Document Summary
This Task Assignment (TA) is a supplemental site assessment contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants. The TA, designated as DC014A under Contract Number HW683, authorizes environmental remediation and assessment services at the Carriage Cleaners site located at 3920 Confederate Point Road in Jacksonville, Duval County, Florida (FDEP Facility ID ERIC_4578). The project is managed by Evan Miller for FDEP and Blaine Dawson for Geosyntec, with Todd Kafka serving as Contract Manager.
The scope of work encompasses five subtasks with a total contract value of $17,301.35 and includes project management (Subtask 1), Modified Active Gas Sampling (MAGS) testing of four wells (Subtask 2; $7,910.70), groundwater sampling of monitoring wells (Subtask 3; $3,674.15), preparation of a Supplemental Site Assessment Report with GIS data compilation (Subtasks 1, 4, 5; combined $5,716.50), and contaminated IDW transport and disposal management (Subtask 5; $175.00). The contract utilizes a fixed unit rate pricing structure with deliverables and invoicing tied to completion milestones. Field activities are scheduled for completion by July 8, 2022 (MAGS testing) and August 12, 2022 (groundwater sampling), with final report submission by September 16, 2022. The work comprises 116 total labor hours and was authorized effective May 17, 2022, with a completion date of December 16, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC014A Completion December 16, 2022
This Task Assignment authorizes Geosyntec to conduct supplemental site assessment activities at the Carriage Cleaners site in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 17 May 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Blaine Dawson 904-450-4271
ERIC_4578
3920 Confederate Point Road Jacksonville, Duval County, Florida
Carriage Cleaners
✔ $ 17,301.35
$ 17,301.35
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.05.17 16:24:47 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.17 15:58:13 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2- Submittal of Field deliverable for MAGS testing 07/08/2022
Subtask 3- Submittal of Field deliverable for groundwater sampling 08/12/2022
Subtasks 1,4,5- Submittal of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files 09/16/2022
Subtask 2- FDEP receipt and approval of Field deliverable for MAGS testing $ 7,910.70
Subtask 3- FDEP receipt and approval of Field deliverable for groundwater sampling $ 3,674.15
Subtasks 1,4,5- FDEP receipt and approval of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files $ 5,716.50
$ 17,301.35
HW683
DC014A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Carriage Cleaners Jacksonville, Duval County
ERIC_4578
From: Evan Miller, Project Manager Date: May 17, 2022 Subject: Negotiation Summary
HW683 DC014A
This Task Assignment authorizes Geosyntec to conduct supplemental site assessment activities at the Carriage Cleaners site
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2 – Modified Active Gas Sampling (MAGS) Subtask 2 includes costs for Geosyntec personnel to mobilize to the Site to re-test four MAGS wells (MAGS-004, -005, -006, and -008) and to remove one, 10 to 15-ft radius of soil vapor volume using an appropriately sized blower capable of generating up to 50 standard cubic feet per minute. As there was minimal change in the calculated ROI between 20 and 24 in-H2O during the October 2020 step tests, each MAGS test will be conducted with at least 24 in-H2O of applied vacuum with the goal of applying the maximum vacuum the system can produce. A soil vapor sample will be collected at each MAGS well after approximately one pore volume has been extracted and sent to a NELAP approved, fixed-based laboratory for analysis by EPA Method TO-15.
Subtask 3 – Groundwater Sampling Subtask 3 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. Prior to sampling, depth to water measurements will be collected from Site monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs).
Subtask 4 – Supplemental Site Assessment Report Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a SSAR documenting the supplemental Site assessment activities and summarizing analytical results. As part of this subtask, Geosyntec will import and tabulate the GIS data in the select electronic data deliverable format.
MEMORANDUM
Error! Reference source not found.
May 17, 2022 Page Two
Subtask 5 – IDW Management Subtask 5 includes costs for IDW transport and disposal.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $17,301.35 with 116 labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 5/17/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Carriage Cleaners SubTask 2 MAGS Assessment SubTask 7
Activity/Phase: Assessment SubTask 3 Groundwater Sampling SubTask 8
Project Manager: Evan Miller SubTask 4 SSAR SubTask 9
SubTask 5 IDW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.79 Project Manager B. Dawson 11 11.2 $68.75 Principal T. Kafka 2 1 0 1 0 0 0 0 0 0
$0.00 Principal 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0
$42.79 Project Professional B. Dawson 11 3 3 4 1 0 0 0 0 0 $46.15 Project Professional M. Hensley 4 0 0 4 0 0 0 0 0 0 $39.42 Professional J. Mills 25 25 0 0 0 0 0 0 0 0
$0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0
$32.21 Senior Staff Professional A. Langteau 4 0 0 4 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0
$30.29 Staff Professional D. McGill 58 13 21 24 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Designer 0 0 0 0 0 0 0 0 0 0 $0.00 Drafter/CADD Operator 0 0 0 0 0 0 0 0 0 0
$37.26 Administrative Assistant P. Gallagher 1 0 0 1 0 0 0 0 0 0 $0.00 Clerical 0 0 0 0 0 0 0 0 0 0 $0.00 Intern 0 0 0 0 0 0 0 0 0 0
Total Hours 116 11 42 24 38 1 0 0 0 0 0
Direct Labor $4,182.37 $481.16 $1,576.39 $764.46 $1,317.57 $42.79 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $7,222.95 $830.96 $2,722.43 $1,320.22 $2,275.44 $73.90 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,405.32 $1,312.12 $4,298.82 $2,084.68 $3,593.01 $116.69 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $175.00 $0.00 $0.00 $0.00 $175.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $175.00 $0.00 $0.00 $0.00 $175.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $17.50 $0.00 $0.00 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $192.50 $0.00 $0.00 $0.00 $192.50 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,311.00 $800.00 $511.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,531.00 $910.00 $621.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $580.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $712.00 $132.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,000.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,552.00 $1,792.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,160.82 $1,312.12 $7,480.82 $3,465.68 $3,593.01 $309.19 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,140.53 $131.21 $429.88 $208.47 $359.30 $11.67 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $17,301.35 $1,443.33 $7,910.70 $3,674.15 $3,952.31 $320.86 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 1 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Carriage Cleaners SUBTASK: MAGS Assessment
DATE: 5/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Senior Professional
Project Professional B. Dawson 3
Professional J. Mills
Senior Staff Professional
Staff Professional D. McGill 13
Drafter/CADD Operator
Administrative Assistant
TOTAL LABOR 42
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00
$120.00 Day 4 $480.00 Van $120.00 Day 0 $0.00
Subtotal $480.00
Mileage $0.59 Mile 0 $0.00 Subtotal $0.00
Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Equipment Procurement
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Mobile Laboratory $0.00 $0.00
Subtotal $0.00
Surveying $0.00 $0.00
Subtotal $0.00
IDW
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Utilities $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Other $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00
RCRA-8 $14.00 0 0 $0.00
TOC $30.00 0 0 $0.00
TDS $16.00 0 0 $0.00
TRPH $88.00 0 0 $0.00
TO-15 - Gas $200.00 4 0 $800.00
Subtotal $800.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $110.00
TOTAL LAB $910.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Vapor Sampling Kit $290.00 Day 2 $580.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00
Subtotal $580.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 0 $0.00 Air Sampling Canister $33.00 Each 4 $132.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $132.00 IDW Related
Drum $100.00 Drum 0 $0.00 Subtotal $0.00
Expendables $40.00 Day 2 $80.00
Subtotal $80.00
Other $19.00 Day 2 $38.00 $18.00 Day 2 $36.00 $180.00 Day 2 $360.00 $33.00 Day 2 $66.00 $250.00 Day 2 $500.00
Subtotal $1,000.00
TOTAL EQUIPMENT $1,792.00
Evaluating and interpreting field data
Property owner notification (1); Evaluating and interpreting field data (1); Prepare field package (1)
Mob/demob (8 hr round trip to JAX + 1 hr/day x 2 day = (10 hr); Field preparation (2 hr);
Calibration of instruments (1 hr); MAGS testing (4 wells; 8 hr); MAGS data evaluation (2 hr); MAGS Table and figure generation (2 hr)
Field preparation (1 hr); Mob/demob (1 hr/day x 2 days = 2 hr); MAGS testing (4 wells; 8 hr); Prepare field package (2)
Truck ( 1 vehicle Tampa 2 days; 1 vehicle Jax 2 days)
Portable Generator Air Flow Meter Regenerative Blower Differential Pressure Gauge Vacuum Gauges
5/17/2022 Page 1 of 4 Subtask 2
SUBTASK: Groundwater Sampling
DATE: 5/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Senior Professional
Project Professional B. Dawson 3
Professional
Senior Staff Professional
Staff Professional D. McGill
Drafter/CADD Operator
Administrative Assistant
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00
Subtotal $0.00
Mileage $0.59 Mile 0 $0.00 Subtotal $0.00
Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Equipment Procurement
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Mobile Laboratory $0.00 $0.00
Subtotal $0.00
Surveying $0.00 $0.00
Subtotal $0.00
IDW
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Utilities $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Other $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 0 0 $0.00 VOHs $73.00 7 0 $511.00 VOAs $60.00 0 0 $0.00
RCRA-8 $14.00 0 0 $0.00
TOC $30.00 0 0 $0.00
TDS $16.00 0 0 $0.00
TRPH $88.00 0 0 $0.00
PFAS $315.00 0 0 $0.00
Subtotal $511.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $110.00
TOTAL LAB $621.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00
Subtotal $0.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 2 $580.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $580.00 IDW Related
Drum $100.00 Drum 1 $100.00 Subtotal $100.00
Expendables $40.00 Day 2 $80.00
Subtotal $80.00
Other $0.00 Day 0 $0.00
Subtotal $0.00
TOTAL EQUIPMENT $760.00
Property owner notification (1); Evaluating and interpreting field data (1); Prepare field package (1)
Field preparation (3); Mob 2 days @ 1 hr/day (2); 3 water level measurements from MWs not sampled first day (1); Sampling 7 monitoring wells @ 1.5 hrs each (11); Sample management/shipping (2); IDW Management (1); Prepare field package (1)
5/17/2022 Page 2 of 4 Subtask 3
SUBTASK: SSAR
DATE: 5/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Senior Professional
Project Professional B. Dawson 4
Project Professional M. Hensley 4
Senior Staff Professional A. Langteau 4
Staff Professional D. McGill 24
Drafter/CADD Operator
Administrative Assistant P. Gallagher 1
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00
Subtotal $0.00
Mileage $0.59 Mile 0 $0.00 Subtotal $0.00
Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Equipment Procurement
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Mobile Laboratory $0.00 $0.00
Subtotal $0.00
Surveying $0.00 $0.00
Subtotal $0.00
IDW
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Utilities $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Other $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00
RCRA-8 $14.00 0 0 $0.00
TOC $30.00 0 0 $0.00
TDS $16.00 0 0 $0.00
TRPH $88.00 0 0 $0.00
PFAS $315.00 0 0 $0.00
Subtotal $0.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00
Subtotal $0.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $0.00 IDW Related
Drum $100.00 Drum 0 $0.00 Subtotal $0.00
Expendables $40.00 Day 0 $0.00
Subtotal $0.00
Other $0.00 Day 0 $0.00
Subtotal $0.00
TOTAL EQUIPMENT $0.00
Report formatting and PDF compilation
Develop recommendations and path forward
SSAR preparation and PG seal
Updating of SSAR figures
GIS table data entry for 4 MAGS, 7 WLs, and 7 MWs @ 8 min/data point (3 hrs); GIS database data checker and submittal (1)
SSAR Preparation
5/17/2022 Page 3 of 4 Subtask 4
SUBTASK: IDW Management
DATE: 5/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Senior Professional
Project Professional B. Dawson 1
Professional
Senior Staff Professional
Staff Professional
Drafter/CADD Operator
Administrative Assistant
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00
Subtotal $0.00
Mileage $0.59 Mile 0 $0.00 Subtotal $0.00
Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Equipment Procurement
$0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Mobile Laboratory $0.00 $0.00
Subtotal $0.00
Surveying $0.00 $0.00
Subtotal $0.00
IDW
Hulls $175.00 $175.00
$0.00 $0.00 Subtotal $175.00
Utilities $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
Other $0.00 $0.00 $0.00 $0.00
Subtotal $0.00
TOTAL SUB $175.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00
RCRA-8 $14.00 0 0 $0.00
TOC $30.00 0 0 $0.00
TDS $16.00 0 0 $0.00
TRPH $88.00 0 0 $0.00
PFAS $315.00 0 0 $0.00
Subtotal $0.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00
Subtotal $0.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $0.00 IDW Related
Drum $100.00 Drum 0 $0.00 Subtotal $0.00
Expendables $40.00 Day 0 $0.00
Subtotal $0.00
Other $0.00 Day 0 $0.00
Subtotal $0.00
TOTAL EQUIPMENT $0.00
Review and signature of waste profile and manifest, including pickup coordiation
5/17/2022 Page 4 of 4 Subtask 5
1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207
PH 904.858.1818
FAX 904.396.1143
www.geosyntec.com
17 May 2022
Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Supplemental Site Assessment Scope of Work/Level of Effort Carriage Cleaners 3920 Confederate Point Road Jacksonville, Duval County, Florida FDEP Facility ID ERIC_4578
Dear Mr. Miller, Geosyntec has prepared this Scope of Work and Level of Effort (LOE) for supplemental site assessment activities at the Carriage Cleaners site (Site) located in Jacksonville, Florida (ERIC_4578). Geosyntec prepared this LOE based on FDEP’s 8 July 2021 Site Assessment Report (SAR) approval letter and subsequent discussions during the annual FDEP meeting on 26 April 2022. A description of task breakdown for Site assessment field activities and report preparation is provided below.
Subtask 1 – Project Management
Subtask 2 – Modified Active Gas Sampling (MAGS)
Subtask 2 includes costs for Geosyntec personnel to mobilize to the Site to re-test four MAGS wells (MAGS-004, -005, -006, and -008) to remove one, 10 to 15-ft radius of soil vapor volume using an appropriately sized blower capable of generating up to 50 standard cubic feet per minute.
The testing will be performed in accordance with the approach outlined in the April 2021 SAR.
As there was minimal change in the calculated ROI between 20 and 24 in-H2O during the October 2020 step tests, each MAGS test will be conducted with at least 24 in-H2O of applied vacuum with the goal of applying the maximum vacuum the system can produce. A soil vapor sample will be collected at each MAGS well after approximately one pore volume has been extracted and sent to a NELAP approved, fixed-based laboratory for analysis by EPA Method TO-15. The results of the MAGS study will be used to evaluate whether interim source removal efforts are warranted to address vadose zone impacts beneath the Site building.
Subtask 3 – Groundwater Sampling
Subtask 3 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. Prior to sampling, depth to water measurements will be collected from Site monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs). The samples will be stored on ice and shipped to a NELAP approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for VOHs by EPA Method 8260.
Subtask 4 – Supplemental Site Assessment Report
Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a SSAR documenting the supplemental Site assessment activities and summarizing analytical results. As part of this subtask, Geosyntec will import and tabulate the GIS data in the select electronic data deliverable format.
Subtask 5 – IDW Management
Subtask 5 includes costs for IDW transport and disposal. Bid costs prepared by the IDW haulers are summarized below and attached. The current non-hazardous waste profile with Hulls Environmental is assumed to be sufficient for IDW management efforts.
Water (per 55-gal. drum) Hulls Environmental $175 Hepaco $191.27 + $500 Stoppage Fee Universal Environmental Solutions $215
Deliverable and Invoicing Schedule:
Subtask Deliverable Deliverable Due Date
Invoice Amount
2 Field deliverable for MAGS testing 7/8/22 $7,910.70
3 Field deliverable for groundwater sampling 8/12/22 $3,674.15
1, 4, 5 Submittal of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files 9/16/22 $5,716.50
Total $17,301.35
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Blaine Dawson, P.G.
Project Geologist
Todd K. Kafka, P.G.
Sr. Principal Hydrogeologist
Attachments A – Subcontractor Quotes
| CEF.pdf |
| Cost Estimate |
| LOEs.pdf |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
File details come from the government source that posted it. Updated .