ATTACHMENT 3 - Statement of Work Building 13971256 Gutter Replacement.pdf

PDF 1 MB Posted

Attached to
Renovation of the Base Gym, Move and Renovation of the Mail Room, and Addition of Gutters to Buildings 1397 and 1256
Solicitation number
W50S77-23-R-7002
Issued by

About this file

This statement of work outlines requirements for replacing gutters on two buildings at Ellington Field Joint Reserve Base in Houston, Texas. The contractor will remove and dispose of existing gutters totaling approximately 1,570 linear feet, fabricate and install new 24-gauge pre-finished metal gutters and downspouts, and re-use existing splash blocks. Submittals are required for product data and color samples. The work must comply with standards including the Whole Building Design Guide, Unified Facilities Criteria, and International Building Code. The contractor must have appropriate licenses and certifications and provide a one-year warranty on all equipment and workmanship.

The related federal contract opportunity is a solicitation from the Department of the Army Texas Army National Guard for projects including renovation of the base gym, relocation and renovation of the mail room, and addition of gutters to the two buildings identified in the statement of work.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEXAS AIR NATIONAL GUARD

147th ATTACK WING Ellington Field JRB

Houston, Texas

STATEMENT OF WORK

FWJH232306

BUILDING 1397 & BUILDING 1256 GUTTER

REPLACEMENT

27 February 2023

Intentionally Left Blank

147th Attack Wing FWJH232306 Ellington Field JRB, Houston, TX Bldg 1397 & Bldg 1256 Gutter Replacement

STATEMENT OF WORK:

A. Furnish all investigations, engineering, design, materials, equipment, and supervision necessary to complete the scope of work as described and specified below to replace Building 1397 gutters and Building 1256 gutters.

PART 1 GENERAL:

1.1. All work performed under this contract must be in accordance with the general conditions and technical specifications provided in Whole Building Design Guide (https://www.wbdg.org/fc/ang and https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications).

1.2. The Contractor shall abide by the General Condition which is a part of this Scope of Work, and the templates can be provided by the Base Civil Engineer.

1.3. DESCRITPION AND REFERENCES TO BE USED BUT NOT LIMITED TO:

A. Ellington Field JRB Division 1 Specifications 6 Dec 22

B. Ellington Base Design Standards

1. The Contractor shall abide by the Technical Specifications which are a part of this Scope of Work and may be obtained from the following websites. See Whole Building Design Guide (https://www.wbdg.org/fc/ang and https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications).

2. The Contractor shall also abide by the Federal Acquisition Regulations (FAR) regarding those with regulatory implications needing reporting requirements.

Applicable FARs include but not limited to:

a. FAR Subchapter D, Part 23 – Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-Free Workplace;

b. Defense Federal Acquisition Regulation Supplement (DFARS) Part 223.

1.4. DESIGN STANDARDS, CODES AND CRITERIA: As required, but not limited to:

A. The design shall comply with the base specific General Design Guidelines and the Architectural Compatibility Guidelines of Ellington Field JRB.

B. Specific codes, standards and criteria referenced throughout this Statement of Work (SOW). Where there is a conflict between the SOW and building codes, the most stringent shall apply. When codes are in conflict, the most stringent shall apply. This list is not intended to be a complete list. All work shall be designed and constructed to meet all state and federal codes, standards, and laws. Reference other sections of this SOW https://www.wbdg.org/fc/ang https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications https://www.wbdg.org/fc/ang https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications and the specifications referenced for use for other standards and references not listed below.

ABA Architectural Barriers Act AFDS Air Force Design Guide, current edition ANSI American National Standards Institute Standards ASCE American Society of Civil Engineers, Minimum Design Loads for Buildings and Other

Structures, Latest edition.

ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers ASTM American Society for Testing and Materials BOCA Building Officials and Code Administrators DCID Director of Central Intelligence Directive 6/9, Physical Security Standards for

Sensitive Compartmented Information Facilities EIA Electronic Industries Association ETL Engineering Technical Letters IBC International Building Code IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society Lighting Handbook IFC International Fire Code IMC International Mechanical Code IPC International Plumbing Code MILHDBK Military Handbooks NEC National Electrical Code, current edition NEMA National Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association Codes and Standards, most current edition OSH Occupational Safety and Health Administration SMACNA Sheet metal & Air Conditioning Contractors National Association TI’s Technical Instructions TM’s Technical manuals UL Underwriter's Laboratories

C. The Contractor shall also follow all current national and state codes, regulations and specifications involving civil, architectural, interior design, structural, mechanical, electrical, and environmental disciplines which are applicable to the engineering design and construction industry, including OSHA Safety and Health Standards.

D. Use of the most current versions of the Air Force Manuals or Instructions (AFMAN or AFI), Unified Facilities Criteria (UFC), National Fire Codes and Life Safety Codes, published by the National Fire Protection Association (NFPA), and International Building Code (IBC). In case of conflict between code requirements, the most stringent criteria shall apply, requests for Information (RFI) should be directed to the COR to ensure proper clarification.

1.5. GENERAL: The purpose of the project is to replace gutters for Building 1397 (approximately 230 LF) and Building 1256 gutters (approximately 1,340 LF). Contractor to verify replacement lengths.

A. Project References

Figure 1 - 1397 Gutter Location Figure 2 - 1256 Gutter Location Figure 3 - Standard Finish Schedule and Colors

1.6. OBJECTIVE: Replace Building 1397 gutters and Building 1256 gutters.

A. Gutters Building 1397 Alert

1. Remove existing gutters and downspouts and dispose of them properly.

(Approximately 230 LF, Contractor to verify)

2. Fabricate and install new gutters and downspouts using 24ga. pre-finished metal.

3. Fabricate and install gutter and downspout straps using 24 ga. pre-finished metal.

4. Seal all gutter joints using a urethane sealant.

5. Re-use the existing splash blocks at downspouts.

B. Gutters Building 1256

1. Remove existing gutters and downspouts and dispose of them properly.

(Approximately 1,340 LF, Contractor to verify)

2. Fabricate and install new gutters and downspouts using 24ga. pre-finished metal.

3. Fabricate and install gutter and downspout straps using 24 ga. pre-finished metal.

4. Seal all gutter joints using a urethane sealant.

5. Re-use the existing splash blocks at downspouts.

Note: Exercise caution when working around the antennas mounted on the CE/EOD side of the building. Ensure all the LMR’s are turned off to avoid RF exposure when working around the antennas. Coordination with CE will be required.

1.7 LICENSING AND CERTIFICATION

A. The contractor shall employ certified personnel and / or sub-contractors with appropriate licenses and will provide their credentials with proposal.

1.8 QUALITY ASSURANCE

A. The facility shall pass and be regulatory compliant with all environmental laws for Federal, State, and Local criteria.

B. See Section 014000 of the General Conditions

1.9 SUBMITTALS:

A. Contractor will submit: Using Attachment 4 - Schedule of Material Submittal AF Form 66

1. Product Data: Provide manufacturer’s data on systems.

a. Gutters

2. Color Submittals: Provide manufacturer color sample for color selection for all painted surfaces.

a. Gutters

B. Provide manufacturer’s data sheets, installation instructions, wiring diagrams and all other publications that are required for a complete and fully functional system.

C. Contractor shall not order or begin any construction until the submittal has been approved by the Contracting Officer

D. See section 013000 Submittal of the General Conditions.

E. In additions to the number of copies under section 013000, provide one electronic copy to the COR of all submittals, operating manuals etc.

1.9 WARRANTY:

A. System including all equipment and devices shall have a minimum of a 1-year full Materials and Labor Warranty.

PART 2 PRODUCTS:

2.1 EQUIPMENT:

A. Any reference to a particular make and model is being used for example only. An equivalent or equal will be accepted for all items under this contract. These shall be approved by the COR during the submittal process.

PART 3 EXECUTION

3.1 INSTALLATION

A. Equipment and materials shall be installed in an approved manner and in accordance with equipment manufacturers’ installation requirements.

3.2 FIELD QUALITY CONTROL

A. See section 014000 Quality Control of the General Conditions.

Figure 1 - Building 1397 Gutter Location

Figure 2 - Building 1256 Gutter Location

MANUFACTURER MODEL/STYLE COLOR REMARKS

CEILING

ACT Armstrong 1820 24"x24"x3/4" White

FLOORING

Crpt Patcraft 10126 Socrates II-2b Tile 00509 Gellner Crpt Base Roppe 4" 161 Carpet Cove P147 Light Brown VCT-1 Armstrong Standard Excelon 51830 Cottage Tan Accent VCT-2 Armstrong Standard Excelon 51869 Humus Field RB-1 Roppe 4" Cove P147 Light Brown PCT-1 Crossville 12x12 A675 USP Stonehenge Field PCT-2 Crossville 12x12 A790 USP Burgundy Smoke Accent PCTB-1 Crossville 6x12 Bullnose A790 USP Burgundy Smoke Base

WALLS

CWT-1 Dal-Tile 6x6, Ceramic X735 Almond Field CWT-2 Dal-Tile 6x6, Ceramic 0766 Elemental Tan Accent CWT-3 Dal-Tile 6x6, Ceramic P667 Desert Mirage Accent PT-1 Benjamin Moore Eggshell Finish HC-172, Revere Pewter Gyp Bd Interior Walls PT-2 Benjamin Moore Eggshell Finish 1-80, Bright White Gyp Bd Ceilings / Exposed Structure PT-3 Benjamin Moore Eggshell Finish HC-72, Van Buren Brown Interior HM Doors & Frames

MANUFACTURER ADDRESS CITY, STATE, ZIP CODE PHONE

Armstrong P.O. Box 3001 Lancaster, PA 17604 1 877-ARMSTRONG Patcraft P.O. Box 2128 Dalton, GA 30722-2128 800 241-4014 Roppe 1602 N Union St Fostoria, OH 44830 (419) 435-8546 Crossville 349 Sweeney Drive Crossville, TN 38555 931 484-2110 Dal-Tile 7834 C F Hawn Fwy Dallas, TX 75217 (214) 398-1411 Benjamin Moore 101 Paragon Drive Montvale, NJ 07645 855 724-6802

Figure 3 - Standard Finish Schedule and Colors

INTERIOR FINISH MATERIAL & COLORS

ALL ITEMS ARE BRAND NAME OR EQUAL

File details come from the government source that posted it. Updated .