- PKAA Pavements IDIQ (Construction) Federal contract opportunity
- Solicitation number
- FA461324R0002
About this file
This document provides details for a federal contract solicitation from the Department of the Air Force Global Strike Command. The solicitation seeks proposals for an Indefinite Delivery, Indefinite Quantity contract to provide pavement projects at bases and missile fields between 2024 and 2029. The estimated value of the contract is between $5 million and $10 million. The NAICS code for the work is 237310, and the size standard is $45 million. The last day for questions is March 12, 2024, and interested contractors must request site visits in writing by March 8 if they want a group visit. Proposers must fill out blocks 14 through 20c of Section A and include licensing, registration, and insurance information for any site visit. Funding will be issued at the task order level.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA461324R00020002 SF30.pdf | ||
| Attach 16_Use of Non-Government Advisors.pdf | ||
| Attach 12_Project 2_SOW.pdf | ||
| Attach 10_Project 1_SOW.pdf | ||
| Attach 5_WD_WY20230040_25Aug23.pdf | ||
| Solicitation - FA461324R0002.pdf | ||
| Attach 11_Project 1_3052.xlsx | XLSX spreadsheet | |
| Attach 2_130005_Environmental_Specifications_Jan2023.pdf | ||
| Attach 6_WD_WY20230038_25Aug23.pdf | ||
| Attach 15_Project 3_3052.xlsx | XLSX spreadsheet | |
| Attach 8_WD_CO20230011_14July23.pdf | ||
| Attach 7_WD_NE20230030_6Jan23.pdf | ||
| Attach 14_Project 3_ SOW.pdf | ||
| Attach 13_Project 2_3052.xlsx | XLSX spreadsheet | |
| Attach 9_WD_CO20230014_14July23.pdf | ||
| Attach 4_Anticipated Task.pdf | ||
| Attach 1_Specifications Maintain Base Pavement_18Jan24.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUIMBER
SCHEDULE OF MATERIAL SUBMITTALS Maintain Base Pavements Basic Contract
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
D
TE
TE
R
EC
EI
VE
C
N
TR
A C
TI
N
G
D A
TE
T
O C
IV
IL
EN
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
TO
R
ES
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
1 Progress Schedule AF Form 3064.
Section 101.10.2
3 As Required
2 Authority to Act Letter, Section 101.22
3 As Required
3 License of Professional Land Surveyor. Section 101.23
3 As Required
4 Materials Quality Control Plan.
Section 101.24
3 As Required
5 Testing Laboratory. Section 101.24 3 As Required
6 Traffic/Pedestrian Control Plan.
Sections 101.25 and 109.1
3 3 As Required
7 Shoring and Bracing. Section 101.27 3 3 As Required
NPDES, Erosion Control Measures - Best Management Practices.
Sections 101.30, 01010.4 &
3 3 As Required
9 As-Built Drawings. Section 101.33 3 As Required
10 Hazardous Chemicals and Substances List Section 101.34
3 As Required
11 Use of Radioactive Materials.
Section 101.35
3 As Required
12 Safety Plan. Sections 101.37 and 107.6.1
3 As Required
13 Recycled Material Use. Section 101.38
3 As Required
14 Transfer and Acceptance of Military Real Property. Section 101.40
3 As Required
AF Form 66 Page 1 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
15 Contractor Quality Control Plan.
Sections 102.2 and 107.6
3 As Required
16 Quality Assurance - Rearrangements Section 102.3
3 As Required
17 Subcontractor List. Section 105.1 3 As Required
18 Variations from Requirements.
Section 106.2
3 As Required
19 Daily Reports. Section 107.5 3 As Required
20 WSA Work Plan. Section 110.2 3 As Required
21 WSA Emergency Contact Information. Section 110.3
3 As Required
22 WSA Weekly Work Plan. Section 110.3
3 As Required
23 WSA Personnel EAL Information.
Section 110.3
3 As Required
24 WSA Contractor Superintendent Letter. Section 110.3
3 As Required
25 WSA Vehicle & Equipment EAL Information. Section 110.4
3 As Required
26 Fill Material Modified Proctor Test Reports. Section 203.4.1
3 As Required
27 Fill Compaction Density Test Reports. Section 203.4.1
3 As Required
28 Soft Spot Aggregate Soils Classification. Section 203.4.4
AF Form 66 Page 2 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
29 Soft Spot Aggregate Atterburg Limits. Section 203.4.4
3 As Required
30 Soft Spot Aggregate Gradation Report. Section 203.4.4
3 As Required
31 Backfill Compaction Density Test Reports. Section 204.4
3 As Required
32 Backfill Material Modified Proctor Test Reports. Section 204.4
3 As Required
33 Soil Stabilization. Section 207.2 3 As Required
34 Flowable Fill - Mix Design. Section 208.1
3 As Required
35 Flowable Fill - Delivery Tickets.
Section 208.1
3 As Required
36 Aggregate Base Modified Proctor.
Section 301.4
3 As Required
37 Subgrade Modified Proctor Test Report. Section 301.4
3 As Required
38 Subgrade Density Test Report.
Section 301.4
3 3 As Required
39 Aggregate Base Modified Proctor.
Section 301.4
3 3 As Required
40 Aggregate Base Density Test Report. Section 301.4
3 3 As Required
41 Aggregate Base Delivery Tickets.
Section 301.4
3 As Required
RipRap Gradation Test Report and Specific Gravity Certificate of Compliance. Sections 302.5 & 803.7
3 3 As Required
AF Form 66 Page 3 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
43 Bituminous Pavement Mixing Plant.
Section 401.3.2
3 As Required
44 Bituminous Pavement Lay-Down Equipment. Section 401.3.3
3 As Required
45 Bituminous Pavement Mix Design.
Section 401.4.2.1
3 As Required
46 (RAP) Bituminous Pavement Mix Design. Section 401.4.2.2
3 As Required
47 Bituminous Pavement Field and Lab Test Reports. Section 401.4.6
3 3 As Required
48 Core Hole Patch Material. Section 401.4.6
3 3 As Required
49 Bituminous Pavement Delivery Tickets. Section 401.4.7
3 As Required
50 Crack Sealing. Section 402 3 As Required
51 Tack Coat. Section 403 3 As Required
52 Chip Seal Aggregate. Section 404 3 As Required
53 Slurry Seal - Emulsified Asphalt.
Section 404
3 As Required
54 Microsurfacing. Section 404 3 As Required
55 Fog Seals. Section 404 3 As Required
Sampling and Test Results for Slurry Seal Aggregate. Sections 404.1 and 404.4.5
AF Form 66 Page 4 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
57 Chip Seal Aggregate Gradation.
Section 404.4.3.1
3 3 As Required
58 Chip Seal Aggregate Compatibility Testing. Section 404.4.3.1
3 3 As Required
59 Portland Cement Concrete Mix Design. Section 406.4.2
3 As Required
Mechanical Placement of Tie Bars, Dowels & Chairs/Supports. Section 406.4.5
3 3 3 As Required
61 Expansion Joints. Section 406.4.6.1 3 3 As Required
62 Water Application Sprayer. Section 406.4.8
3 As Required
63 Mechanical Method Floating.
406.4.8
3 As Required
64 Type I - Transverse Tining. Section 406.4.8(1)
3 As Required
65 Type II - Longitudinal Tininig.
Section 406.4.8(2)
3 As Required
66 Type III - Artificial Grass Drag.
Section 406.4.8(3)
3 As Required
67 Portable Screed. Section 406.4.8(3) 3 As Required
68 Concrete Grinding Tools. Section 406.4.9(1)
3 As Required
69 Curing. Section 406.4.10 3 3 As Required
70 Joint Sealing Instructions. Section 406.4.13
AF Form 66 Page 5 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
71 Slip Form Paver. Section 406.4.16 3 As Required
72 Concrete Epoxy Resin Adhesive.
Section 406.4.17
3 3 As Required
73 Epoxy Resin Binder & Non-Shrink Grout. Section 406.4.18
3 3 As Required
74 PCC Field and Lab Test Reports.
Section 406.4.19
3 As Required
75 PCC Concrete Delivery Tickets.
Section 406.4.20
3 As Required
76 Paving Fabric, Section 408 3 As Required
77 Corrugated Metal Pipe (CMP) and Flared Ends, Section 601.2
3 As Required
78 Aggregate Bedding Materials.
Sections 601.2, 605.2 & 803.9
3 As Required
Reinforced Concrete Pipe (RCP) and Flared Ends, Section 601.2,
609.2 & 808.1
3 As Required
80 Polyvinyl Chloride Pipe (PVC), Section 601.2, 609.2 & 808.2.2
3 As Required
81 High Density Polyethylelne Pipe, Section 601.2, 609.2 & 808.2.1
3 As Required
82 PCC Curb/Valley Pan/Sidewalk Mix Design. Sections 602.4 and 603.4
3 As Required
83 Manholes. Section 605.2.1 3 3 3 As Required
84 Manhole Covers. Section 605.2.2 3 3 As Required
AF Form 66 Page 6 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
85 Concrete Bases. Section 605.2.3 3 3 3 As Required
86 Inlets & Catch Basins. Section 605.2.4
3 3 3 As Required
87 Chase Drains. Section 605.2.5 3 3 3 As Required
88 Precast Concrete Rings. Section 605.2.6
3 3 As Required
Certifications and Shop Drawings for Precast Concrete Structures.
Section 605.4.3
3 3 As Required
Precast Drainage Structure Certification and Shop Drawings.
Section 605.4.3
3 3 As Required
91 Bollards. Section 606 3 3 As Required
92 Reduce & Enclose Monitoring Well.
Section 607.2
3 3 As Required
93 Install Fence. Section 608.2 3 3 As Required
94 Seamless Copper Water Tube & Fittings, Section 609.2 & 808.3
3 As Required
95 Steel Pipe, Section 609.2 & 808.4 3 As Required
Water System Disinfectant Process and Clearance Reports, Section
609.3.1 & 01 57 19.05 32
3 As Required
97 Valves and Valve Boxes, Section 22 00 00
3 As Required
98 Cast Iron Soil Pipe and Fittings, Section 610.2 & 808.5
AF Form 66 Page 7 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
99 Sheet Aluminum for Regulatory Sign Panels. Section 701.2 & 811.1
3 3 As Required
100 Sheet Aluminum for All Other Sign Panels. Sections 701.2 & 811.2
3 3 As Required
101 Sign Posts. Section 701.2 & 811.3 3 3 As Required
102 Pavement Marking Removal Equipment. Section 702.3.1
3 As Required
103 Controlled Zone Communications.
Section 702.4.4 & 703.4.4
3 3 As Required
104 Pavement Marking Traffic Control Plan. Section 702.4.5
3 3 As Required
105 Pavement Marking Removal Waste Disposal. Section 702.4.6
3 As Required
Pavement Marking Removal Damage Repair Plan. Section 702.4.6
3 As Required
107 Pavement Markings. Section 703 3 As Required
108 Pavement Marking Application Equipment. Section 703.3.1
3 As Required
109 Pavement Marking Application Daily Schedule. Section 703.3.1
3 As Required
Pavement Marking Surface Preparation Chemicals, Detergents, Degreasers. Section 703.4.2.1
3 3 As Required
111 Portland Cement. Section 801.1 3 As Required
112 Admixtures. Section 801.2 3 As Required
AF Form 66 Page 8 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
113 Synthetic Fibers. Section 801.3 3 As Required
114 Fly Ash. Section 801.4 3 As Required
115 Curing Materials. Section 802.1 3 As Required
116 Fine Aggregate for Concrete.
Section 803.2.1
3 As Required
117 Course Aggregate for Concrete.
Section 803.2.2
3 As Required
118 Aggregate Properties for Concrete.
Section 803.2.3
3 3 As Required
119 Pit Run Filler. Section 803.2 3 3 As Required
120 Gradation for Leveling Course.
Section 803.3.5.1
3 3 As Required
121 Gradation for Wearing Course.
Section 803.3.5.2
3 3 As Required
122 Bituminous Pavement Aggregate Properties. Section 803.3.5.3
3 3 As Required
123 Aggregate for Chip Seal. Section 803.5
3 3 As Required
124 Aggregate for Blotter. Section 803.6 3 3 As Required
125 Aggregate for Bases. Section 803.8 3 3 As Required
126 Select Barrow for Fill. Section 803.10
AF Form 66 Page 9 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
127 Performance Graded Asphalt Binder. Section 804.1
3 3 As Required
128 Emulsified Asphalt. Section 804.2 3 As Required
129 Emulsion Types - Tack Coat.
Section 804.2.1(1)
3 As Required
130 Emulsion Types - Fog Seal. Section 804.2.1(2)
3 As Required
131 Emulsion Type - Chip Seal. Section 804.2.1(3)
3 As Required
132 PVC, CMP, RCP Certificates of Compliance. Section 808
3 3 As Required
133 Reinforcing Steel. Section 809 3 3 As Required
134 Test Results and Certification for Striping. Section 812
3 3 As Required
135 Seeding. Sections 805.1.1 & 805.1.2 3 As Required
136 Fertilizer. Section 805.1.3 3 3 As Required
137 Sod. Section 805.1.4 3 3 As Required
138 Silicone Joint Sealant. Section 807.1 3 As Required
139 Hot Poured Elastic Sealant. Section 807.2
3 As Required
140 Dowel Bars. Section 809.1 3 3 As Required
AF Form 66 Page 10 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
141 Tie Bars. Section 809.2 3 3 As Required
142 Water for Concrete. Section 810.2 3 3 As Required
143 Pavement Marking Paints. Section 812.1
3 As Required
144 Pavement Marking Retro-Reflective Beads. Section 812.3
3 As Required
Epoxy Pavement Marking Formulation and Compliance.
Section 812.3.1
3 3 As Required
146 Pavement Marking Thermoplastic.
Section 812.4
3 3 As Required
147 Pavement Marking Tape. Section 812.5
3 As Required
148 Applicable Warranty Documents 3 As Required
Stormwater Discharge Permit - Small. Section 01 57 19.05 32 (4.4.1)
3 As Required
Stormwater Discharge Permit Inspection Logs. Section 01 57
19.05 32 (4.4.1.4)
3 As Required
Stormwater Discharge Permit - Large. Section 01 57 19.05 32 (4.4.2)
3 As Required
Stormwater Discharge Permit Notice of Termination. Section 01 57 19.05 32 (4.4.2.4)
3 As Required
Stormwater Discharge Permit Inspection Logs. Section 01 57
19.05 32 (4.4.2.4)
3 As Required
154 WY Permit to Construct. Section 01 57 19.05 32 (4.5)
AF Form 66 Page 11 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
155 Asbestos Awareness Training.
Section 01 57 19.05 32 (6.1.4)
3 As Required
Asbestos Abatement Worker Certifications. Section 01 57 19.05 32 (6.1.5.1.1)
3 As Required
157 Respirator Fit Test. Section 01 57
19.05 32 (6.1.5.1.1)
3 As Required
158 Medical Survey. Section 01 57 19.05 32 (6.1.5.1.1)
3 As Required
159 10-Day DEQ Notification. Section 01 57 19.05 32 (6.1.5.1.2)
3 As Required
160 Asbestos Abatement Work Plan.
Section 01 57 19.05 32 (6.1.5.1.3)
3 As Required
161 Approved Landfill Certification.
Section 01 57 19.05 32 (6.1.5.1.4)
3 As Required
162 Final Clearance Testing & Results.
Section 01 57 19.05 32 (6.1.5.1.5)
3 3 As Required
163 Personal Monitoring Results.
Section 01 57 19.05 32 (6.1.5.1.6)
3 3 As Required
164 Signed Waste Manifest. Section 01 57 19.05 32 (6.1.5.1.7)
3 As Required
LBP Firm & Personal Training Certification. Section 01 57 19.05 32 (6.2.8)
3 As Required
166 HMMP Authorization. Section 01 57 19.05 32 (8.1)
3 As Required
167 HMMP Usage Report. Section 01 57
19.05 32 (8.2)
3 As Required
168 HMMP Usage Final Report. Section 01 57 19.05 32 (8.5)
AF Form 66 Page 12 SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
TE
R
EC
EI
VE
N
TR
A C
TI
N
G
D A
TE
T
O C
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPROVED
169 Solid Waste Reporting. Section 01 57 19.05 32 (11.4)
3 As Required
170 Recycled Material/Product Report.
Section 01 57 19.05 32 (12.3)