Document Summary

This document constitutes a Task Assignment (TA) under Contract Number HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. for environmental remediation services at Scott's Custom Cleaners, Inc., located at 2454 McMullen Booth Road, Suite 205, Clearwater, Florida 33759 (FDEP Site ID: ERIC_5307). The Task Assignment Number is DC011A with a completion date of February 22, 2023. The project is managed by Evan Miller for FDEP (850-245-8928) and Todd Kafka for Geosyntec (813-379-4396).

Geosyntec will prepare an Interim Source Removal (ISR) Work Plan to address vadose zone soil impacts using a soil vapor extraction (SVE) system for soils from 0 to 3 feet below land surface, along with associated bid documents, technical specifications, and contractor evaluation services. The scope encompasses four subtasks: Project Management; ISR Work Plan preparation (due July 29, 2022, invoiced at $12,074.19); Bid Documents and Technical Specifications (due September 30, 2022, invoiced at $4,395.16); and Submittal to Subcontractors, Site Walk, and Bid Evaluation (due December 22, 2022, invoiced at $6,357.94). The total fixed unit rate contract value is $22,827.29, comprising 181 labor hours with vehicle rental costs of $400.00. Invoicing is contingent upon FDEP receipt and approval of deliverables in accordance with the specified schedule.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC011A Completion February 22, 2023

This Task Assignment authorizes Geosyntec to prepare an Interim Source Removal (ISR) Work Plan in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 13 April 2022.

Evan Miller 850-245-8928 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Todd Kafka 813-379-4396

ERIC_5307

2454 McMullen Booth Road, Suite 205 Clearwater, Florida 33759

Scott’s Custom Cleaners, Inc.

✔ $ 22,827.29

$ 22,827.29

Scope of Work

Todd K Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.04.14 10:06:17 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.04.14 09:56:48 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2- Submittal of ISR Work Plan 07/29/2022

Subtask 3- Submittal of Bid Documents and Technical Specifications 11/30/2022

Subtask 1, 4 Submittal to Subcontractors, Site Walk, and Bid Evaluation; Project Management 12/22/2022

Subtask 2- FDEP receipt and approval of ISR Work Plan $ 12,074.19

Subtask 3- FDEP receipt and approval of Bid Documents and Technical Specifications $ 4,395.16

Subtask 1, 4 FDEP receipt and approval of Submittal to Subcontractors, Site Walk, and Bid Evaluation; Project Management $ 6,357.94

$ 22,827.29

HW683

DC011A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Scott’s Custom Cleaners, Inc.

Clearwater, Pinellas County

ERIC_5307

From: Evan Miller, Project Manager Date: April 13, 2022 Subject: Negotiation Summary

HW683 DC011A

This Task Assignment authorizes Geosyntec to prepare an Interim Source Removal (ISR) Work Plan.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2 – ISR Work Plan Geosyntec anticipates that the ISR Work Plan will detail a soil vapor extraction (SVE) system to treat soils from 0 to 3 feet (ft) below land surface (BLS) identified in the Remedial Alternatives Evaluation Report prepared in August 2020. The ISR Work Plan will contain, but is not limited to, the following: results of soil assessment activities completed at the Site and the proposed SVE well layout (including the reuse of existing modified active gas sampling [MAGS] wells), conveyance piping layout, construction, and operation and maintenance (O&M) details (including a process and instrumentation diagram, well details, electrical connection to the system, and trenching cross section details). This ISR Work Plan will also include an engineering cost estimate for implementation and O&M.

Subtask 3 – Bid Documents and Technical Specifications Geosyntec will develop and prepare Bid Documents necessary to obtain Contractor costs to implement the ISR at the Site. The Bid Documents will include the specifications necessary for potential Contractors (i.e., bidders) to provide a cost to permit, mobilize, and prepare the Site for construction; complete trenching, backfilling, and install the treatment system; and perform Site restoration activities.

Subtask 4 – Bid Walk and Evaluation Geosyntec will develop a list of up to three qualified SVE Contractors for invitation to the Site to participate in a bid walk. Prior to scheduling the Site visit, Geosyntec will send interested Contractors copies of the ISR Work Plan and bid specifications approved by FDEP. Geosyntec will coordinate the visit with the Site property management company and current building tenant(s), and will conduct a 1-hour pre-call with both to conduct an overview of the ISR Work Plan and allow the property

MEMORANDUM

April 13, 2022 Page Two management company and building tenant(s) to provide input on logistics, layout changes (if Site conditions differ from those at the time of the ISR Work Plan), and how to minimize disruptions to facility operations.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $22,827.29 with 181 labor hours.

Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 4/13/2022

Task #: SubTask 1 Project Management SubTask 6

Site: SubTask 2 Interim Source Removal Work Plan SubTask 7

Activity/Phase: ISR Work Plan SubTask 3 Bid Documents and Technical Specifications SubTask 8

Project Manager: J. Mills SubTask 4 Submittal of Bid Evaluation SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$39.42 Project Manager J. Mills 22 21.8 $50.24 Senior Professional J. Bartlett 37 21 8 8 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 10 10 0 0 0 0 0 0 0 0 $39.42 Professional J. Mills 95 56 24 15 0 0 0 0 0 0 $39.90 Professional O. Cain 5 0 0 5 0 0 0 0 0 0 $29.30 Drafter/CADD Operator E. Davis 12 8 4 0 0 0 0 0 0 0

Total Hours 181 22 95 36 28 0 0 0 0 0 0

Direct Labor $7,476.51 $860.13 $3,958.46 $1,465.20 $1,192.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $12,911.93 $1,485.44 $6,836.26 $2,530.40 $2,059.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $20,388.44 $2,345.57 $10,794.72 $3,995.60 $3,252.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $400.00 $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $400.00 $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $20,788.44 $2,345.57 $10,994.72 $3,995.60 $3,452.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,038.85 $234.56 $1,079.47 $399.56 $325.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $22,827.29 $2,580.13 $12,074.19 $4,395.16 $3,777.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Scott's Custom Cleaners, Inc.

Cost Estimate Page 1 of 1 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Scott's Custom Cleaners, Inc.

SUBTASK: Interim Source Removal Work Plan

DATE: 4/13/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Professional J. Bartlett

Project Professional M. Hensley 10

Professional J. Mills

Drafter/CADD Operator E. Davis 8

TOTAL LABOR 95

VEHICLE TYPE RATE UNIT USEAGE

Car J. Bartlett $80.00 Day 1 $80.00 Van J. Mills $120.00 Day 1 $120.00

Subtotal $200.00

TOTAL VEHICLE $200.00

Prepare design drawings (process and instrumentation diagram, well details, electircal connection to system, and trench cross sections)

Mob/demob to Site from Titusville (6 hr). Site visit to evaluate ISR implementation (4 hr).

Pre- and post-Site visit design discussions with property owner and tenants (2 hr).

Establish design criteria with FDEP (1 hr). Technical design support, calculation packages, well and piping layouts, and monitoring plan. PE sign/seal (8 hr).

Prepare figures and design drawings

Mob/demob to the site from Tampa (2 hr). Site visit to evaluate ISR implementation (4 hr).

Summary of meeting notes and photo log to FDEP (2 hr). Pre- and post-Site visit design discussions with property owner and tenants (2 hr). Establish design criteria with FDEP (1 hr). Prepare ISR, design drawings, calculation package, and develop monitoring plan (45 hr)

4/13/2022 Page 1 of 3 Subtask 2

SUBTASK: Bid Documents and Technical Specifications

DATE: 4/13/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Professional J. Bartlett 8

Professional J. Mills 24

Drafter/CADD Operator E. Davis 4

TOTAL LABOR 36

Prepare bid spec drawings

PE development and certification of bid speicifications, contractor bid package

Prepare bid documents and technical specifications

4/13/2022 Page 2 of 3 Subtask 3

SUBTASK: Submittal of Bid Evaluation

DATE: 4/13/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Professional J. Bartlett

Professional J. Mills 15

Professional O. Cain 5

TOTAL LABOR 28

VEHICLE TYPE RATE UNIT USEAGE

Car O. Cain $80.00 Day 1 $80.00 Van J. Mills $120.00 Day 1 $120.00

Subtotal $200.00

TOTAL VEHICLE $200.00

Teleconference with tenants and property owner on design and implementation plans/schedule (2 hr). PE evaluation of bids and bid comparison, evaluate contractor selection and questions from bidders, requests for additional information (6 hr).

Teleconference with tenants and property owner on design and implementation plans/schedule (2 hr). Develop contractor bid list (2 hr). Mobilization to/from the site from Tampa (2 hr). Conduct site visit and bid walk with contractors and technical discussions with PE during bid walk (4 hr). Evaluate subcontractor bids and prepare bid comparison table (3 hr). Prepare selection summary for FDEP with recommended contractor (2 hr).

Mobilization to/from the site from Clearwater (1 hr). Conduct site visit and bid walk with contractors and technical discussions with PE during bid walk (4 hr).

4/13/2022 Page 3 of 3 Subtask 4

12802 Tampa Oaks Blvd., Suite 151 Tampa, FL 33637

PH 813-558-0990

FAX 813-558-9726

www.geosyntec.com

Scotts (ERIC_5307)_HW683 SOW_ISRWP_2022-04 final

13 April 2022

Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE – Interim Source Removal Work Plan

Scott’s Custom Cleaners, Inc.

2454 McMullen Booth Road, Suite 205 Clearwater, Florida 33759 FDEP Site ID No. ERIC_5307

Dear Mr. Miller:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this proposed Scope of Work (SOW) and Level of Effort (LOE) for remediation activities at the Scott’s Custom Cleaners, Inc. Site located in Clearwater, Florida (ERIC_5307). This SOW includes (i) preparing an Interim Source Removal (ISR) Work Plan, (ii) preparing Bid Documents, and (iii) soliciting bids from qualified Contractors and evaluating the Contractor bids for selection. A description of task breakdown for field activities and deliverable preparation is provided below.

Subtask 1 – Project Management

Subtask 2 – ISR Work Plan

This subtask includes costs associated with the preparation of an ISR Work Plan pursuant to Chapter 62-780.525, Florida Administrative Code to address vadose zone soil impacts at the Site under Suite 205, currently Acqua Alta Ristorante (an active restaurant). Specifically, Geosyntec anticipates that the ISR Work Plan will detail a soil vapor extraction (SVE) system to treat soils from 0 to 3 feet (ft) below land surface (BLS) identified in the Remedial Alternatives Evaluation Report prepared in August 2020. The ISR Work Plan will contain, but is not limited to, the following: results of soil assessment activities completed at the Site and the proposed SVE well layout (including the reuse of existing modified active gas sampling [MAGS] wells), conveyance piping layout, construction, and operation and maintenance (O&M) details (including a process and instrumentation diagram, well details, electrical connection to the system, and trenching cross section details). This ISR Work Plan will also include an engineering cost estimate for implementation and O&M.

http://www.geosyntec.com/

To support the preparation of the ISR Work Plan, Geosyntec will communicate with the Site property management company (currently Newmark) to discuss the design plan and coordinate logistics for a Site visit with the property management company and existing tenant(s). The objectives of the Site visit are to evaluate interior access for construction activities, such as trenching for subgrade conveyance piping runs or the use of above grade conveyance piping runs vertically through the building and onto the roof (or both); document current Site conditions;

discuss access and logistics (especially operational hours for the active restaurant versus working hours for system implementation) with the Site property management company and building tenant(s); determine a location for the system compound; and evaluate the presence of overhead and underground utilities. Due to the complexity of the Site footprint, challenges with implementation of the system in an active restaurant, and previous sensitivities in working within Suite 205, James Mills (project manager) and Joseph Bartlett (Engineer of Record) will conduct the Site visit. Effort has been included for Geosyntec to communicate with the property management company and existing tenant(s) before and after the Site walk to ensure the proposed design is appropriate (assumed two, 1-hour teleconferences with James Mills and Joseph Bartlett).

Prior to submittal of the ISR Work Plan, Geosyntec will provide the Florida Department of Environmental Protection (FDEP) with a photo log documenting existing Site conditions and a copy of notes and/or meeting minutes from discussions with the Site property management company and building tenant(s) that culminates in an acceptable conceptual design. The conceptual design will be discussed with the FDEP during a 1-hour teleconference to facilitate the SVE design and minimize FDEP comments.

Subtask 3 – Bid Documents and Technical Specifications

After FDEP’s approval of the ISR Work Plan, Geosyntec will develop and prepare Bid Documents necessary to obtain Contractor costs to implement the ISR at the Site. The Bid Documents will include the specifications necessary for potential Contractors (i.e., bidders) to provide a cost to permit, mobilize, and prepare the Site for construction; complete trenching, backfilling, and install the treatment system; and perform Site restoration activities.

The Bid Documents will include, but not be limited to, the following:

• Instructions for Bidders;

• Request for Bids on the Scope of Work;

• Construction Drawings;

• Technical Specifications; and

• Bid Proposal Form.

The Bid Documents and Technical Specifications section will include, but not be limited to, the following:

• Summary of work;

• Description of Site conditions, access constraints, overhead and subsurface utilities, historical soil data, etc.;

• Permitting (local, state, federal);

• Safety, health, and emergency response requirements;

• Site preparation and pre-mobilization activities (e.g., subsurface utility locating);

• Requirements for protection of existing structures, as applicable;

• Trenching locations and specifications;

• Conveyance piping and connection specifications;

• Backfill specifications;

• Electrical connection requirements and electrical subcontractor costs;

• Telemetry system connection and operational requirements;

• Waste profiling, manifesting, transportation, and disposal requirements; and

• Site restoration, and demobilization requirements.

Subtask 4 – Bid Walk and Evaluation

Following FDEP’s review and approval of the Bid Documents and Technical Specifications, Geosyntec will develop a list of up to three qualified SVE Contractors for invitation to the Site to participate in a bid walk. Prior to scheduling the Site visit, Geosyntec will send interested Contractors copies of the ISR Work Plan and bid specifications approved by FDEP. Geosyntec will coordinate the visit with the Site property management company and current building tenant(s), and will conduct a 1-hour pre-call with both to conduct an overview of the ISR Work Plan and allow the property management company and building tenant(s) to provide input on logistics, layout changes (if Site conditions differ from those at the time of the ISR Work Plan), and how to minimize disruptions to facility operations. This information will allow for the Site visit to run smoothly and provide the best opportunity for setting clear expectations for the Contractors. No additional labor has been included to address requests or changes from the discussions with the property management company and current building tenant(s) during the ISR Work Plan preparation.

The Site visit will be attended by James Mills (project manager) and Olivia Cain (Engineer) with support from Joe Bartlett (Engineer of Record). Geosyntec will provide a copy of notes and/or meeting minutes from discussions with the Site property management company and building tenant(s).

Geosyntec will respond to requests for additional information (RAIs) submitted by Contractors following the Site visit. Geosyntec will review Contractor bids and evaluate costs and approaches to identify the best value to FDEP. Geosyntec will submit a package containing the Contractor bids, RAIs, bid evaluation, and our recommendation for Contactor selection to FDEP to serve as the deliverable for this Subtask. We anticipate implementation of the ISR will be performed under a separate Task Assignment.

Invoice and Deliverable Schedule

Geosyntec proposes the following deliverables and Period of Performance (through 24 February 2023) schedule below.

Subtask Deliverable Deliverable Due Date Invoice Amount

2 ISR Work Plan 29 July 2022 $12,074.19

3 Bid Documents and Technical Specifications 30 September 2022 $4,395.16

1,4 Submittal to Subcontractors, Site Walk, and Bid Evaluation 22 December 2022 $6,357.94

Total $22,827.29

The above schedule is based on the assumptions that Geosyntec is tasked for this scope of work by 22 April 2022.

Assumes Geosyntec submits the ISR Work Plan by 29 July 2022 and the FDEP approves the ISR Work Plan by 30 August 2022. Assumes Geosyntec submits the draft Bid Documents by 30 September 2022, that the FDEP approves the Bid Documents by 31 October 2022, and Geosyntec submits the Bid Documents to bidders by 14 November 2022. Assumes the bid walk is conducted and the bids are received by Geosyntec no later than 2 December 2022, and Geosyntec submits the Bid Evaluation Letter by 22 December 2022.

CLOSURE

Please review and contact us if you have any questions or require additional information. As always, it is a pleasure to work with the FDEP.

Sincerely, James C. Mills, M.S. Todd K. Kafka, P.G. (FL) Professional Senior Principal Hydrogeologist

Copies to Joseph Bartlett, Geosyntec

Attachments: CEF-LOE

CEF.pdf
Cost Estimate
LOEs.pdf
Subtask 2
Subtask 3
Subtask 4
Scotts (ERIC_5307)_HW683 SOW_ISRWP_2022-04.pdf
Subtask 1 – Project Management
Subtask 2 – ISR Work Plan
Subtask 3 – Bid Documents and Technical Specifications
Subtask 4 – Bid Walk and Evaluation
Invoice and Deliverable Schedule