This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. for environmental monitoring services at the Classic Cleaners site in Stuart, Martin County, Florida. The TA is executed under Contract Number HW683 and is identified as TA Number DC004D, effective through October 18, 2024. The project is associated with ERIC 4929 and involves coordination between FDEP Project Manager Sarah Aduwa and Geosyntec's Project Manager Tori Hood.

The scope of work consists of three subtasks: project management, annual Natural Attenuation Monitoring (NAM) groundwater sampling at four monitoring wells (MW001, MW002, MW006, and MW007), and preparation of a NAM report with Investigation Derived Waste (IDW) management. Geosyntec will measure water levels at ten site monitoring wells to evaluate groundwater flow direction, containerize purge water in one 55-gallon drum, and prepare a comprehensive report including field and laboratory data summaries, groundwater flow figures, and a signed waste manifest. The total contract value is $8,725.86 on a fixed unit rate basis, consisting of 56 labor hours distributed across project management, field sampling, and reporting activities. The primary deliverable—an Annual NAM Report and IDW manifest—is due September 18, 2024. IDW disposal has been subcontracted to Erwin Remediation at $195.00 per drum. No funding information is specified beyond the total project cost, and no option periods or renewals are identified in the TA.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC004D Completion October 18, 2024

This Task Assignment authorizes Geosyntec to conduct Natural Attenuation Monitoring activities at Classic Cleaners site in accordance with Geosyntec’s scope of work and cost estimate received on the June 5, 2024.

Sarah Aduwa 850-245-8973 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Tori Hood 225-955-1864

ERIC 4929

3307 SE Federal Highway Stuart, Martin County, Florida 34997

Classic Cleaners

✔ $ 8,725.86

$ 8,725.86

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2024.06.26 11:24:07 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.26 10:58:11 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 1,2,3 - Annual NAM report and IDW manifest 09/18/2024

Subtask 1,2,3 - Annual NAM report and IDW manifest $ 8,725.86

$ 8,725.86

HW683

DC004D

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Classic Cleaners Stuart, Martin County, Florida

ERIC_4929

From: Sarah Aduwa, Project Manager Date: June 5, 2024 Subject: Negotiation Summary

HW683_DC004D

This Task Assignment authorizes Geosyntec to conduct Natural Attenuation Monitoring activities at Classic Cleaners site in accordance with Geosyntec's scope of work and cost estimate received on the June 5, 2024.

Subtask 2- Geosyntec will mobilize to the Site to conduct annual NAM groundwater monitoring of four (4) monitoring wells: MW001, MW002, MW006, and MW007. Field personnel will measure water levels in 10 site monitoring wells to evaluate groundwater flow direction.

Subtask 3 - Purge water generated during sampling activities will be containerized in one (1) 55-gallon drum. Geosyntec will prepare a Natural Attenuation Monitoring Report documenting the results of the NAM event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the NAM Report.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assigner. The final cost is $8725.86 with 56 labor hours.

Printed on recycled paper.

FDEP COST ESTI MATEContractor: Geosyntec Consultants, Inc.

Date: 6/5/2024

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Classic Cleaners SubTask 2 NAM Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 NAM Reporting SubTask 8

Project Manager: Tori Hood SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.63 Project Manager T. Hood 7 7.1 $97.11 Principal T. Kafka 6 2 4 0 0 0 0 0 0 0 $54.57 Project Professional M. Hensley 4 0 4 0 0 0 0 0 0 0 $40.63 Senior Staff Professional T. Hood 21 2 19 0 0 0 0 0 0 0 $31.73 Senior Staff Professional T. Tompkins 17 14 3 0 0 0 0 0 0 0 $36.54 Administrative Assistant S. Darling 1 0 1 0 0 0 0 0 0 0

Total Hours 56 7.1 18.0 31.0 0 0 0 0 0 0 0

Direct Labor $2,520.04 $289.92 $719.70 $1,510.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,352.11 $500.69 $1,242.92 $2,608.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,872.15 $790.61 $1,962.62 $4,118.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATEContractor: Geosyntec Consultants, Inc.

Date: 6/5/2024

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Classic Cleaners SubTask 2 NAM Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 NAM Reporting SubTask 8

Project Manager: Tori Hood SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $19.50 $0.00 $19.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $292.00 $292.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $402.00 $402.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $430.00 $430.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $8,038.65 $790.61 $2,914.62 $4,333.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $687.21 $79.06 $196.26 $411.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,725.86 $869.67 $3,110.88 $4,745.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $8,725.86 Auto-Calculated

Final Total Cost: $8,725.86 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Classic Cleaners SUBTASK 2: NAM Sampling

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Staff Professional T. Hood 2

Senior Staff Professional T. Tompkins 14

TOTAL LABOR 18

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 1 $120.00 Subtotal $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs $73.00 4 0 $292.00

Subtotal $292.00

Shipping Large cooler (25 to 50 lbs) $150.00 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $402.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 1 $290.00 Subtotal $290.00

IDW Related Drum $100.00 ea 1 $100.00

Subtotal $100.00 Expendables

$40.00 Day 1 $40.00 Subtotal $40.00

TOTAL EQUIPMENT $430.00

Field H&S with team (1 hr); RPO and tenant notifications (1 hr)

Field Preparation (1 hr); Mob/demob (2 hrs), collect water levels at 10 site MWs (2 hrs); pre/post GW equipment calibration (1 hr); sample 4 MWs (1.5 hrs/well x 4 wells = 6 hrs); IDW management (1 hr); sample management (1 hrs)

Evaluating and interpreting field data (1 hr), technical support (1 hr)

FINAL --7/24/96

SITE : Classic Cleaners SUBTASK 3: NAM Reporting

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 4

Project Professional M. Hensley 4

Senior Staff Professional T. Hood 19

Senior Staff Professional T. Tompkins 3

Administrative Assistant S. Darling 1

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW Transport & Disposal Erwin $195.00/drum 1 $195.00 $195.00

Subtotal $195.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Discussions with RPO on conditional closure (2 hr); NAM report data evaluation/interpretation (1 hr), PG certification of report (1 hr)

Prepare GW contour figure (2 hrs) and GW results figure (2 hrs)

Characterization and waste profile for transportation and disposal of IDW drum (1); Prepare Annual NAM report and draft figures (16); prepare materials for conditional closure discussion with RPO and conduct discussion (2hrs)

Prepare report tables, draft figures, appendices

Non-Haz PFAS Impacted water

PDF compilation and assembly

12802 Tampa Oaks Blvd., Suite 151 Tampa, Florida 33637

PH 813.558.0990

FAX 813.558.9726

www.geosyntec.com

/2024 Annual NAM_Classic Cleaners (ERIC_4929) SOW

5 June 2024

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: Scope of Work and Level of Effort Annual NAM Groundwater Sampling Classic Cleaners (ERIC_4929) 3307 SE Federal Highway Stuart, Martin County, Florida 34997

Dear Ms. Aduwa:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work (SOW) and proposed Level of Effort (LOE) for annual Natural Attenuation Monitoring (NAM) at the Classic Cleaners (Site) (ERIC_4929) located in Stuart, Florida.

On 31 May 2024, Geosyntec confirmed the Site property is still owned by Indian Street Shoppes, LLC, with whom the existing site access agreement was executed on March 24, 2016.

SCOPE OF WORK

Subtask 1 – Project Management

Tori Hood will serve as the Project Manager for the proposed SOW. Costs associated with this subtask are directly computed.

Subtask 2 – Annual NAM Sampling

This subtask includes labor and expenses to conduct the following:

• Geosyntec will notify the owner/tenant of scheduled groundwater sampling activities.

• Geosyntec will mobilize to the Site to conduct annual NAM groundwater monitoring of four (4) monitoring wells: MW001, MW002, MW006, and MW007 (figure attached).

These monitoring wells were recommended in the 2023 Annual NAM Report.

Classic Cleaners – 2024 Annual NAM 5 June 2024

/Classic Cleaners_SOW_Annual NAM 2024 o MW001 is adjacent to the former drycleaning machine and had a tetrachloroethene (PCE) groundwater cleanup target level (GCTL) exceedance in July 2023.

o Exceedances of the GCTL for PCE and trichloroethene (TCE) were detected in MW002 in June 2022 o MW006 is a downgradient monitoring well that has not had volatile organic compounds (VOHs) above GCTLs since September 2020.

o Exceedances of GCTLs for PCE and TCE were detected in MW007 in July 2023.

o Field personnel will measure water levels in 10 site monitoring wells to evaluate groundwater flow direction.

Subtask 3: Investigation Derived Waste (IDW) Management & Annual NAM Report

Purge water generated during sampling activities will be containerized in one (1) 55-gallon drum.

It is assumed that the monitoring well analytical data can be used for waste profiling and an investigation derived waste (IDW) sample will not be required.

Based on the cost estimates provided in Attachment A for IDW disposal, Geosyntec has selected Erwin Remediation as the most cost-effective transporter and disposal option. We have assumed oversight for drum pickup will not be required.

Company Non-Hazardous PFAS Impacted Water (per 55-gal drum)

EnviroServe $242.50

Erwin $195.00

Hull $1,200.00

Geosyntec will prepare a Natural Attenuation Monitoring Report documenting the results of the NAM event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the NAM Report.

The report will be signed and sealed by a Florida-licensed professional geologist or engineer. Additionally, effort has been included to discuss conditional closure options with the Site owner prior to report submittal.

Classic Cleaners – 2024 Annual NAM 5 June 2024

/Classic Cleaners_SOW_Annual NAM 2024

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due Date

Invoice Amount

1, 2, 3 Annual NAM Report, IDW manifest 09/18/2024 $8,725.86 Total $8,725.86

As always, we appreciate the opportunity to continue working on this project for the FDEP. Please contact us at 561.922.1086 if you have any questions.

Sincerely, Tori Hood Todd K. Kafka, PG (FL, VA, TN) Senior Staff Professional Senior Principal Hydrogeologist

Attachments Figures A - Subcontractor Evaluation

LOE/CEF

MW002

MW003

MW005

SUITE 3309

CLASSIC CLEANERS

MW001

MW006

MW004

MW007

MW008

3 μg/L PCE ISOPLETH

MONITORING WELL LOCATION

N

LEGEND:

3 μg/L TCE ISOPLETH (DASHED WHERE

INFERRED)

NOTES:

1. DEPTHS ARE PRESENTED IN FEET BELOW LAND

SURFACE (FT. BLS).

2. RESULTS AND SCREENING CRITERIA ARE PRESENTED IN

MICROGRAMS PER LITER (μg/L).

3. U INDICATES THAT THE RESULT IS NOT ABOVE THE

METHOD DETECTION LIMIT (MDL), INDICATED IF

AVAILABLE.

4. I INDICATES VALUE IS ABOVE THE MDL BUT BELOW

PRACTICAL QUANTITATION LIMITS.

5. DETECTIONS ARE SHOWN IN BOLD TEXT.

6. YELLOW SHADING INDICATES CONCENTRATION IS

GREATER THAN THE FLORIDA GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

7. ORANGE SHADING INDICATES CONCENTRATION IS

GREATER THAN THE FLORIDA NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC).

8. NA INDICATES NOT ANALYZED.

J:

\J

A X

-C A

D \F

\F D

E P

C

LA

S S

IC

C

LE

A

N E

R S

\G

- O

C

TO

B E

R

S A

M P

LI

N

G E

V E

N T\

FI

G

U R

E S

\F R

E

5.

D W

G (8

A ug us t 2

3) m no la nd

Figure:

September 2023

GROUNDWATER ANALYTICAL RESULTS

CLASSIC CLEANERS

3307 SE FEDERAL HIGHWAY

STUART, MARTIN COUNTY, FLORIDA

TAMPA, FL

0 15' 30'

SCALE IN FEET

SCREENING CRITERIA

ACRONYM CONSTITUENT GCTL NADC

PCE TETRACHLOROETHENE 3 300

TCE TRICHLOROETHENE 3 300

cDCE CIS-1,2-DICHLOROETHENE 70 700 tDCE TRANS-1,2-DICHLOROETHENE 100 1,000

1,1-DCE 1,1-DICHLOROETHENE 7 70

VC VINYL CHLORIDE 1 100

MW001

SCREENED INTERVAL 3-13 FT. BLS

CONSTITUENT 1/17/2018 9/17/2018 4/2/2019 7/8/2019 1/20/2020 6/11/2020 9/24/2020 7/29/2021 1/11/2022 6/9/2022 2/8/2023 7/14/2023

PCE 88 13 7.6 4.0 4.3 8.1 5.1 5.1 1.8 I 2.8 3.2 6.9

TCE 14 5.1 2.4 1.8 I 2.2 2.2 3.0 1.3 I 2.3 1.1 I 2.4 1.9

cDCE 9.5 3.7 0.87 I 0.79 I 1.5 1.1 1.7 0.65 I 1.5 0.49 I 1.1 0.81 I tDCE 0.72 I 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.73 U 0.73 U

1,1-DCE 0.26 U 0.26 U 0.26 U NA NA 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.94 U 0.94 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.71 U 0.71 U

MW002

SCREENED INTERVAL 10-20 FT. BLS

CONSTITUENT 1/17/2018 9/17/2018 4/2/2019 7/8/2019 1/20/2020 6/11/2020 9/24/2020 7/29/2021 1/11/2022 1/11/2022 6/9/2022 2/8/2023 7/14/2023

PCE 11 43 38 30 20 21 28 8.7 6.5 6.3 4.5 3.0 0.85 I

TCE 4.8 10 15 5.3 7.2 4.2 7 2 4.0 4.0 3.7 1.3 0.89 U

cDCE 2.7 7.1 4.6 1.0 2.6 1.4 2.1 3.6 13 13 11 1.5 0.53 U tDCE 0.39 U 0.52 I 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.41 I 1.4 I 1.2 I 1.1 I 0.73 U 0.73 U

1,1-DCE 0.26 U 0.32 U 0.26 U NA NA 0.26 U 0.32 U 0.26 U 0.26 U 0.26 U 0.26 U 0.94 U 0.94 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.71 U 0.71 U

MW007

SCREENED INTERVAL 2.5-12.5 FT. BLS

CONSTITUENT 1/17/2018 4/3/2019 7/8/2019 1/20/2020 6/11/2020 9/24/2020 7/29/2021 7/29/2021 1/11/2022 7/5/2022 (DUP) 2/8/2023 7/14/2023

PCE 460 76 26 98 61 79 87 96 32 21 41 41

TCE 18 11 5.0 15 22 31 16 15 6.7 13 27 38

cDCE 6.5 1.4 0.53 I 1.9 4.0 6.1 2.7 2.5 1.5 2.3 14 12 tDCE 0.78 U 0.39 U 0.39 U 0.39 U 0.91 I 0.63 I 0.39 U 0.39 U 0.39 U 0.42 I 1.7 2 1,1-DCE 0.52 U 0.26 U NA NA 0.26 U 0.32 U 0.26 U 0.26 U 0.26 U 0.26 U 0.94 U 0.94 U

VC 0.51 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.71 U 0.71 U

MW004

SCREENED INTERVAL 10-20 FT. BLS

CONSTITUENT 1/16/2018 4/3/2019 7/8/2019 1/20/2020 6/11/2020 9/24/2020 7/29/2021 1/11/2022 7/6/2022

PCE 0.50 U 0.50 U 0.50 U 050 U 0.50 U 0.50 U 0.29 U 0.29 U 0.29 U

TCE 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U

cDCE 0.26 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U tDCE 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U

1,1-DCE 0.26 U 0.26 U NA NA 0.26 U 0.32 U 0.32 U 0.26 U 0.26 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U

MW006

SCREENED INTERVAL 10-20 FT. BLS

CONSTITUENT 1/16/2018 4/2/2019 7/8/2019 1/20/2020 6/12/2020 9/25/2020 7/29/2021 1/11/2022 7/5/2022 2/8/2023 7/14/2023

PCE 0.50 U 2.5 1.5 I 1.4 I 1.3 I 18 0.29 U 0.29 U 0.29 U 0.76 U 0.76 U

TCE 1.7 I 1.3 I 8.5 11 0.61 U 8.3 0.61 U 0.61 U 0.61 U 0.89 U 0.89 U

cDCE 1.2 1.0 20 34 032 U 70 0.32 U 0.32 U 0.32 U 0.53 U 0.53 U tDCE 0.39 U 0.39 U 2.6 4.2 0.39 U 1.5 I 0.39 U 0.39 U 0.39 U 0.73 U 0.73 U

1,1-DCE 0.26 U 0.26 U NA NA 0.26 U .032 U 0.26 U 0.26 U 0.26 U 0.94 U 0.94 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.71 U 0.71 U

LOCATION OF FORMER PCE DRY

CLEANING MACHINE

LOCATION OF FORMER PETROLEUM

SOLVENT DRY CLEANING MACHINE

MW008

SCREENED INTERVAL 10-20 FT. BLS

CONSTITUENT 1/20/2020 6/12/2020 9/24/2020 7/29/2021 1/11/2022 7/5/2022

PCE 0.50 U 0.91 I 0.50 U 0.29 U 0.29 U 0.29 U

TCE 5.7 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U

cDCE 12 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U tDCE 1.2 I 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U

1,1-DCE 0.26 U 0.26 U 0.32 U 0.26 U 0.26 U 0.26 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U

MW003

SCREENED INTERVAL 43-48 FT. BLS

CONSTITUENT 1/17/2018 4/3/2019 7/8/2019 1/20/2020 6/11/2020 9/24/2020 7/29/2021 1/11/2022 7/5/2022

PCE 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.29 U 0.29 U 0.29 U

TCE 0.50 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U

cDCE 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U tDCE 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U

1,1-DCE 0.26 U 0.26 U NA NA 0.26 U .032 U 0.26 U 0.26 U 0.26 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U

MW005

SCREENED INTERVAL 10-20 FT. BLS

CONSTITUENT 1/17/2018 4/2/2019 7/8/2019 1/20/2020 6/11/2020 9/25/2020 7/29/2021 7/6/2022

PCE 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.29 U 0.29 U

TCE 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U 0.61 U

cDCE 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U 0.32 U tDCE 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U 0.39 U

1,1-DCE 0.26 U 0.26 U NA NA 0.26 U 0.32 U 0.32 U 0.26 U

VC 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U 0.26 U

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Ms. Olivia Cain Geosyntec Consultants, Inc.

19321 US Highway 19 North Clearwater, FL 33764

May 10, 2024

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Ms. Cain:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:

Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:

Description Rate Unit

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D - Non-Haz Mud/Water $ 125.00 Per Drum

Impacted with Non-Hazardous PFAS/PFOS:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.

This quote is valid for 120 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Phone: 850-466-2358 Email: robert@erwinremediation.com

755 Prairie Industrial Parkway, Mulberry, Florida 33860 Telephone (863) 425-4884

Disposal Pricing Effective January 1, 2024

GEOSYNTEC CONSULTANTS

DRUMS WASTE PROCESSING

Size (gal) Trans Liquid

Light Debris

Sludge or Oil Dry Solids Gels

Lab Packs

Empty Trans

Empty Disp

1 $2 $5 $5 $8 $8 $8 $25 $3 $5 5 $5 $10 $10 $12 $12 $15 $75 $5 $5

10 $10 $20 $20 $20 $20 $30 $75 $5 $5 15-25 $15 $40 $40 $55 $55 $65 $100 $10 $8

55 Below $80 $80 $80 $80 $105 $175 $10 $15 85 Below $80 $80 $125 $125 $155 $15 $20 yd³ Below $180 $210 $250 $250 $350 $80

251-400 miles - $50/drum ($60/85-gal) Totes- $200 <11 drums/site – Surcharge of $200/site 101-250 miles - $40/drum ($50/85-gal) Totes- $160 < 6 drums/site – Surcharge of $50/site 0-100 miles - $30/drum ($40/85-gal) Totes- $120 < 6 drums/site – Surcharge of $50/site New Empties- $40 + Tax

BULK - Based on Centrifuge Testing (v/v) per SOP WASTE PROCESSING

Liquids <10% Solid

Sludge 10-25% Solid Solids

Sludge >25%

Light Debris

$0.040/lb $0.045/lb $0.040/lb $0.070/lb $0.080/lb

BULK SOILS BR CODE (Recycling) Tons Standard

< 14 tons $500 minimum 14 - 140 $35.00

141 – 700 $33.00 701 – 1400 $30.00

1401 – 2100 Negotiable > 2100 Negotiable

Clean Fill $3.25/yd3 + tax Excess Debris Surcharge N/A

Hazadous Waste E-Manifest Fee - $40/manifest 10% FSC to all Invoices

Solids Northeast Region Northwest Region Central Region Southwest Region* T&D, Drum, 55-Gal, Non-Hazardous, IDW $200.00 $695.00 $200.00 $250.00 T&D, Drum, 55-Gal, Hazardous, IDW T&D, Drum, 55-Gal, PFAS, IDW case by case; call for quote $1,100.00 $1,200.00 Liquids (<3% solids) Northeast Region Northwest Region Central Region Southwest Region* T&D, Drum, 55-Gal, Non-Hazardous, IDW $200.00 $200.00 $200.00 $250.00 T&D, Drum, 55-Gal, Hazardous, IDW T&D, Drum, 55-Gal, PFAS, IDW case by case; call for quote $1,200.00 $1,100.00 $1,200.00

Additional Fees <30 Miles 30-50 Miles >50 Miles Transportation (from portal to p/u site) 0 $50 $100

Policies

Jacksonville, FL Larry Hall 4850 Collins Ave, Jacksonville, FL 32244 904-379-3465 Tampa, FL Mike Bevacqua 4390 28th St N, St. Petersburg, FL 33714 727-610-2080 Winter Haven, FL Ben Skidmore 548 E Bridgers Ave, Auburndale, FL 33823 863-213-3996 Panama City, FL Jesse Hixson 1810 Industrial Dr, Panama City, FL 32405 850-571-3124

FDEP PRP / Drycleaner T&D Rates 2024 case by case; call for quote case by case; call for quote

LOCATIONS

Typically waste profiles < 1 year can be utilized. However, this is NOT always the case. Hull's will notify ATC in the event a newer profile is needed.