This is a Task Assignment (TA) document under Contract Number HW683 issued by the State of Florida Department of Environmental Protection (FDEP). The agreement is between FDEP and contractor Geosyntec Consultants to conduct well abandonment activities at Liftmasters, Inc., located at 12875 58th Street North, Clearwater, Pinellas County, Florida (Site ID ERIC_15273). The work is funded through federal money from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Allison Hankins, and the Contractor's Project Manager is David Latham, P.G.
The scope of work is divided into three subtasks: Subtask 1 involves project management at a cost of $332.84; Subtask 2 addresses abandonment of four monitoring wells (2 inches in diameter, approximately 12 to 13 feet deep) at a cost of $3,745.59, to be performed by subcontractor Preferred Drilling Solutions, Inc., the low bidder at $1,700.00; and Subtask 3 covers preparation of a Well Abandonment Letter Report at a cost of $947.21. The total Task Assignment value is $5,025.64 on a fixed unit rate basis. The primary deliverable is the Well Abandonment Letter Report/Project Management, due May 31, 2023, upon completion of field activities and FDEP approval. Payment is contingent upon submittal and approval of the completed report and associated documentation, including photographs and field notes.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
BIL02A Completion September 28, 2023
Geosyntec Consultants will conduct well abandonment activities and generate a Well Abandonment Letter Report in accordance with the cost proposal and Level of Effort (LOE) submitted March 22, 2023.
Allison Hankins 850 245 8990 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec Consultants
Geosyntec Consultants
David Latham, P.G. 904 450 4253
ERIC_15273
12875 58th Street North, Clearwater
Liftmasters, Inc.
✔ $ 5,025.64
$ 5,025.64
Scope of Work
Joseph Applegate Digitally signed by Joseph Applegate Date: 2023.03.22 14:30:39 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.03.22 14:02:59 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Well Abandonment Letter Report/Project Management 05/31/2023
Upon completion of well abandonment activities and submittal and DEP approval of Well Abandonment Letter Report/Project Management (Subtasks 1, 2, & 3) $ 5,025.64
$ 5,025.64
HW683
BIL02A
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Geosyntec Consultants, HW683 Contract File
FROM: Allison Hankins, Contract Manager
DATE: March 22, 2023
SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL02A
Liftmasters – Site ID # ERIC_15273 Well Abandonment Activities and Report
This Task Assignment (TA) is for conducting a Well Abandonment, including site Field Work and the generation of a report, at Liftmasters, Inc. located at 12875 58th Street North, Clearwater, Pinellas County. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe. The agreed upon cost of this subtask is $332.84.
Subtask 2: Abandonment of Monitoring Wells This subtask will include the abandonment of four monitoring wells in accordance with the completion of the Limited Site Assessment performed in late 2021 and early 2022. The four shallow monitoring wells will be abandoned in accordance with local, FDEP, and South Florida Water Management District regulations. The agreed upon cost of this subtask is $3,745.59.
Subtask 3: Preparing a Well Abandonment Report This subtask includes labor hours associated with the preparation of a Well Abandonment Report. The deliverable will document field activities associated with the abandonment of four wells including figures, photographs of the wells before and after abandonment, and field documentation. The deliverable of this subtask will include the Well Abandonment Report. The agreed upon cost of this subtask is $947.21.
Summary The Department’s BIL Contract Manager and Geosyntec Consultants Contract Manager have both agreed to the scope of work and associated costs. The final costs associated with this TA is $5,025.64. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Geosyntec Consultants on March 22, 2023, http://www.floridadep.gov/
Negotiation Summary – Task Assignment BIL02A Liftmasters, Inc. – Site ID # ERIC_15273 March 22, 2023 www.FloridaDEP.gov and the TA Form for BIL02A prepared by the Department. The final deliverable for this TA must be received by the Department no later than May 31, 2023.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 3/22/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Liftmasters Inc SubTask 2 Abandonment of Monitoring Wells SubTask 7
Activity/Phase: Site Rehabilitation Completion SubTask 3 Well Abandonment Letter Report SubTask 8
Project Manager: David Latham-Geosyntec SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
Geosyntec Consultants $55.29 Project Manager Latham 2 2.0 $84.13 Principal Applegate 1 1 0 0 0 0 0 0 0 0 $55.29 Senior Professional Latham 4 2 2 0 0 0 0 0 0 0
$0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Project Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Project Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Project Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Professional 0 0 0 0 0 0 0 0 0 0
$42.31 Professional Cannon 8 8 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Staff Professional 0 0 0 0 0 0 0 0 0 0
$28.37 Staff Professional 0 0 0 0 0 0 0 0 0 0 $30.29 Staff Professional Mohr 5 0 5 0 0 0 0 0 0 0
$0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Professional 0 0 0 0 0 0 0 0 0 0 $0.00 Clerical 0 0 0 0 0 0 0 0 0 0 $0.00 Admin Asst 0 0 0 0 0 0 0 0 0 0
$29.35 Admin Asst Hampton 1 1 0 0 0 0 0 0 0 0 $48.56 SR Drafter/SR CADD Hensley 1 0 1 0 0 0 0 0 0 0
$0.00 Drafter/CADD 0 0 0 0 0 0 0 0 0 0 $0.00 Designer 0 0 0 0 0 0 0 0 0 0 $0.00 Site Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Field Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Engineering Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Engineering Technician 0 0 0 0 0 0 0 0 0 0
Total Hours 22 2 12 8 0 0 0 0 0 0 0
Direct Labor $982.27 $109.14 $562.54 $310.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $1,696.38 $188.48 $971.51 $536.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,678.65 $297.62 $1,534.05 $846.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $49.12 $5.46 $28.13 $15.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling Preferred Drilling (well abandonment) $1,700.00 $1,700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities Survey $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,700.00 $1,700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $170.00 $170.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,870.00 $1,870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Copy of Liftmasters Abandonment LOE-22 March 2023_rev1 Page 1 3/22/2023
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 3/22/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Liftmasters Inc SubTask 2 Abandonment of Monitoring Wells SubTask 7
Activity/Phase: Site Rehabilitation Completion SubTask 3 Well Abandonment Letter Report SubTask 8
Project Manager: David Latham-Geosyntec SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,757.77 $303.08 $3,592.18 $862.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $267.87 $29.76 $153.41 $84.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,025.64 $332.84 $3,745.59 $947.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Page 2 3/22/2023
LEVEL OF EFFORT/EXPENSE WORKSHEET (Haz. Waste Dept.)
SITE : Liftmasters Inc SUBTASK: 2 Abandonment of Monitoring Wells
DATE: 3/20/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (Applegate) 1
Senior Professional (Latham) 2
Project Professional
Staff Professional (Cannon) 8
Sr. Staff Professional
Staff Professional (McGill)
Sr. Drafter (Hensley)
Admin Asst (Hampton) 1
TOTAL LABOR 12
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Car $80.00 days $0.00 Truck $120.00 days 1 $120.00 Van $120.00 days $0.00 subtotal $120.00 Mileage Costs 0.585 mile 0 $0.00 subtotal $0.00 Air Fare $1.00 Round Trip 0 $0.00 subtotal $0.00 Per diem ($35/110)
$35.00 days 0 $0.00 $0.00 days 0 $0.00 subtotal $0.00
TOTAL TRAVEL $120.00
SUBCONTRACTOR (EQUIPMENT PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00 None $0.00 Lump sum 0 $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling-Preferred Drilling Well Abandonment
$1,700.00 Lump Sum 1 $1,700.00 $0.00 Lump Sum 0 $0.00 subtotal $1,700.00 Drilling (Non-Conventional)
$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00 Mobile Laboratory
$0.00 Lump Sum 0 $0.00 subtotal $0.00
Surveying $0.00 Lump Sum 0 $0.00 subtotal $0.00
IDW
$0.00 Lump Sum 0 $0.00 $0.00 Lump Sum 0 $0.00 subtotal $0.00
Utilities
Senior oversight under brownfields site portfolio
Technical oversight of field activities
Mobe/demobe to site; oversight of well abandonment field work, H&S monitoring, field notes
3/22/2023 Page 3 of 5 Subtask 2
SITE : Liftmasters Inc SUBTASK: 2 Abandonment of Monitoring Wells
DATE: 3/20/23
$0.00 Month 0 $0.00 $0.00 Month 0 $0.00 subtotal $0.00
Other None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 None $0.00 Month 0 $0.00 subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $1,700.00
LABORATORY COSTS
Rate # SAMPLES #QA/QC TOTALS Method - Matrix
EPA 8260 BTEX/MTBE - GW $66.00 0 0 $0.00
TRPH - FL-PRO - GW $84.00 0 0 $0.00
EPA 8270 - GW $100.00 0 0 $0.00
Other $0.00 0 0 $0.00 Other $0.00 0 0 $0.00 subtotal $0.00 Fast Turnaround Charges Percent
0% $0.00 0 $0.00 0% $0.00 0 $0.00 0% $0.00 0 $0.00 subtotal $0.00 Shipping
Large cooler (25 to 50 lbs) $104.00 0 $0.00 Small cooler (0 to 25lbs) $63.00 0 $0.00 subtotal $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Personal Protection Level D PPE $26.50 day 0 $0.00 subtotal $0.00 Drilling Related Monitoring Well Installation Kit $160.00 day 0 $0.00 Soil Assessment Kit $127.00 day 0 $0.00 Soil Sampling Kit (through concrete) $155.00 day 0 $0.00 subtotal $0.00 Analytical Related Groundwater Sampling Kit $208.55 day 0 $0.00 Other $0.00 day 0 $0.00 Other $0.00 day 0 $0.00 subtotal $0.00 IDW Related Drum $58.20 drum 0 $0.00 Soil Drum Disposal (non-haz) $0.00 drum 0 $0.00 GW Drum Disposal (non-haz) - Permafix $115.50 drum 0 $0.00 other $0.00 0 $0.00 subtotal $0.00
Expendables $40.00 day 1 $40.00
EDR Map Package $350.00 per 0 $0.00 subtotal $0.00
TOTAL FIELD EXPENSES $40.00
3/22/2023 Page 4 of 5 Subtask 2
SITE : Geosyntec Consultants SUBTASK: 3 Well Abandonment Letter Report
DATE: 3/20/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal (Applegate) 0
Senior Professional (Latham) 2
Project Professional
Staff Professional
Sr. Staff Professional
Staff Professional (Mohr) 5
Sr. CADD (Hensely) 1
Admin Asst
TOTAL LABOR 8
Senior review of associated report
Figure preparation
Preparation of well abandonment letter report
3/22/2023 Page 5 of 5 Subtask 3
1200 Riverplace Blvd., Suite 710 Jacksonville, Florida 32207
PH 904.858.1818
FAX 904.396.1143
www.geosyntec.com
FE7551/Liftmasters_Well Abandonment_22 March, 2023
22 March 2023
Mr. Billy Hessman Brownfields and CERCLA Administration Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535 Room 310-D Tallahassee, FL 32399-2400
Subject: Level of Effort/Cost Estimate Form Well Abandonment Liftmasters, Inc. Site 12875 58th Street North Clearwater, Pinellas County, Florida
Dear Mr. Hessman:
In response to our recent discussions, Geosyntec Consultants (Geosyntec) has prepared the attached Cost Estimate Form and associated Level of Effort (CEF/LOE) to conduct well abandonment activities. This is a follow-up to the Limited Site Assessment performed in late 2021 and early 2022. This proposed scope of work consists of the following tasks.
Subtask 1 – Project Management
Subtask 2 – Abandonment of Monitoring Wells
Subtask 2 presents the costs associated with the abandonment of the four shallow monitoring wells that were utilized as part of the site assessment. Geosyntec will subcontract the services of a State-licensed well driller to conduct the well abandonment activities. The four shallow monitoring wells (each 2-inches in diameter and approximately 12 to 13-feet deep) will be abandoned in accordance with local, FDEP, and Southwest Florida Water Management District regulations.
Each well will be grouted from the base of the well up to land surface, and the surficial concrete pad and manhole for each will be removed.
Estimates for well abandonment activities are summarized below. Based on these three bids, Geosyntec recommends selecting Preferred Drilling Solutions, Inc. to which was the low bidder to perform the well abandonment activities.
Liftmasters, Inc. – Well Abandonment
Well Abandonment
Preferred Drilling Solutions, Inc $1,700
Ambient Technologies, Inc $1,850
Huss Drilling $3,500
A formal bid request was included as part of the e-mail sent to each drilling firm and has been attached. Accordingly, a copy of each of the three bids has also been included.
Subtask 3 – Prepare Well Abandonment Report A letter report will be prepared that documents the field activities associated with the abandonment of the four monitoring wells. The report will also include the following information:
• a figure showing the location of the four abandoned wells;
• a photolog with photographs of the four monitoring wells showing before and after abandonment along with current site conditions;
• field documentation; and
• documentation provided by the licensed driller to local and to State (FDEP and/or
SWFWMD) agencies as required by the applicable well abandonment permits.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Due
Date Invoice Amount
1,2,3 Well Abandonment Letter Report 31 May 2023 $5,025.64 Total: $5,025.64
As always, we appreciate the opportunity to finalize the Phase II ESA work on this project for FDEP and for Pinellas County.
Liftmasters, Inc. – Well Abandonment
Please contact either of the undersigned, if you have any questions.
Sincerely, David J. Latham, P.G.
Senior Geologist
Joseph Applegate, P.G.
Senior Principal Hydrogeologist
Attachments: Driller Bids Cost Estimate Request
Quantity Unit Rate Quantity Unit Rate Quantity Unit Rate
Daily Rate 0 Days 0 0 Days 0 0 Days 0
Per diem 0 Days 0 0 Days 0 0 Days 0
Mobilization 1 Lump Sum 550 0 Lump Sum 0 0 Lump Sum 0
Well abandonment 50 Per Foot 12 1 Lump Sum 1850 1 Lump Sum 3500
Permits 1 Each 50 0 Each 0 0 Each 0
Material Disposal 0 Each 0 0 Each 0 0 Each 0 Surface Restoration 4 Each 125 0 Each 0 0 Each 0
Note: The selected subcontractor is highlighted in yellow.
$1,700.00 $1,850.00 $3,500.00
Subcontractor Evaluation: Liftmasters Inc Clearwater, FL
Well Abandonments
Preferred Drilling Ambient Technologies Huss Drilling
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 3/10/23 FAC ID#: ERIC_15273
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Heavy Duty Truck / Stake Bed (3/4+ ton)
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $12.00 50 $600.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $125.00 4 $500.00
Mobilization roundtrip $550.00 1 $550.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $50.00 1 $50.00
$0.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $1,700.00
Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Austin Bonacum, Estimator Date: 3/10/23
Days to Complete Scope of Work: 0.5
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Consultant Name: Geosyntec Consultants
Site Name & Location: Liftmasters, Inc.
PROPOSED SCOPE OF WORK:
Abandon (4) 2" MW's, total depth: 50', remove pads and manholes, restore grade
Cut riser that is above ground surface to approximately 6-inches below grade
12875 58th St North, Clearwater, Pinellas County, FL
Geosyntec, Liftmasters, Inc, Clearwater, FL (abandonment)
Contractor: Geosyntec Proposal No.: 22303021 Contact Name: David J. Latham
Contact Phone: 904 450 4253 Date: 3/10/2023 Contact Email: dlatham@geosyntec.com
Site Address: FDEP ID#:
PROPOSED SCOPE OF WORK: Estimator: MR
LS $1,850.00 1 $1,850.00
ft. included each included
Mobilization (one rig) Miles round trip: round trip included
Permits 2 (Drilling and abandonment only; cost according to WMD & Local Municipalities)-MW each included
TOTAL QUOTE PRICE $1,850.00
NOTES: This proposal is only valid for this specific scope of work. Any changes, prices shall be revised. Actual field days, materials and hours will be invoiced
Days to Complete Scope of Work: approx.1 day(s) (depends on access, client sampling time or other restrictions) " Subcontractor Company Name: ATI Companies, LLC Subcontractor Mailing Address: 5709 First Av. S St. Petersburg FL 33711
Signature:___________________________ Reviewer:____________________________ Date: 3/10/2023
NOTE: to schedule work, contact 727-328-0268 Bid Valid for 90 Days
Payment terms: Net 60 days
This proposal acceptance includes ATI's standard Terms and Conditions
Name of Firm:__________________________________________________ Date: ______________
Signature of Representative: _________________________________________
Print name of signing Representative:________________________________
NOTE: This proposal needs to be signed once job is awarded to ATI Companies, LLC
6. A perdiem will automatically be charged when field work is longer than 9hr/day or round trip over 150 miles
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, steam cleaning decon, well development, and grouting.
MISCELLANEOUS
2. Well Permits -Requires 5 days Notice to Water Management District - Actual cost only.
3. Utility Clearance - Requires 72 Hour Notice Prior to Drilling. ATI will complete notification to Sunshine State One Call (Sunshine) prior to initiating drilling. Sunshine will not perform locates on private property (only right of ways and easements). It is the client and/or owners responsibility to provide information from private property. Damage repairs (time and materials) caused to any underground utilities on private property is client responsibility.
ATI will review information provided regarding underground utilities to confirm clearance at boring locations. As another safety precaution, ATI will perform hand clear to approximately 5 feet below ground surface to check for utilities prior to drilling. If the client anticipates the potential for multiple utilities underground but has no information on location, we can provide private utility locating services at an additional cost. Please advise us of your needs prior to date of drilling.
4. Price assumes no rock will be encountered in the depth of penetration. Add $15/foot for rock drilling if required.
5. DPT Daily and Half-Day Rate: Hours over Half-day and Full Day Rate - $175 / hour
MW abandonment- per SOW
12875 58th St N, Clearwater, FL
Client is responsible for any ROW or access permits and MOT for the work to be performed, if needed.
• Well abandonment of four (4) MWs. Wells are 2" up to 13ft. Grout bottom up.
• Remove, resurface and disposal of pad/cover. (grass/concrete)
SAFETY
DRILLING DOUBLE CASED WELL
ABANDONMENT
DRILLING ACTIVITIES
MW abandonment- 1" or 2" grout/plug Pad and cover- Removal and disposal and resurfacing mailto:dlatham@geosyntec.com
| Liftmasters_TA_Draft |
| Negotiation Summary - LiftmastersDRAFTRev1 |
| Copy of Liftmasters Abandonment LOE-22 March 2023_rev1 |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Liftmasters_Well Abandonment_SOW_03_22_23_rev1 |
| Subcontractor Evaluation_Liftmasters March 2023.pdf |
| Compiled MW Abandonment Quotes_Liftmasters-Mar 2023.pdf |
| Drilling |