ATTACHMENT 4 - Schedule of Material Submittal AF Form 66.xls
Air Force Form XLS spreadsheet 60 KB Posted
- Solicitation number
- W50S77-23-R-7002
About this file
This document contains two Schedules of Material Submittals and details for a federal solicitation. The solicitation is for the renovation of a Base Gym, move and renovation of a Mail Room, and addition of gutters to Buildings 1397 and 1256. The work will be completed for the Department of the Army Texas Army National Guard.
The Schedules of Material Submittals provide line item details for required submittals including shop drawings, samples, data, and certifications. For the Base Gym renovation, items include countertops, toiletries, sinks, tile, doors and frames, lighting, flooring, and gutters. The Mail Room renovation items are interior woodwork, doors, access doors, hardware, drywall, flooring, ceiling, paint, and gutters. The solicitation number is W50S77-23-R-7002 and appears to be for a renovation and construction services contract with the Department of the Army Texas Army National Guard.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Gym
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| FWJH212632 | Renovate B1250 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY______ DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | ||||||||||
| 1 | Countertops (incl labs) | X | X | X | X | X | X | ||||
| 2 | Toiletries (commodes, hardware) | X | X | X | |||||||
| 3 | Sinks | X | X | X | X | ||||||
| 4 | Ceramic Tile | X | X | X | X | ||||||
| 5 | Porcelain Tile | X | X | X | X | ||||||
| 6 | Door/Frames | X | X | X | X | ||||||
| 7 | Door Hardware | X | X | X | |||||||
| 8 | LED Light Fixtures | X | X | X | |||||||
| 9 | Bathroom Fixtures | X | X | X | |||||||
| 10 | Rubberized Athletic Flooring | X | X | X | X | ||||||
| 11 | Diamond Plate Baseboard | X | X | X | X | ||||||
| 12 | Gutters | X | X | X | X |
Mail Room
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| FWJH162398 | 1357 - Relocate Mailroom | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY______ DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||
| APPROVAL | REMARKS | ||||||||
| APPROVED | DISAPPROVED | ||||||||
| 1 | 06402 Interior Architectural Woodwork (Countertops) | X | X | X | X | ||||
| 2 | 08211 Flush Wood doors | X | X | X | X | ||||
| 3 | 08305 Access Doors (Dutch Doors) | X | X | X | X | ||||
| 4 | 08710 Door Hardware | X | X | X | X | ||||
| 5 | 09255 Gypsum Board Assemblies | X | X | X | X | ||||
| 6 | 09310B Porcelain Tile | X | X | X | X | ||||
| 7 | 09512-Accoustical Ceiling | X | X | X | X | ||||
| 8 | 09651 Resilient Tile Flooring and Accessories | X | X | X | X | ||||
| 9 | 09680 Carpet | X | X | X | X | ||||
| 10 | 09900 Painting | X | X | X | X | ||||
| 11 | |||||||||
| 12 | |||||||||
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 |
Gutters
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| FWJH212632 | Renovate B1250 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY______ DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | ||||||||||
| 1 | Gutters | X | X | X | X | X | X | ||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 | |||||||||||
| 9 | |||||||||||
| 10 | |||||||||||
| 11 | |||||||||||
| 12 |
File details come from the government source that posted it. Updated .