Attach 3_AF Form 66.pdf

PDF 171 KB Posted

Attached to
PKAA Pavements IDIQ (Construction) Federal contract opportunity
Solicitation number
FA461324R0002
Issued by
Department of the Air Force Global Strike Command

About this file

This document provides details for a federal contract solicitation from the Department of the Air Force Global Strike Command. The solicitation seeks proposals for an Indefinite Delivery, Indefinite Quantity contract to provide pavement projects at bases and missile fields between 2024 and 2029. The estimated value of the contract is between $5 million and $10 million. The NAICS code for the work is 237310, and the size standard is $45 million. The last day for questions is March 12, 2024, and interested contractors must request site visits in writing by March 8 if they want a group visit. Proposers must fill out blocks 14 through 20c of Section A and include licensing, registration, and insurance information for any site visit. Funding will be issued at the task order level.

View the file

Other files for this federal contract opportunity

Other files attached to PKAA Pavements IDIQ (Construction), newest first.
File Type Posted
Amendment FA461324R00020002 SF30.pdf PDF
Attach 16_Use of Non-Government Advisors.pdf PDF
Attach 12_Project 2_SOW.pdf PDF
Attach 10_Project 1_SOW.pdf PDF
Attach 5_WD_WY20230040_25Aug23.pdf PDF
Solicitation - FA461324R0002.pdf PDF
Attach 11_Project 1_3052.xlsx XLSX spreadsheet
Attach 2_130005_Environmental_Specifications_Jan2023.pdf PDF
Attach 6_WD_WY20230038_25Aug23.pdf PDF
Attach 15_Project 3_3052.xlsx XLSX spreadsheet
Attach 8_WD_CO20230011_14July23.pdf PDF
Attach 7_WD_NE20230030_6Jan23.pdf PDF
Attach 14_Project 3_ SOW.pdf PDF
Attach 13_Project 2_3052.xlsx XLSX spreadsheet
Attach 9_WD_CO20230014_14July23.pdf PDF
Attach 4_Anticipated Task.pdf PDF
Attach 1_Specifications Maintain Base Pavement_18Jan24.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUIMBER

SCHEDULE OF MATERIAL SUBMITTALS Maintain Base Pavements Basic Contract

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

D

TE

TE

R

EC

EI

VE

C

N

TR

A C

TI

N

G

D A

TE

T

O C

IV

IL

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

ES

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

1 Progress Schedule AF Form 3064.

Section 101.10.2

3 As Required

2 Authority to Act Letter, Section 101.22

3 As Required

3 License of Professional Land Surveyor. Section 101.23

3 As Required

4 Materials Quality Control Plan.

Section 101.24

3 As Required

5 Testing Laboratory. Section 101.24 3 As Required

6 Traffic/Pedestrian Control Plan.

Sections 101.25 and 109.1

3 3 As Required

7 Shoring and Bracing. Section 101.27 3 3 As Required

NPDES, Erosion Control Measures - Best Management Practices.

Sections 101.30, 01010.4 &

3 3 As Required

9 As-Built Drawings. Section 101.33 3 As Required

10 Hazardous Chemicals and Substances List Section 101.34

3 As Required

11 Use of Radioactive Materials.

Section 101.35

3 As Required

12 Safety Plan. Sections 101.37 and 107.6.1

3 As Required

13 Recycled Material Use. Section 101.38

3 As Required

14 Transfer and Acceptance of Military Real Property. Section 101.40

3 As Required

AF Form 66 Page 1 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

15 Contractor Quality Control Plan.

Sections 102.2 and 107.6

3 As Required

16 Quality Assurance - Rearrangements Section 102.3

3 As Required

17 Subcontractor List. Section 105.1 3 As Required

18 Variations from Requirements.

Section 106.2

3 As Required

19 Daily Reports. Section 107.5 3 As Required

20 WSA Work Plan. Section 110.2 3 As Required

21 WSA Emergency Contact Information. Section 110.3

3 As Required

22 WSA Weekly Work Plan. Section 110.3

3 As Required

23 WSA Personnel EAL Information.

Section 110.3

3 As Required

24 WSA Contractor Superintendent Letter. Section 110.3

3 As Required

25 WSA Vehicle & Equipment EAL Information. Section 110.4

3 As Required

26 Fill Material Modified Proctor Test Reports. Section 203.4.1

3 As Required

27 Fill Compaction Density Test Reports. Section 203.4.1

3 As Required

28 Soft Spot Aggregate Soils Classification. Section 203.4.4

AF Form 66 Page 2 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

29 Soft Spot Aggregate Atterburg Limits. Section 203.4.4

3 As Required

30 Soft Spot Aggregate Gradation Report. Section 203.4.4

3 As Required

31 Backfill Compaction Density Test Reports. Section 204.4

3 As Required

32 Backfill Material Modified Proctor Test Reports. Section 204.4

3 As Required

33 Soil Stabilization. Section 207.2 3 As Required

34 Flowable Fill - Mix Design. Section 208.1

3 As Required

35 Flowable Fill - Delivery Tickets.

Section 208.1

3 As Required

36 Aggregate Base Modified Proctor.

Section 301.4

3 As Required

37 Subgrade Modified Proctor Test Report. Section 301.4

3 As Required

38 Subgrade Density Test Report.

Section 301.4

3 3 As Required

39 Aggregate Base Modified Proctor.

Section 301.4

3 3 As Required

40 Aggregate Base Density Test Report. Section 301.4

3 3 As Required

41 Aggregate Base Delivery Tickets.

Section 301.4

3 As Required

RipRap Gradation Test Report and Specific Gravity Certificate of Compliance. Sections 302.5 & 803.7

3 3 As Required

AF Form 66 Page 3 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

43 Bituminous Pavement Mixing Plant.

Section 401.3.2

3 As Required

44 Bituminous Pavement Lay-Down Equipment. Section 401.3.3

3 As Required

45 Bituminous Pavement Mix Design.

Section 401.4.2.1

3 As Required

46 (RAP) Bituminous Pavement Mix Design. Section 401.4.2.2

3 As Required

47 Bituminous Pavement Field and Lab Test Reports. Section 401.4.6

3 3 As Required

48 Core Hole Patch Material. Section 401.4.6

3 3 As Required

49 Bituminous Pavement Delivery Tickets. Section 401.4.7

3 As Required

50 Crack Sealing. Section 402 3 As Required

51 Tack Coat. Section 403 3 As Required

52 Chip Seal Aggregate. Section 404 3 As Required

53 Slurry Seal - Emulsified Asphalt.

Section 404

3 As Required

54 Microsurfacing. Section 404 3 As Required

55 Fog Seals. Section 404 3 As Required

Sampling and Test Results for Slurry Seal Aggregate. Sections 404.1 and 404.4.5

AF Form 66 Page 4 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

57 Chip Seal Aggregate Gradation.

Section 404.4.3.1

3 3 As Required

58 Chip Seal Aggregate Compatibility Testing. Section 404.4.3.1

3 3 As Required

59 Portland Cement Concrete Mix Design. Section 406.4.2

3 As Required

Mechanical Placement of Tie Bars, Dowels & Chairs/Supports. Section 406.4.5

3 3 3 As Required

61 Expansion Joints. Section 406.4.6.1 3 3 As Required

62 Water Application Sprayer. Section 406.4.8

3 As Required

63 Mechanical Method Floating.

406.4.8

3 As Required

64 Type I - Transverse Tining. Section 406.4.8(1)

3 As Required

65 Type II - Longitudinal Tininig.

Section 406.4.8(2)

3 As Required

66 Type III - Artificial Grass Drag.

Section 406.4.8(3)

3 As Required

67 Portable Screed. Section 406.4.8(3) 3 As Required

68 Concrete Grinding Tools. Section 406.4.9(1)

3 As Required

69 Curing. Section 406.4.10 3 3 As Required

70 Joint Sealing Instructions. Section 406.4.13

AF Form 66 Page 5 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

71 Slip Form Paver. Section 406.4.16 3 As Required

72 Concrete Epoxy Resin Adhesive.

Section 406.4.17

3 3 As Required

73 Epoxy Resin Binder & Non-Shrink Grout. Section 406.4.18

3 3 As Required

74 PCC Field and Lab Test Reports.

Section 406.4.19

3 As Required

75 PCC Concrete Delivery Tickets.

Section 406.4.20

3 As Required

76 Paving Fabric, Section 408 3 As Required

77 Corrugated Metal Pipe (CMP) and Flared Ends, Section 601.2

3 As Required

78 Aggregate Bedding Materials.

Sections 601.2, 605.2 & 803.9

3 As Required

Reinforced Concrete Pipe (RCP) and Flared Ends, Section 601.2,

609.2 & 808.1

3 As Required

80 Polyvinyl Chloride Pipe (PVC), Section 601.2, 609.2 & 808.2.2

3 As Required

81 High Density Polyethylelne Pipe, Section 601.2, 609.2 & 808.2.1

3 As Required

82 PCC Curb/Valley Pan/Sidewalk Mix Design. Sections 602.4 and 603.4

3 As Required

83 Manholes. Section 605.2.1 3 3 3 As Required

84 Manhole Covers. Section 605.2.2 3 3 As Required

AF Form 66 Page 6 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

85 Concrete Bases. Section 605.2.3 3 3 3 As Required

86 Inlets & Catch Basins. Section 605.2.4

3 3 3 As Required

87 Chase Drains. Section 605.2.5 3 3 3 As Required

88 Precast Concrete Rings. Section 605.2.6

3 3 As Required

Certifications and Shop Drawings for Precast Concrete Structures.

Section 605.4.3

3 3 As Required

Precast Drainage Structure Certification and Shop Drawings.

Section 605.4.3

3 3 As Required

91 Bollards. Section 606 3 3 As Required

92 Reduce & Enclose Monitoring Well.

Section 607.2

3 3 As Required

93 Install Fence. Section 608.2 3 3 As Required

94 Seamless Copper Water Tube & Fittings, Section 609.2 & 808.3

3 As Required

95 Steel Pipe, Section 609.2 & 808.4 3 As Required

Water System Disinfectant Process and Clearance Reports, Section

609.3.1 & 01 57 19.05 32

3 As Required

97 Valves and Valve Boxes, Section 22 00 00

3 As Required

98 Cast Iron Soil Pipe and Fittings, Section 610.2 & 808.5

AF Form 66 Page 7 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

99 Sheet Aluminum for Regulatory Sign Panels. Section 701.2 & 811.1

3 3 As Required

100 Sheet Aluminum for All Other Sign Panels. Sections 701.2 & 811.2

3 3 As Required

101 Sign Posts. Section 701.2 & 811.3 3 3 As Required

102 Pavement Marking Removal Equipment. Section 702.3.1

3 As Required

103 Controlled Zone Communications.

Section 702.4.4 & 703.4.4

3 3 As Required

104 Pavement Marking Traffic Control Plan. Section 702.4.5

3 3 As Required

105 Pavement Marking Removal Waste Disposal. Section 702.4.6

3 As Required

Pavement Marking Removal Damage Repair Plan. Section 702.4.6

3 As Required

107 Pavement Markings. Section 703 3 As Required

108 Pavement Marking Application Equipment. Section 703.3.1

3 As Required

109 Pavement Marking Application Daily Schedule. Section 703.3.1

3 As Required

Pavement Marking Surface Preparation Chemicals, Detergents, Degreasers. Section 703.4.2.1

3 3 As Required

111 Portland Cement. Section 801.1 3 As Required

112 Admixtures. Section 801.2 3 As Required

AF Form 66 Page 8 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

113 Synthetic Fibers. Section 801.3 3 As Required

114 Fly Ash. Section 801.4 3 As Required

115 Curing Materials. Section 802.1 3 As Required

116 Fine Aggregate for Concrete.

Section 803.2.1

3 As Required

117 Course Aggregate for Concrete.

Section 803.2.2

3 As Required

118 Aggregate Properties for Concrete.

Section 803.2.3

3 3 As Required

119 Pit Run Filler. Section 803.2 3 3 As Required

120 Gradation for Leveling Course.

Section 803.3.5.1

3 3 As Required

121 Gradation for Wearing Course.

Section 803.3.5.2

3 3 As Required

122 Bituminous Pavement Aggregate Properties. Section 803.3.5.3

3 3 As Required

123 Aggregate for Chip Seal. Section 803.5

3 3 As Required

124 Aggregate for Blotter. Section 803.6 3 3 As Required

125 Aggregate for Bases. Section 803.8 3 3 As Required

126 Select Barrow for Fill. Section 803.10

AF Form 66 Page 9 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

127 Performance Graded Asphalt Binder. Section 804.1

3 3 As Required

128 Emulsified Asphalt. Section 804.2 3 As Required

129 Emulsion Types - Tack Coat.

Section 804.2.1(1)

3 As Required

130 Emulsion Types - Fog Seal. Section 804.2.1(2)

3 As Required

131 Emulsion Type - Chip Seal. Section 804.2.1(3)

3 As Required

132 PVC, CMP, RCP Certificates of Compliance. Section 808

3 3 As Required

133 Reinforcing Steel. Section 809 3 3 As Required

134 Test Results and Certification for Striping. Section 812

3 3 As Required

135 Seeding. Sections 805.1.1 & 805.1.2 3 As Required

136 Fertilizer. Section 805.1.3 3 3 As Required

137 Sod. Section 805.1.4 3 3 As Required

138 Silicone Joint Sealant. Section 807.1 3 As Required

139 Hot Poured Elastic Sealant. Section 807.2

3 As Required

140 Dowel Bars. Section 809.1 3 3 As Required

AF Form 66 Page 10 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

141 Tie Bars. Section 809.2 3 3 As Required

142 Water for Concrete. Section 810.2 3 3 As Required

143 Pavement Marking Paints. Section 812.1

3 As Required

144 Pavement Marking Retro-Reflective Beads. Section 812.3

3 As Required

Epoxy Pavement Marking Formulation and Compliance.

Section 812.3.1

3 3 As Required

146 Pavement Marking Thermoplastic.

Section 812.4

3 3 As Required

147 Pavement Marking Tape. Section 812.5

3 As Required

148 Applicable Warranty Documents 3 As Required

Stormwater Discharge Permit - Small. Section 01 57 19.05 32 (4.4.1)

3 As Required

Stormwater Discharge Permit Inspection Logs. Section 01 57

19.05 32 (4.4.1.4)

3 As Required

Stormwater Discharge Permit - Large. Section 01 57 19.05 32 (4.4.2)

3 As Required

Stormwater Discharge Permit Notice of Termination. Section 01 57 19.05 32 (4.4.2.4)

3 As Required

Stormwater Discharge Permit Inspection Logs. Section 01 57

19.05 32 (4.4.2.4)

3 As Required

154 WY Permit to Construct. Section 01 57 19.05 32 (4.5)

AF Form 66 Page 11 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

155 Asbestos Awareness Training.

Section 01 57 19.05 32 (6.1.4)

3 As Required

Asbestos Abatement Worker Certifications. Section 01 57 19.05 32 (6.1.5.1.1)

3 As Required

157 Respirator Fit Test. Section 01 57

19.05 32 (6.1.5.1.1)

3 As Required

158 Medical Survey. Section 01 57 19.05 32 (6.1.5.1.1)

3 As Required

159 10-Day DEQ Notification. Section 01 57 19.05 32 (6.1.5.1.2)

3 As Required

160 Asbestos Abatement Work Plan.

Section 01 57 19.05 32 (6.1.5.1.3)

3 As Required

161 Approved Landfill Certification.

Section 01 57 19.05 32 (6.1.5.1.4)

3 As Required

162 Final Clearance Testing & Results.

Section 01 57 19.05 32 (6.1.5.1.5)

3 3 As Required

163 Personal Monitoring Results.

Section 01 57 19.05 32 (6.1.5.1.6)

3 3 As Required

164 Signed Waste Manifest. Section 01 57 19.05 32 (6.1.5.1.7)

3 As Required

LBP Firm & Personal Training Certification. Section 01 57 19.05 32 (6.2.8)

3 As Required

166 HMMP Authorization. Section 01 57 19.05 32 (8.1)

3 As Required

167 HMMP Usage Report. Section 01 57

19.05 32 (8.2)

3 As Required

168 HMMP Usage Final Report. Section 01 57 19.05 32 (8.5)

AF Form 66 Page 12 SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPROVED

169 Solid Waste Reporting. Section 01 57 19.05 32 (11.4)

3 As Required

170 Recycled Material/Product Report.

Section 01 57 19.05 32 (12.3)

AF Form 66 Page 13 SCHEDULE OF MATERIAL SUBMITTALS

File details come from the government source that posted it. Updated .