About this file

This document includes details for a federal contract solicitation for pavement projects. The solicitation number is FA461324R0002 and is seeking contractors to provide base and missile field pavement projects between 2024 and 2029 under an Indefinite Delivery, Indefinite Quantity contract valued between $5 million and $10 million. All questions regarding the solicitation are due by March 12, 2024 at 10:00 AM Mountain Time. An optional organized site visit is available upon request by March 8, 2024 at 10:00 AM Mountain Time, with additional logistical details to be provided in a subsequent amendment if a visit is scheduled. The NAICS code for this opportunity is 237310, with a size standard of $45 million in average annual receipts. The related federal agency is the Department of the Air Force Global Strike Command.

View the file

Other files for this federal contract opportunity

Other files attached to PKAA Pavements IDIQ (Construction), newest first.
File Type Posted
Amendment FA461324R00020002 SF30.pdf PDF
Attach 16_Use of Non-Government Advisors.pdf PDF
Attach 12_Project 2_SOW.pdf PDF
Attach 10_Project 1_SOW.pdf PDF
Attach 5_WD_WY20230040_25Aug23.pdf PDF
Attach 15_Project 3_3052.xlsx XLSX spreadsheet
Attach 8_WD_CO20230011_14July23.pdf PDF
Attach 7_WD_NE20230030_6Jan23.pdf PDF
Solicitation - FA461324R0002.pdf PDF
Attach 2_130005_Environmental_Specifications_Jan2023.pdf PDF
Attach 6_WD_WY20230038_25Aug23.pdf PDF
Attach 14_Project 3_ SOW.pdf PDF
Attach 13_Project 2_3052.xlsx XLSX spreadsheet
Attach 9_WD_CO20230014_14July23.pdf PDF
Attach 4_Anticipated Task.pdf PDF
Attach 3_AF Form 66.pdf PDF
Attach 1_Specifications Maintain Base Pavement_18Jan24.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank IGE

Solicitation FA461324R0002_Project 1_3052
CLINDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL PRICEDESCRIPTION
1Traffic Control%Submission of Surety for Contract
2Performance Bond and Insurance%Submission of Surety for Contract
3Insurance%Submission of Liabilities for Contract
4Mobilization/demobilization%Submission of Surety for Contract
5Construction Management%Submission of Requirements for Contract
10Strip and Stockpile Existing Topsoil1,780CY$ - 0Remove and stockpile top layer of soil. Stockpile shall be located adjacent to but outside the area of construction so that it is readily accessible to be used on the project site or hauled away if necessary. Approximate average depth of topsoil will need to be determined prior to determination of quantity for this line item. Top soil strip and stock pile shall be identified for projects requiring clearing greater than one acre or as directed by the engineer.
18Concrete Header Curb Removal1,250LF$ - 0Remove concrete header curb. This may require asphalt pavement saw cutting and removal if adjacent to pavement that is to remain in place. If so, asphalt removal will be accounted for under CLIN 0020 and if necessary, CLIN 0021.
19Bituminous Milling, 1 to 3 inches, dispose on base13,000SY$ - 0Mill pavement to a depth up to 3-inches. Place millings in a location on base determined by the contracting officer. Use a correct sized milling machine for each milling operation.
23Bituminous Pavement Removal, 6 Inch Depth or Less1,200SY$ - 0Remove bituminous pavement up to and including 6 inches in depth. Haul away and dispose of rubble off base.
34Excavation and Fill on Site (Use this for shoulder work)1,780CY$ - 0Excavate earthen material other than solid bedrock and use that material to fill areas identified in the drawings or SOW. Compact fill in accordance with specifications and drawings whichever is more stringent.
36Soft-Spot Repair330CY$ - 0Excavate earthen material other than solid bedrock and export material to a location off-base. Place and compact recycled aggregate. Subgrade fill shall meet Section 803.10 or Grading J in accordance with current WYDOT Specs. Provide aggregate base that meets Grading W in accordance with current WYDOT Specs. Material submittal will include Gradation per ASTM C 136, Soils Classification per ASTM D 2487, Atterburg Limits per ASTM D 4318-10, Modified Proctor per ASTM D 1557.
39Spread Stockpiled Topsoil1780CY$ - 0Spread topsoil that may have been stockpiled under CLIN 0008 to the depth identified on the drawings or in the SOW (6 inches if not specified). Finish grade to a smooth surface suitable for seed or sod.
41Seeding1,780SY$ - 0Provide and spread grass seed of the appropriate mixture (prairie grass, buffalo grass, or bluegrass as indicated in the SOW or on the drawings). Apply at the rate specified for each mixture.
47Aggregate Base, 6 Inch, Virgin Aggregate50SY$ - 0Place and compact virgin aggregate base course up to 6 inches in depth. Provide aggregate base that meets Grading W in accordance with current Wyoming DOT Specs. Material submittal will include Gradation per ASTM C 136, Soils Classification per ASTM D 2487, Atterburg Limits per ASTM D 4318-10, Modified Proctor per ASTM D 1557.
54Asphalt Leveling Course, 3 Inch, Virgin Aggregate1,200SY$ - 0Place a 3-inch lift of Asphalt leveling course (virgin aggregate) in accordance with current Wyoming DOT specifications. Include all work necessary for placing asphalt adjacent to other structures such as concrete curb and gutter, existing asphalt, or in rare cases building foundations. Material submittal will include a PG 64-28 mix design that is current in the last year, 1.5% lime, 3/4 inch aggregate, meet Marshall 50 blow count, meet In Place Density of 95% compaction of void less unit weight and include proposed rolling compaction equipment. Central Ave. and Missile Dr. (truck routes) will require an additional PG 64-28 mix design that is current in last year, 1.5% lime, 3/4 inch aggregate, and meets a Marshall 75 blow count.
57Asphalt Wearing Course, 2 Inch, Virgin Aggregate13000SY$ - 0Place a 2-inch lift of Asphalt wearing course (virgin aggregate) in accordance with current Wyoming DOT specifications. Include all work necessary for placing asphalt adjacent to other structures such as concrete curb and gutter, existing asphalt, or in rare cases building foundations. Material submittal will include a PG 64-28 mix design that is current in the last year, 1.5% lime, 1/2 inch aggregate, meet Marshall 50 blow count, meet In Place Density of 92% compaction of void less unit weight and include proposed rolling compaction equipment. Central Ave. and Missile Dr. (truck routes) will require an additional PG 64-28 mix design that is current in last year, 1.5% lime, 1/2 inch aggregate, and meets a Marshall 75 blow count.
62Tack Coat13,000SY$ - 0Provide approved tack coat material and apply in accordance with the specifications between all asphalt pavement lifts.
121Header Curb990LF$ - 0Provide a 6-inch thick by 18-inch wide concrete header curb adjacent to pavement or a 6-inch wide by up to 18-inch depth concrete header curb as specifid in the plans.
142Regulatory Sign10SF$ - 0Provide a new regulatory road sign in accordance with MUTCD standards.
1514 Inch Reflective Striping, Waterborne Paint10,520LF$ - 0Paint reflective striping as depicted on drawings or described in SOW using reflective glass beads.
15518 Inch Reflective Striping, Waterborne Paint36LF$ - 0Paint reflective striping as depicted on drawings or described in SOW using reflective glass beads.
TOTALSub-Total$ - 0