This is a technical specification document for identification and signage for utilities prepared by Herbert, Rowland & Grubic, Inc., applicable to the Borough of Elizabethtown's sanitary sewer infrastructure projects in Pennsylvania. The specification details the requirements for plastic ribbon tape markers to be installed above direct-buried utility lines, specifically sanitary and storm sewer pipes. The ribbon tape must be polyethylene material, brightly colored and compliant with APWA color standards, measuring a minimum of 6 inches wide by 5-mils thick, and manufactured for direct burial service. The tape shall be continuously imprinted with "CAUTION - SANITARY SEWER BELOW" or "CAUTION - STORM SEWER BELOW" in large letters. Installation requires the ribbon tape to be placed continuously over the top of pipes, and when multiple pipes exist in a common trench, the tape shall be positioned above the centerline of the trench. Installation coordination is required with trenching and backfilling work specified in related sections of the contract documents.

This specification document supports both the 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Contract 2026-01 Sewer Maintenance & Emergency Contract. The 2025 project involves approximately 409 linear feet of 8-inch sanitary sewer main, one spot repair, and approximately 152 linear feet of 4-inch and 6-inch sanitary sewer laterals, with two optional alternates. Sealed bids for the 2025 project are due September 15, 2025, at 10:00 AM, with a mandatory pre-bid conference scheduled for September 3, 2025, at 10:00 AM. The 2026 emergency and maintenance contract, with no pre-bid conference required, has a bid deadline of June 16, 2026, at 10:00 AM. All bidding documents are available exclusively through PennBid at https://pennbid.bonfirehub.com/. Bid security of 10 percent is required for submission.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 97 - IDENTIFICATION AND SIGNAGE FOR UTILITIES

Herbert, Rowland & Grubic, Inc. 33 05 97 - 1 000598.0465

SECTION 33 05 97 - IDENTIFICATION AND SIGNAGE FOR UTILITIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Plastic ribbon tape for placement above direct-buried utility.

B. Related Requirements:

1. Section 31 23 16.13 - Trenching: Backfilling considerations for installation of underground pipe markers.

2. Section 31 23 23 - Fill: Backfilling considerations for installation of underground pipe markers.

3. Section 33 31 00 - Sanitary Sewerage Piping: Piping, valves, and appurtenances requiring identification marking.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer catalog information for each specified product.

1.3 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 73 00 - Execution Requirements: Requirements for maintenance materials.

PART 2 - PRODUCTS

2.1 RIBBON TAPE

A. Description:

1. Material: PE.

2. Brightly colored, continuously printed. Complies with APWA Colors.

3. Minimum Size: 6 inches wide by 5-mils thick.

4. Manufactured for direct burial service.

5. Imprint:

a. “CAUTION - SANITARY SEWER BELOW” in large letters.

b. “CAUTION – STORM SEWER BELOW” in large letters.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Ribbon Tape:

1. Continuous over top of pipe.

2. If multiple pipes occur in common trench, locate tape above centerline of trench.

33 05 97 - IDENTIFICATION AND SIGNAGE FOR UTILITIES

Herbert, Rowland & Grubic, Inc. 33 05 97 - 2 000598.0465

3. Coordinate with trench Work as specified in Section 31 23 16.13 – Trenching and 31 23 23 - Fill.

END OF SECTION