CN-370000-HW683-DC014A.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

About this file

Document Summary

This Task Assignment (TA) is a supplemental site assessment contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants. The TA, designated as DC014A under Contract Number HW683, authorizes environmental remediation and assessment services at the Carriage Cleaners site located at 3920 Confederate Point Road in Jacksonville, Duval County, Florida (FDEP Facility ID ERIC_4578). The project is managed by Evan Miller for FDEP and Blaine Dawson for Geosyntec, with Todd Kafka serving as Contract Manager.

The scope of work encompasses five subtasks with a total contract value of $17,301.35 and includes project management (Subtask 1), Modified Active Gas Sampling (MAGS) testing of four wells (Subtask 2; $7,910.70), groundwater sampling of monitoring wells (Subtask 3; $3,674.15), preparation of a Supplemental Site Assessment Report with GIS data compilation (Subtasks 1, 4, 5; combined $5,716.50), and contaminated IDW transport and disposal management (Subtask 5; $175.00). The contract utilizes a fixed unit rate pricing structure with deliverables and invoicing tied to completion milestones. Field activities are scheduled for completion by July 8, 2022 (MAGS testing) and August 12, 2022 (groundwater sampling), with final report submission by September 16, 2022. The work comprises 116 total labor hours and was authorized effective May 17, 2022, with a completion date of December 16, 2022.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC014A Completion December 16, 2022

This Task Assignment authorizes Geosyntec to conduct supplemental site assessment activities at the Carriage Cleaners site in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 17 May 2022.

Evan Miller 850-245-8928 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Blaine Dawson 904-450-4271

ERIC_4578

3920 Confederate Point Road Jacksonville, Duval County, Florida

Carriage Cleaners

✔ $ 17,301.35

$ 17,301.35

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.05.17 16:24:47 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.17 15:58:13 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2- Submittal of Field deliverable for MAGS testing 07/08/2022

Subtask 3- Submittal of Field deliverable for groundwater sampling 08/12/2022

Subtasks 1,4,5- Submittal of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files 09/16/2022

Subtask 2- FDEP receipt and approval of Field deliverable for MAGS testing $ 7,910.70

Subtask 3- FDEP receipt and approval of Field deliverable for groundwater sampling $ 3,674.15

Subtasks 1,4,5- FDEP receipt and approval of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files $ 5,716.50

$ 17,301.35

HW683

DC014A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Carriage Cleaners Jacksonville, Duval County

ERIC_4578

From: Evan Miller, Project Manager Date: May 17, 2022 Subject: Negotiation Summary

HW683 DC014A

This Task Assignment authorizes Geosyntec to conduct supplemental site assessment activities at the Carriage Cleaners site

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2 – Modified Active Gas Sampling (MAGS) Subtask 2 includes costs for Geosyntec personnel to mobilize to the Site to re-test four MAGS wells (MAGS-004, -005, -006, and -008) and to remove one, 10 to 15-ft radius of soil vapor volume using an appropriately sized blower capable of generating up to 50 standard cubic feet per minute. As there was minimal change in the calculated ROI between 20 and 24 in-H2O during the October 2020 step tests, each MAGS test will be conducted with at least 24 in-H2O of applied vacuum with the goal of applying the maximum vacuum the system can produce. A soil vapor sample will be collected at each MAGS well after approximately one pore volume has been extracted and sent to a NELAP approved, fixed-based laboratory for analysis by EPA Method TO-15.

Subtask 3 – Groundwater Sampling Subtask 3 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. Prior to sampling, depth to water measurements will be collected from Site monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs).

Subtask 4 – Supplemental Site Assessment Report Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a SSAR documenting the supplemental Site assessment activities and summarizing analytical results. As part of this subtask, Geosyntec will import and tabulate the GIS data in the select electronic data deliverable format.

MEMORANDUM

Error! Reference source not found.

May 17, 2022 Page Two

Subtask 5 – IDW Management Subtask 5 includes costs for IDW transport and disposal.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $17,301.35 with 116 labor hours.

Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 5/17/2022

Task #: SubTask 1 Project Management SubTask 6

Site: Carriage Cleaners SubTask 2 MAGS Assessment SubTask 7

Activity/Phase: Assessment SubTask 3 Groundwater Sampling SubTask 8

Project Manager: Evan Miller SubTask 4 SSAR SubTask 9

SubTask 5 IDW Management SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.79 Project Manager B. Dawson 11 11.2 $68.75 Principal T. Kafka 2 1 0 1 0 0 0 0 0 0

$0.00 Principal 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0

$42.79 Project Professional B. Dawson 11 3 3 4 1 0 0 0 0 0 $46.15 Project Professional M. Hensley 4 0 0 4 0 0 0 0 0 0 $39.42 Professional J. Mills 25 25 0 0 0 0 0 0 0 0

$0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$32.21 Senior Staff Professional A. Langteau 4 0 0 4 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0

$30.29 Staff Professional D. McGill 58 13 21 24 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Designer 0 0 0 0 0 0 0 0 0 0 $0.00 Drafter/CADD Operator 0 0 0 0 0 0 0 0 0 0

$37.26 Administrative Assistant P. Gallagher 1 0 0 1 0 0 0 0 0 0 $0.00 Clerical 0 0 0 0 0 0 0 0 0 0 $0.00 Intern 0 0 0 0 0 0 0 0 0 0

Total Hours 116 11 42 24 38 1 0 0 0 0 0

Direct Labor $4,182.37 $481.16 $1,576.39 $764.46 $1,317.57 $42.79 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $7,222.95 $830.96 $2,722.43 $1,320.22 $2,275.44 $73.90 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,405.32 $1,312.12 $4,298.82 $2,084.68 $3,593.01 $116.69 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $175.00 $0.00 $0.00 $0.00 $175.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $175.00 $0.00 $0.00 $0.00 $175.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $17.50 $0.00 $0.00 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $192.50 $0.00 $0.00 $0.00 $192.50 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,311.00 $800.00 $511.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,531.00 $910.00 $621.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $580.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $712.00 $132.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,000.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,552.00 $1,792.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,160.82 $1,312.12 $7,480.82 $3,465.68 $3,593.01 $309.19 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,140.53 $131.21 $429.88 $208.47 $359.30 $11.67 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $17,301.35 $1,443.33 $7,910.70 $3,674.15 $3,952.31 $320.86 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 1 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Carriage Cleaners SUBTASK: MAGS Assessment

DATE: 5/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional

Project Professional B. Dawson 3

Professional J. Mills

Senior Staff Professional

Staff Professional D. McGill 13

Drafter/CADD Operator

Administrative Assistant

TOTAL LABOR 42

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00

$120.00 Day 4 $480.00 Van $120.00 Day 0 $0.00

Subtotal $480.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Mobile Laboratory $0.00 $0.00

Subtotal $0.00

Surveying $0.00 $0.00

Subtotal $0.00

IDW

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Utilities $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Other $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00

RCRA-8 $14.00 0 0 $0.00

TOC $30.00 0 0 $0.00

TDS $16.00 0 0 $0.00

TRPH $88.00 0 0 $0.00

TO-15 - Gas $200.00 4 0 $800.00

Subtotal $800.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $910.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Vapor Sampling Kit $290.00 Day 2 $580.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00

Subtotal $580.00 Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Air Sampling Canister $33.00 Each 4 $132.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $132.00 IDW Related

Drum $100.00 Drum 0 $0.00 Subtotal $0.00

Expendables $40.00 Day 2 $80.00

Subtotal $80.00

Other $19.00 Day 2 $38.00 $18.00 Day 2 $36.00 $180.00 Day 2 $360.00 $33.00 Day 2 $66.00 $250.00 Day 2 $500.00

Subtotal $1,000.00

TOTAL EQUIPMENT $1,792.00

Evaluating and interpreting field data

Property owner notification (1); Evaluating and interpreting field data (1); Prepare field package (1)

Mob/demob (8 hr round trip to JAX + 1 hr/day x 2 day = (10 hr); Field preparation (2 hr);

Calibration of instruments (1 hr); MAGS testing (4 wells; 8 hr); MAGS data evaluation (2 hr); MAGS Table and figure generation (2 hr)

Field preparation (1 hr); Mob/demob (1 hr/day x 2 days = 2 hr); MAGS testing (4 wells; 8 hr); Prepare field package (2)

Truck ( 1 vehicle Tampa 2 days; 1 vehicle Jax 2 days)

Portable Generator Air Flow Meter Regenerative Blower Differential Pressure Gauge Vacuum Gauges

5/17/2022 Page 1 of 4 Subtask 2

SUBTASK: Groundwater Sampling

DATE: 5/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Senior Professional

Project Professional B. Dawson 3

Professional

Senior Staff Professional

Staff Professional D. McGill

Drafter/CADD Operator

Administrative Assistant

TOTAL LABOR 24

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00

Subtotal $0.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Mobile Laboratory $0.00 $0.00

Subtotal $0.00

Surveying $0.00 $0.00

Subtotal $0.00

IDW

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Utilities $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Other $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs $70.00 0 0 $0.00 VOHs $73.00 7 0 $511.00 VOAs $60.00 0 0 $0.00

RCRA-8 $14.00 0 0 $0.00

TOC $30.00 0 0 $0.00

TDS $16.00 0 0 $0.00

TRPH $88.00 0 0 $0.00

PFAS $315.00 0 0 $0.00

Subtotal $511.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $621.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00

Subtotal $0.00 Analytical Related

Groundwater Sampling Kit $290.00 Day 2 $580.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $580.00 IDW Related

Drum $100.00 Drum 1 $100.00 Subtotal $100.00

Expendables $40.00 Day 2 $80.00

Subtotal $80.00

Other $0.00 Day 0 $0.00

Subtotal $0.00

TOTAL EQUIPMENT $760.00

Property owner notification (1); Evaluating and interpreting field data (1); Prepare field package (1)

Field preparation (3); Mob 2 days @ 1 hr/day (2); 3 water level measurements from MWs not sampled first day (1); Sampling 7 monitoring wells @ 1.5 hrs each (11); Sample management/shipping (2); IDW Management (1); Prepare field package (1)

5/17/2022 Page 2 of 4 Subtask 3

SUBTASK: SSAR

DATE: 5/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional

Project Professional B. Dawson 4

Project Professional M. Hensley 4

Senior Staff Professional A. Langteau 4

Staff Professional D. McGill 24

Drafter/CADD Operator

Administrative Assistant P. Gallagher 1

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00

Subtotal $0.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Mobile Laboratory $0.00 $0.00

Subtotal $0.00

Surveying $0.00 $0.00

Subtotal $0.00

IDW

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Utilities $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Other $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00

RCRA-8 $14.00 0 0 $0.00

TOC $30.00 0 0 $0.00

TDS $16.00 0 0 $0.00

TRPH $88.00 0 0 $0.00

PFAS $315.00 0 0 $0.00

Subtotal $0.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00

Subtotal $0.00 Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 Drum 0 $0.00 Subtotal $0.00

Expendables $40.00 Day 0 $0.00

Subtotal $0.00

Other $0.00 Day 0 $0.00

Subtotal $0.00

TOTAL EQUIPMENT $0.00

Report formatting and PDF compilation

Develop recommendations and path forward

SSAR preparation and PG seal

Updating of SSAR figures

GIS table data entry for 4 MAGS, 7 WLs, and 7 MWs @ 8 min/data point (3 hrs); GIS database data checker and submittal (1)

SSAR Preparation

5/17/2022 Page 3 of 4 Subtask 4

SUBTASK: IDW Management

DATE: 5/17/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

Senior Professional

Project Professional B. Dawson 1

Professional

Senior Staff Professional

Staff Professional

Drafter/CADD Operator

Administrative Assistant

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00

Subtotal $0.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00 $0.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Mobile Laboratory $0.00 $0.00

Subtotal $0.00

Surveying $0.00 $0.00

Subtotal $0.00

IDW

Hulls $175.00 $175.00

$0.00 $0.00 Subtotal $175.00

Utilities $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Other $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

TOTAL SUB $175.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs $70.00 0 0 $0.00 VOHs $73.00 0 0 $0.00 VOAs $60.00 0 0 $0.00

RCRA-8 $14.00 0 0 $0.00

TOC $30.00 0 0 $0.00

TDS $16.00 0 0 $0.00

TRPH $88.00 0 0 $0.00

PFAS $315.00 0 0 $0.00

Subtotal $0.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete $235.00 Day 0 $0.00

Subtotal $0.00 Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 Drum 0 $0.00 Subtotal $0.00

Expendables $40.00 Day 0 $0.00

Subtotal $0.00

Other $0.00 Day 0 $0.00

Subtotal $0.00

TOTAL EQUIPMENT $0.00

Review and signature of waste profile and manifest, including pickup coordiation

5/17/2022 Page 4 of 4 Subtask 5

1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207

PH 904.858.1818

FAX 904.396.1143

www.geosyntec.com

17 May 2022

Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Supplemental Site Assessment Scope of Work/Level of Effort Carriage Cleaners 3920 Confederate Point Road Jacksonville, Duval County, Florida FDEP Facility ID ERIC_4578

Dear Mr. Miller, Geosyntec has prepared this Scope of Work and Level of Effort (LOE) for supplemental site assessment activities at the Carriage Cleaners site (Site) located in Jacksonville, Florida (ERIC_4578). Geosyntec prepared this LOE based on FDEP’s 8 July 2021 Site Assessment Report (SAR) approval letter and subsequent discussions during the annual FDEP meeting on 26 April 2022. A description of task breakdown for Site assessment field activities and report preparation is provided below.

Subtask 1 – Project Management

Subtask 2 – Modified Active Gas Sampling (MAGS)

Subtask 2 includes costs for Geosyntec personnel to mobilize to the Site to re-test four MAGS wells (MAGS-004, -005, -006, and -008) to remove one, 10 to 15-ft radius of soil vapor volume using an appropriately sized blower capable of generating up to 50 standard cubic feet per minute.

The testing will be performed in accordance with the approach outlined in the April 2021 SAR.

As there was minimal change in the calculated ROI between 20 and 24 in-H2O during the October 2020 step tests, each MAGS test will be conducted with at least 24 in-H2O of applied vacuum with the goal of applying the maximum vacuum the system can produce. A soil vapor sample will be collected at each MAGS well after approximately one pore volume has been extracted and sent to a NELAP approved, fixed-based laboratory for analysis by EPA Method TO-15. The results of the MAGS study will be used to evaluate whether interim source removal efforts are warranted to address vadose zone impacts beneath the Site building.

Subtask 3 – Groundwater Sampling

Subtask 3 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. Prior to sampling, depth to water measurements will be collected from Site monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs). The samples will be stored on ice and shipped to a NELAP approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for VOHs by EPA Method 8260.

Subtask 4 – Supplemental Site Assessment Report

Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a SSAR documenting the supplemental Site assessment activities and summarizing analytical results. As part of this subtask, Geosyntec will import and tabulate the GIS data in the select electronic data deliverable format.

Subtask 5 – IDW Management

Subtask 5 includes costs for IDW transport and disposal. Bid costs prepared by the IDW haulers are summarized below and attached. The current non-hazardous waste profile with Hulls Environmental is assumed to be sufficient for IDW management efforts.

Water (per 55-gal. drum) Hulls Environmental $175 Hepaco $191.27 + $500 Stoppage Fee Universal Environmental Solutions $215

Deliverable and Invoicing Schedule:

Subtask Deliverable Deliverable Due Date

Invoice Amount

2 Field deliverable for MAGS testing 7/8/22 $7,910.70

3 Field deliverable for groundwater sampling 8/12/22 $3,674.15

1, 4, 5 Submittal of SSAR, Final Waste Manifest, and GIS Data Tables, and ADaPT files 9/16/22 $5,716.50

Total $17,301.35

Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.

Sincerely, Blaine Dawson, P.G.

Project Geologist

Todd K. Kafka, P.G.

Sr. Principal Hydrogeologist

Attachments A – Subcontractor Quotes

CEF.pdf
Cost Estimate
LOEs.pdf
Subtask 2
Subtask 3
Subtask 4
Subtask 5

File details come from the government source that posted it. Updated .