This is a specification document for rock removal work prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer improvements project in Pennsylvania. The specification establishes requirements for removing identified and discovered rock during excavation activities, with rock defined as solid mineral material exceeding 1/6 cubic yard in volume or material that cannot be removed with a 3/4 cubic yard capacity excavator without drilling or blasting. The work scope includes mechanical excavation and removal of rock, cutting rock at the bottom of excavation to form level bearing surfaces, removing shaled layers to ensure sound and unshattered base conditions, and excavating utility trenches to 6 inches below pipe invert elevation and 24 inches wider than pipe diameter. All excavated materials must be removed from the site, and any unauthorized rock removal must be corrected in accordance with backfilling and compacting requirements. The contractor is required to conduct a pre-work survey and document existing conditions of nearby buildings through photographs prior to rock removal activities.
Quality control requirements mandate visual inspection of bearing surfaces by the Engineer's inspection agency before subsequent work installation. The specification references related sections covering trenching and backfilling procedures, and requires submittals in accordance with standard submittal procedures. Work scheduling must avoid disruption to occupied buildings in proximity to rock removal activities. This specification section applies to the broader 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Contract 2026-01 Sewer Maintenance & Emergency Contract, both of which involve sanitary sewer system improvements and maintenance work throughout the Borough of Elizabethtown's municipal infrastructure.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 23 16.26 - ROCK REMOVAL
Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 1 000598.0465
SECTION 31 23 16.26 - ROCK REMOVAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Removing identified and discovered rock during excavation.
B. Related Sections:
1. Section 31 23 16.13 - Trenching: Trenching and backfilling for utilities.
2. Section 31 23 23 - Fill: Backfill materials.
1.2 DEFINITIONS
A. Trench Rock: Solid mineral material with volume in excess of 1/6 cu yd or solid material that cannot be removed with 3/4 cu yd capacity excavator without drilling or blasting.
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Submittal procedures.
1.4 PROJECT CONDITIONS
A. Conduct survey and document conditions of buildings near locations of rock removal, prior to rock removal and photograph existing conditions identifying existing irregularities.
1.5 SCHEDULING
A. Schedule Work to avoid disruption to occupied buildings nearby.
PART 2 - PRODUCTS – NOT USED.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify site conditions and note subsurface irregularities affecting Work of this section.
3.2 PREPARATION
A. Identify required lines, levels, contours, and datum.
3.3 ROCK REMOVAL BY MECHANICAL METHOD
A. Excavate and remove rock by mechanical method.
B. Cut away rock at bottom of excavation to form level bearing.
31 23 16.26 - ROCK REMOVAL
Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 2 000598.0465
C. Remove shaled layers to provide sound and unshattered base.
D. In utility trenches, excavate to 6 inches below invert elevation of pipe and 24 inches wider than pipe diameter.
E. Remove excavated materials from site.
F. Correct unauthorized rock removal in accordance with backfilling and compacting requirements of Section 31 23 23.
3.4 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.
B. Request visual inspection of bearing surfaces by Engineer inspection agency before installing subsequent work.
END OF SECTION