CN-370000-HW683-DC003C.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

About this file

This Task Assignment (TA Number DC003C) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for operations and maintenance (O&M) services of a soil vapor extraction (SVE) system located at Super Drycleaner in Greenacres, Palm Beach County, Florida (FDEP Facility ID ERIC_5142). The contract is executed under the master contract number HW683 and is effective through November 30, 2023. The Department Project Manager is Brittany Plyler, and the Contractor's Project Manager is Andrew Gavin.

The Task Assignment authorizes Geosyntec to conduct six months of O&M activities (February 2023 through July 2023) of the SVE system in accordance with the contractor's scope of work, cost estimate, and schedule dated January 11, 2023. The contract is structured on a fixed unit rate basis with cost reimbursement components. The total TA value is $27,652.20, comprised of fixed unit rate services of $25,552.20 and cost reimbursement for utilities of $2,100.00. The scope includes four subtasks: Subtask 1 for project management ($1,891.55); Subtask 2 for Year 3 Quarter 2 O&M and Semi-annual reporting ($13,818.45) due June 2, 2023; Subtask 3 for Year 3 Quarter 3 O&M ($11,613.75) due September 1, 2023; and Subtask 4 for utility costs ($2,220.00) due October 31, 2023. The contract includes monthly O&M site visits, vacuum and pressure readings, groundwater level measurements, timer installation ($535.00), air and groundwater sampling, semi-annual reporting, and estimated monthly electrical utility costs of $350 plus telemetry services of $1,310.75 annually. The effort encompasses 133 total labor hours across multiple personnel categories with overhead and completion fees applied.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC003C Completion November 30, 2023

This Task Assignment authorizes Geosyntec to conduct 6-months of operation and maintenance (O&M) of the soil vapor extraction (SVE) system in accordance with the Geosyntec scope of work, cost estimate, and schedule dated January 11, 2023. There is $2,100 in cost reimbursement (utilities).

Brittany Plyler 850-245-8851 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Andrew Gavin

ERIC_5142

5702 Lake Worth Road #6, Greenacres, Palm Beach County, FL 33463

Super Drycleaner

✔ $ 25,552.20 ✔ $ 2,100.00

$ 27,652.20

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2023.01.25 11:35:50 -05'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.25 10:49:31 -05'00'

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Year 3 Quarter 2: February 2023 to April 2023 O&M summary emails and Semi-annual O&M report 06/02/2023

Subtask 1 & 3: Year 3 Quarter 3: May 2023 to July 2023 O&M summary emails; Project Management 09/01/2023

Subtask 4: Paid Utility Invoices 10/31/2023

Subtask 2: Submittal and FDEP approval of the Semi- Annual O&M Report $ 13,818.45

Subtask 1 & 3: Submittal and FDEP approval of the site-specific O&M log & O&M summary emails; Project Management $ 11,613.75

Subtask 4: Submittal of paid utility invoices - utilities cost reimbursement not to exceed $2,100; Utilities Handling fee $120 $ 2,220.00

$ 27,652.20

HW683

DC003C

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Super Drycleaner Greenacres, Palm Beach County, FL 33463

ERIC_5142

From: Brittany Plyler, Project Manager Date: January 19, 2023 Subject: Negotiation Summary

HW683_DC003C

This Task Assignment authorizes Geosyntec to conduct of operations and maintenance (O&M) of the soil vapor extraction (SVE) system at Super Drycleaner located in Greenacres, Florida in accordance with the Geosyntec scope of work, cost estimate, and schedule received on January 11, 2023.

Geosyntec confirmed on January 11, 2023, that subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.

Geosyntec personnel will conduct 6 monthly O&M visits to the Site beginning in February 2023.

Geosyntec will record vacuum readings at the three VEWs, VMP001, VMP005, VMP006, VMP007, and MW006. Geosyntec will also collect groundwater level measurements from monitoring wells MW001 through MW007.

Subtask 2: February 2023 to April 2023: O&M and Reporting. Three months of O&M with monthly email summaries about influent air sampling and the Semi-annual Report. Installation of the timer switch will be conducted under this subtask.

Subtask 3: May 2023 to July 2023: O&M with monthly email about bump test related air sampling, and influent air sampling.

Subtask 4: Six months of O&M utility costs (February 2023- July 2023)

On January 14, 2023, the FDEP Project Manager confirmed site access.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $27,652.20 with 133 labor hours.

Printed on recycled paper.

FDEP COST ESTI MATEContractor: Geosyntec Consultants (HW550)

Date: 1/11/2023

Task #: HW683-DC003C SubTask 1 Project Management SubTask 6

Site: Super Drycleaner SubTask 2 Year 3 Quarter 2: February 2023 - April 2023 O&M and ReportingSubTask 7

Activity/Phase: O&M - Year 3 Q2 and Year 3 Q3 SubTask 3 Year 3 Quarter 3: May 2023 - July 2023 O&M and Reporting SubTask 8

Project Manager: Andrew Galvin SubTask 4 Utilities : February 2023 - July 2023 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$38.46 Project Manager A. Galvin 16 16.4 $76.92 Principal T. Kafka 6 3 3 0 0 0 0 0 0 0 $56.30 Senior Professional A. Smith 12 7 5 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 3 3 0 0 0 0 0 0 0 0 $38.46 Professional A. Galvin 38 30 8 0 0 0 0 0 0 0 $36.54 Senior Staff Professional T. Hood 56 32 24 0 0 0 0 0 0 0 $33.65 Administrative Assistant S. Darling 2 2 0 0 0 0 0 0 0 0

Total Hours 133 16 77 40 0 0 0 0 0 0 0

Direct Labor $5,481.17 $630.58 $3,153.69 $1,696.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $9,465.98 $1,089.01 $5,446.42 $2,930.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $14,947.15 $1,719.59 $8,600.11 $4,627.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $840.00 $480.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTI MATEContractor: Geosyntec Consultants (HW550)

Date: 1/11/2023

Task #: HW683-DC003C SubTask 1 Project Management SubTask 6

Site: Super Drycleaner SubTask 2 Year 3 Quarter 2: February 2023 - April 2023 O&M and ReportingSubTask 7

Activity/Phase: O&M - Year 3 Q2 and Year 3 Q3 SubTask 3 Year 3 Quarter 3: May 2023 - July 2023 O&M and Reporting SubTask 8

Project Manager: Andrew Galvin SubTask 4 Utilities : February 2023 - July 2023 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $840.00 $480.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRM Annual Telemetry $1,310.75 $1,310.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Timer Install $535.00 $535.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $2,100.00 $0.00 $0.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,945.75 $1,845.75 $0.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $304.58 $184.58 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,250.33 $2,030.33 $0.00 $2,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,000.00 $200.00 $1,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $900.00 $150.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,900.00 $350.00 $2,550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $280.00 $160.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,940.00 $1,338.00 $1,602.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,220.00 $1,498.00 $1,722.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $26,157.48 $1,719.59 $12,958.44 $9,259.45 $2,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,494.72 $171.96 $860.01 $462.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $27,652.20 $1,891.55 $13,818.45 $9,722.20 $2,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 subtasks (list) cost (by subtasks) Invoice 1 2 $13,818.45 invoice 2 1,3 $11,613.75 Invoice 3 4 $2,220.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Super Drycleaner SUBTASK: Year 3 Quarter 2: February 2023 - April 2023 O&M and Reporting

DATE: 1/11/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 3

Senior Professional A. Smith 7

Project Professional M. Hensley 3

Professional A. Galvin 30

Senior Staff Professional T. Hood 32

Administrative Assistant S. Darling 2

TOTAL LABOR 77

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck timer install + 3 O&M visits $120.00 Day 4 $480.00 Van $120.00 Day 0 $0.00

Subtotal $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Telemetry Product Recovery Management (PRM) Annual Fee 1,310.75$ 1 $1,310.75

Subtotal $1,310.75

Timer Installation Product Recovery Management (PRM) 535.00$ 1 $535.00

0 $0.00 Subtotal $535.00

TOTAL SUB $1,845.75

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 - Vapor VOCs Influent - April 2023 $200.00 1 0 $200.00

Subtotal $200.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping summa can Large Cooler (25 to 50 lbs) $150.00 1 $150.00

Subtotal $150.00

TOTAL LAB $350.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 each 0 $0.00 Subtotal $0.00

Expendables 3 days O&M, 1 day for timer installation $40.00 Day 4 $160.00

Subtotal $160.00 Other

O&M supplies $75.00 Day 3 $225.00 O&M Kit $360.00 Day 3 $1,080.00 Air Sampling Canister (Summa) $33.00 Day 1 $33.00

Subtotal $1,338.00

TOTAL EQUIPMENT $1,498.00

report formatting, PDF assembly and compilation

Quarterly O&M data and optimization evaluation (3 hrs), Groundwater data evaluation (2 hrs); Semi-annual report data evaluation and interpretation (2 hrs); Authored Report (3 hrs)

Generate groundwater elevation contour map and genrate ROI figure (3 hrs)

Monthly data evaluation and summary email (2 hrs/event - 6 hrs); update GW and air result tables (2 hrs); draft groundwater contour and spider plot figures (2 hrs), Semi-annual SVE O&M Report (20 hrs)

3 O&M visits (8 hrs each- 1 hr rd trip mobe, 1 hr prep, 6 hrs onsite O&M = total 24 hrs); Timer installation event: (8 hrs - 1 hr rd trip mobe, 1 hr prep, 6 hrs onsite)

FINAL --7/24/96

SUBTASK: Year 3 Quarter 3: May 2023 - July 2023 O&M and Reporting

DATE: 1/11/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 3

Senior Professional A. Smith 5

Professional

A. Galvin 8

Senior Staff Professional T. Hood 24

TOTAL LABOR 40

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck 3 days O&M $120.00 Day 3 $360.00 Van $120.00 Day 0 $0.00

Subtotal $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 - Vapor VOCs Bump test and July 2023 Influent $200.00 9 0 $1,800.00

Subtotal $1,800.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping summa cans Large Cooler (25 to 50 lbs) $150.00 5 $750.00 IDW samples Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $750.00

TOTAL LAB $2,550.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 each 0 $0.00 Subtotal $0.00

Expendables 3 days O&M $40.00 Day 3 $120.00

Subtotal $120.00 Other

O&M supplies $75.00 Day 3 $225.00 O&M Kit $360.00 Day 3 $1,080.00 Air Sampling Canister (Summa) $33.00 Day 9 $297.00

Subtotal $1,602.00

TOTAL EQUIPMENT $1,722.00

Quarterly O&M data and optimization evaluation (3 hrs), Quarterly data interpretation (3 hrs), Bump test evaluation (2 hrs)

Monthly data evaluation and summary email (2 hrs/event - 6 hrs); update air result tables (2 hrs);

3 O&M visits (8 hrs each- 1 hr rd trip mobe, 1 hr prep, 6 hrs onsite O&M = total 24 hrs)

SUBTASK: Utilities : February 2023 - July 2023

DATE: 1/11/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Utilities FPL estimate (usage) electrical 6 months $350.00 6 $2,100.00 Processing Fee (electric) 6 months x $20/month $20.00 6 $120.00

Subtotal $2,220.00

TOTAL SUB $2,220.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

12801 Tampa Oaks Blvd., Suite 151 Tampa, Florida 33637

PH 813.558.0990

FAX 813.558.9726

www.geosyntec.com

FR3170C/Super DC SOW Year 3 OM_DC003C

11 January 2023

Ms. Brittany Plyler Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: 6 Months O&M/Year 3 - Soil Vapor Extraction System Super Drycleaner 5702 Lake Worth Road #6 Greenacres, Palm Beach County, Florida 33463 FDEP Facility ID NO. ERIC_5142 FDEP Task Assignment No. DC003C (pending)

Dear Brittany:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this Statement of Work (SOW) and Level of Effort (LOE) for six months (February 2023 through July 2023) of operations and maintenance (O&M) of the soil vapor extraction (SVE) system at Super Drycleaner (Site) (Facility ID- ERIC 5142) located in Greenacres, Florida. The SVE system startup occurred 26 through 28 October 2020. Bump tests were performed in November 2021, May 2022, and November 2022 to evaluate the rebound of volatile organic halocarbons (VOHs) in the SVE influent and the individual VEWs.

The results of the 2021 and 2022 bump tests indicate residual vadose zone mass is present in the vicinity of VEW-3. The SOW includes installation of a timer to cycle the SVE system on/off daily as an optimization step to liberate residual VOHs from the vadose zone. Geosyntec and the FDEP confirmed on 30 June 2022, that an Access Agreement with the current real property owner of the Super Drycleaner (ERIC_5142) Site has been executed.

This LOE is subdivided into subtasks for quarter 2 of Year 3 and quarter 3 of Year 3 since quarter 1 of Year 3 was performed under DC003B. The major scope elements are outlined below as they will pertain to multiple subtasks in some cases. Each subtask will be outlined separately thereafter.

Super Drycleaner – 6 Months O&M Year 3 O&M LOE

SCOPE OF WORK ELEMENTS

Monthly SVE System O&M Tasks

Geosyntec personnel will conduct 6 monthly O&M visits to the Site beginning in February 2023.

During each O&M visit, Geosyntec personnel will perform the following tasks:

• record vacuum, pressure, and temperature readings at the SVE blower;

• record air flow rates at the blower and three vapor extraction wells (VEWs);

• record vacuum readings at the three VEWs, VMP001, VMP005, VMP006, VMP007, and

MW006;

• drain fluids accumulated in the moisture separator and disposing of fluids in a 55-gallon drum as investigation derived waste (IDW) and collecting a VOC sample for waste characterization;

• collect groundwater level measurements from monitoring wells MW001 through

MW007;

• perform required air sampling;

• perform required groundwater sampling;

• inspect and clean the equipment compound; and

• perform periodic equipment maintenance activities recommended by equipment manufacturers.

The results of the monthly system O&M activities will be documented in a site-specific O&M log, which will be submitted to the FDEP with the monthly O&M summary emails.

Timer Installation and Bump Test

Gesoyntec requested a quote from the SVE System manufacturer (Product Recovery Management, Inc. [PRM]) to install a timer to the SVE system which allows for daily on-off cycling of the system. Geosyntec recommends PRM install the timer due to their familiarity with the system programming. Based on the provided estimate, the cost to install the timer is $535 (Attachment A).

After 3 months of daily cycling (e.g May or June 2023), a bump test will be conducted to evaluate the rebound of VOHs in the SVE influent and the individual VEWs. This bump test will be performed similarly to the previous bump tests and will consist of collecting air samples from VEW-1 through VEW-3 and the influent prior to shutting down the system. After a shutdown period of approximately 30 days, air samples will be collected from VEW-1 through VEW-3 and the influent upon system startup. Air samples will be collected with summa canisters and analyzed at a fixed-base laboratory for VOHs by EPA Method TO-15. The results of the bump test will be provided in the monthly summary emails.

IDW Generation and Management

Investigative Derived Waste (IDW) is not anticipated to be generated during Year 3 Quarter 2 O&M activities or Year 3 Quarter 3 O&M activities, therefore costs for IDW are not included in this LOE. If IDW is generated, Geosyntec will submit a work change directive (WCD).

Air sampling

An influent air sample will be collected during Year 3 Quarter 2 (April 2023) and during Year 3 Quarter 3 (July 2023). Air samples will be collected with summa canisters and analyzed at a fixed-base laboratory for VOHs by EPA Method TO-15.

Reporting

A Semi-annual O&M Report (following Month 30 [April 2022]) and monthly email summaries will be prepared to document the results of O&M activities. The O&M report will include, at a minimum, the following:

• summary of the timer switch installation and programming

• results of laboratory analyses of air samples (tabular and graphical form);

• O&M activities performed during the reporting period;

• the calculated mass of PCE (and daughter products, if detected) removed by the SVE system during the reporting period, and cumulative total removed since startup;

• the SVE system hours of operation during the reporting period;

• information regarding the depth to groundwater;

• information regarding any repairs and/or modifications made to the SVE system;

• vacuum ROI data (tabular and illustrative form); and

• recommendations and conclusions pertaining to the continued operation and/or optimization of the SVE system.

Utilities

Monthly electrical utility bills have been estimated at $350 based on the previous year’s average monthly invoices from Florida Power & Light. Telemetry is currently provided by PRM and is available through 31 December 2022. An invoice from PRM for annual telemetry services from 1 January 2023 to 31 December 2023 was received. The cost of telemetry is $109.23 per month with taxes for a total of $1,310.75 (Attachment A). The utilities also include a $20 monthly processing fee for electrical service and a one-time monthly processing fee for annual telemetry.

LOE SUBTASKS

Subtask 1 – Project Management

Subtask 2 –Year 3 Quarter 2: February 2023 (Month 28) to April 2023 (Month 30) O&M and Reporting

Three months of O&M with monthly email summaries to FDEP, influent air sampling in Month 30, and Semi-annual Report. Installation of the timer switch will be conducted under this subtask.

Subtask 3 – Year 3 Quarter 3: May 2023 (Month 31) to July 2023 (Month 33) O&M

Three months of O&M with monthly email summaries to FDEP, bump test related air sampling, and influent air sampling in Month 33.

Subtask 4 – Utilities: February 2023 (Month 28) to July 2023 (Month 33)

Six months of O&M utility costs.

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due

Date Invoice Amount

2 Year 3 Quarter 2: February 2023 to April 2023 O&M summary emails and Semi-annual O&M report 6/2/2023 $13,818.45

1&3 Year 3 Quarter 3: May 2023 to July 2023 O&M summary emails 9/1/2023 $11,613.75

4 Utilities 10/27/2023 $2,220.00 Total $27,652.20

As always, we appreciate the opportunity to continue working on this project for the FDEP. Please contact me at 561.922.1033 if you have any questions.

Sincerely, Geosyntec Consultants

Andrew Galvin, P.E. Todd Kafka, P.G.

Engineer Senior Principal Geologist

Copies:

Attachments:

Cost estimate Form Attachment A – Timer Installation and Telemetry Costs

Product Recovery Management, Inc.

200 20th Street

Butner, NC, 27509, United States

Product Recovery Management, Inc. | 200 20th Street, Butner, NC 27509 | (919) 957-8890

Quote 9800 Due Date: 12 / 21 / 2022

Sales Rep: Luke Kemp luke.kemp@prmfiltration.com | (919) 957-8890

Sold To Site ID

Andrew Galvin GeoSyntec Consultants - Jacksonville, FL 900 Broken Sound Parkway NW, Suite 200 Boca Rotan, FL 33487

Original PRM WO-6193 Remote Support

$35.00

Ln # Qty Description Unit Price Subtotal

4 PRM Programming Support PRM to add a user programmable time for the SVE. The user will be able to input the start and stop time, or start and duration depending on preference. PRM will remotely upload the new program to the system and provide phone support with the client to review how to enter timer information.

Notes:

1. Quote assumes PRM will be able to log in remotely to upload the program. If this is not feasible and requires a site visit, PRM will provide an updated quote for the onsite visit.

$125.00 $500.00

Optional Items

Subtotal $500.00

Tax

Total $535.00

Notes

*Sales and Use Taxes on the quote are for reference. Actual State and County Sales taxes will be invoiced at the time of billing at the most current rates

*All shipping charges that are quoted are estimated prices. At time of invoicing, PRM will make any adjustments to the final billing.

*If quoted, travel time and site time is estimated unless quoted as daily fixed rates. If additional labor is required to complete the work, PRM will adjust in the final billing.

Payment Terms and Conditions

Net 30 Days

Authorized & Accepted By (Signature) By signing, you agree to the below Standard Terms and Conditions

Authorized & Accepted By (Signature) By signing, you agree to the below Standard Terms and Conditions

Date Date PO # / Project ReferencePO # / Project Reference

----Standard Terms and Conditions----

Product Recovery Management, Inc. is herein referenced as PRM. The client reviewing, accepting or approving this and/or other document(s) is referred to as Client or by name in this document. The signer is duly authorized and approved to execute such documents and it is understood that the signer's signature accepts and creates a contract between the

Client and PRM where Terms and conditions stipulated in this document or any other relevant PRM generated project documents applies and takes precedence over any previously executed contract documents including but not limited to service or vendor. This document is the Standard Terms and Conditions that applies to Sales and/or Service provided by

PRM.

Payment Terms Client agrees to pay all invoices in a timely manner. Standard Terms and Conditions on an Open Credit account are Net 30 Calendar days unless otherwise agreed in writing and agreed to by PRM. Overdue invoices are subject to a late fee of 18% per year or 1.5% per month and service charges are subject to be invoiced monthly.

Client agrees to pay for all service charges for late payments. Should PRM be required to bring legal action to collect any sums due under this agreement, the prevailing party shall be entitled to recover its reasonable attorney fees. Client understands and agrees that not paying invoices in a timely manner may cause irrefutable damage to PRM. In the event that the client cannot make a payment on time for certain reasons, client is required to contact PRM and give notice to reasons why the payment cannot be made on time and Client must establish to PRM a plan to pay off the overdue invoices.

Client Responsibilities and Understandings PRM is in the business of manufacturing and providing materials with focus in the environmental remediation, landfill and process markets. Client understands that PRM accepts Client as the authority and experts of their projects. Responsibility of use of products supplied are the clients responsibility and in no way is PRM responsible for their specific uses. Client understands that misuse or incorrect applications can lead to property or equipment damage or health of personnel onsite as well as potential for death. PRM in no way accepts liability for damages that arise.

Types of Equipment Sold and/or Manufactured by PRM PRM manufactures a wide variety of equipment but most items are specific to the completed systems that PRM manufactures. Since PRMs equipment is for Environmental Protection, many systems are manufactured with special considerations such as metallurgy and chemistry requirements. By accepting this proposal and placing an order relative to one of the clients projects in regards to this equipment, the Client accepts that they understand all of the potential engineering aspects of the equipment including operations and maintenance of such equipment including but not limited to conditions that could be destructive to the equipment and/or it’s performance. The client accepts that performance is based on equipment that meets performance requirements when supplied and that performance may degrade if the condition of the equipment is not kept in optimal operational conditions.

• Commodity items - PRM branded and non-branded commodity items that are Industry standard items utilized for a variety of means. Many of the items sold by PRM can be used for many various market sectors and is not limited to the Environmental markets. These items are used at the client's discretion and should be installed in accordance to good installation practices. PRM is not liable for installations and the safety of those installations.

• Environmental Remediation Products - PRM manufactures and sells/leases equipment for the remediation Industry. Client is responsible for implementation and operations of the equipment unless specifically offered otherwise. Client is responsible for the ultimate design of provided systems. PRM is not responsible for performance degradation or damage due to any unknown background constituents in a process stream that may affect equipment. A few examples: (1) a Catalytic

Oxidizer may incur catalyst damage for non identified chemical compounds or for concentrations that were not identified properly. Any damages due to these conditions is the Client's responsibility. (2) An air stripping system that is designed for certain volatile chemicals but once operational is found to have surfactants in the stream of any level, altering the performance of the air stripper. (3) Oil Water Separators where surfactants or other chemicals are found to make a standard separator inefficient are not the responsibility of PRM. These issues are the responsibility of the Client. In many cases, site equipment may need to be modified or augmented with additional equipment to meet the site requirements.

Returns PRM accepts returns for items that are deemed defective and/or authorized by PRM. Returns for certain items are not allowed if they are customized for the client.

Authorized non-defective returns are subject to a 20% restocking fee and must be in the original packaging and packaged as like new. PRM can not take returns for equipment that has been used in any process where water, air or vapors may have been processed. Client is responsible for return shipping of authorized returns. It is the client’s responsibility to receive prior approval for returns in advance of shipping items back to PRM. Returns must be properly identified with a return authorization number and contact. Returns lost in transit are the responsibility of the Client. All products or equipment shipped back to PRM are required to be fully decontaminated and cleaned prior to shipment back to PRM. Any equipment not properly decontaminated is subject to reasonable cleaning and decontamination fees assessed by PRM. If any contaminated equipment is returned to PRM that results in site contamination, or a requirement to remediate at PRM’s property, client is responsible for those costs incurred to do so and is subject to the liability of potential contamination including, but not limited to, property damage and value

Dispute Resolution In the event that legal action is required by PRM to seek payment for non-payment, Client agrees that jurisdiction and venue will be proper in State Court of

North Carolina, Durham County. In the event legal action is taken against Client to collect on a debt or dispute, Client agrees that a Judgment against Client is binding and that that the Client agrees to pay all such fees assessed by Mediation, Arbitration, a Judge or a Jury verdict. Client agrees that the prevailing party in such action will also be entitled to its reasonable attorney fees.

PRM Subsidiary Names- PRM uses Product Recovery Management, Inc. as our formal Corporate name. PRM owns Trade Names that are used for specific industries or market sectors. This is notice that if you are seeing the identification of these Trade names, that you are in fact working directly with Product Recovery Management, Inc. These names include: PrmFiltration.com, pd-blowers.com and PRM.

Sales and Use Taxes- PRM is registered in NC, FL, PA, NH, NY, VA, WA, WV and WY. PRM collects and pays Sales & Use taxes in these regions unless exempted in writing for the project. For States where PRM is not registered, PRM does not collect Sales and Use Taxes unless specifically required and accepted in writing. For those regions, the client is responsible for paying in any required Sales and Use taxes for their project.

PRODUCT RECOVERY MGMT., INC.

200 20th STREET

BUTNER, NC 27509-2443 INVOICE NUMBER: 113240

INVOICE DATE: 10/27/22

DUE DATE: 12/31/22

919-957-8890 CUSTOMER NO: GEOSYF

919-957-7230 FAX SALESMAN: THEO

TERMS: DUE BY END OF YEAR

P.O. NUMBER: TELEMETRY 2023 JOB: 006193 WS: 031 (1-1)

Adrian Smith/Kevin Warren GEOSYNTEC CONSULTANTS Palm Beach, FL stripp@geosyntec.com

9000 BROKEN SOUND PKWY,STE.200

BOCA RATON, FL 33487

2023 ANNUAL TELEMETRY RENEWAL

RETURNS: No returns will be accepted without prior authorization.

Returns are subject to a 25% restocking fee which will be advised when RI # is issued.

SERVICE WILL BE VALID FROM 1/1/2023-12/31/2023 12.00 102.083 1,225.00

& WILL AUTOMATICALLY RENEW THE FOLLOWING YEAR

UNLESS CANCELLED IN WRITING TO PRM.

Subtotal: 1,225.00 (02051-PALM BEACH COUNTY, FL) Tax: 85.75

Invoice Total: 1,310.75

Service charge of 1.5% per month will be charged on all overdue invoices. If legal action is required to collect debts, client agrees to pay PRODUCT RECOVERY MGMT., INC. reasonable attorney fees. This agreement shall be governed by and construed in accordance with the laws of the State of North Carolina and venue shall be proper and personal jurisdiction had in Granville County, NC. Materials are warranteed by the manufacturer. This warranty does not cover labor charges. Warranty on workmenship is one year from date of installation.