This is a specification document for rock removal work prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer improvements project in Pennsylvania. The specification establishes requirements for removing identified and discovered rock during excavation activities, with rock defined as solid mineral material exceeding 1/6 cubic yard in volume or material that cannot be removed with a 3/4 cubic yard capacity excavator without drilling or blasting. The work scope includes mechanical excavation and removal of rock, cutting rock at the bottom of excavation to form level bearing surfaces, removing shaled layers to ensure sound and unshattered base conditions, and excavating utility trenches to 6 inches below pipe invert elevation and 24 inches wider than pipe diameter. All excavated materials must be removed from the site, and any unauthorized rock removal must be corrected in accordance with backfilling and compacting requirements. The contractor is required to conduct a pre-work survey and document existing conditions of nearby buildings through photographs prior to rock removal activities.

Quality control requirements mandate visual inspection of bearing surfaces by the Engineer's inspection agency before subsequent work installation. The specification references related sections covering trenching and backfilling procedures, and requires submittals in accordance with standard submittal procedures. Work scheduling must avoid disruption to occupied buildings in proximity to rock removal activities. This specification section applies to the broader 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Contract 2026-01 Sewer Maintenance & Emergency Contract, both of which involve sanitary sewer system improvements and maintenance work throughout the Borough of Elizabethtown's municipal infrastructure.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 16.26 - ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 1 000598.0465

SECTION 31 23 16.26 - ROCK REMOVAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing identified and discovered rock during excavation.

B. Related Sections:

1. Section 31 23 16.13 - Trenching: Trenching and backfilling for utilities.

2. Section 31 23 23 - Fill: Backfill materials.

1.2 DEFINITIONS

A. Trench Rock: Solid mineral material with volume in excess of 1/6 cu yd or solid material that cannot be removed with 3/4 cu yd capacity excavator without drilling or blasting.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

1.4 PROJECT CONDITIONS

A. Conduct survey and document conditions of buildings near locations of rock removal, prior to rock removal and photograph existing conditions identifying existing irregularities.

1.5 SCHEDULING

A. Schedule Work to avoid disruption to occupied buildings nearby.

PART 2 - PRODUCTS – NOT USED.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify site conditions and note subsurface irregularities affecting Work of this section.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

3.3 ROCK REMOVAL BY MECHANICAL METHOD

A. Excavate and remove rock by mechanical method.

B. Cut away rock at bottom of excavation to form level bearing.

31 23 16.26 - ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 2 000598.0465

C. Remove shaled layers to provide sound and unshattered base.

D. In utility trenches, excavate to 6 inches below invert elevation of pipe and 24 inches wider than pipe diameter.

E. Remove excavated materials from site.

F. Correct unauthorized rock removal in accordance with backfilling and compacting requirements of Section 31 23 23.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request visual inspection of bearing surfaces by Engineer inspection agency before installing subsequent work.

END OF SECTION

File details come from the government source that posted it. Updated .