 Submittal of 2022 Groundwater Sampling Report and field logs. 9 September 2022 $9,761.95
Total: $9,761.95
Closing
Please review and call us if you have any questions. As always, it is a pleasure to work with the
FDEP.
Sincerely, Geosyntec Consultants
Adrian Smith, P.E. Todd Kafka, P.G.
Senior Engineer Sr. Principal
Copies:
Attachments:
Level of Effort Spreadsheet
| CEF.pdf |
| Cost Estimate |
| LOEs.pdf |
| Subtask 2 |
| Subtask 3 |
| DC034A Millionaires SOW - HW683 - June2022_f.pdf |
| DC034A Millionaires SOW - HW683 - May 2022_f.pdf |
| Clark Geosyntec Drum Rates 2022.pdf |
| Greyling Insurance City of Miramar - Construction ROW Bond.pdf |
| CEF.pdf |
| Cost Estimate |
| LOEs.pdf |
| Subtask 2 |
| Subtask 3 |
| CEF.pdf |
| Cost Estimate |
| LOEs.pdf |
| Subtask 2 |
| Subtask 3 |