This is a technical specification document for temporary facilities and controls prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer improvements project. The specification outlines the contractor's responsibilities for establishing and maintaining temporary infrastructure required during construction operations. Key requirements include providing temporary utilities (water service and sanitary facilities), constructing temporary vehicular access roads with all-weather surfaces and adequate load-bearing capacity, establishing designated parking areas either on-site or off-site as approved by the owner, implementing traffic regulation measures including signage and flagperson services, and maintaining fire prevention facilities with portable fire extinguishers distributed throughout construction trailers and storage areas. The specification mandates progress cleaning and waste removal to maintain site cleanliness, establishment of barriers and six-foot-high fencing around the construction perimeter, temporary weathertight exterior enclosures, and comprehensive water, dust, erosion and sediment, noise, and pollution control measures. The contractor must also provide security measures including entry control logs, restrict site access to authorized personnel only, protect existing trees and vegetation within drip lines, and maintain emergency vehicle access with 20-foot-wide driveways free of combustible materials.

Upon project completion, the contractor is responsible for removing all temporary utilities, facilities, and materials before substantial completion inspection, including removal of underground installations to a minimum depth of 18 inches, restoration of damaged existing and permanent facilities to original condition, repair of any paving damage sustained during construction, and removal of traffic control devices with post settings excavated to a depth of two feet. All temporary provisions, construction aids, and associated costs are the contractor's responsibility and must be coordinated with the engineer or owner. No specific pricing, budget allocation, or set-asides are detailed in this specification section, as it establishes only the technical and operational requirements contractors must meet throughout the project duration.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 50 00 - TEMPORARY FACILITIES AND CONTROLS

Herbert, Rowland & Grubic, Inc. 01 50 00 - 1 000598.0465

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Temporary Utilities:

1. Temporary water service.

2. Temporary sanitary facilities.

B. Construction Facilities:

1. Vehicular access.

2. Parking.

3. Progress cleaning and waste removal.

4. Traffic regulation.

5. Fire-prevention facilities.

C. Temporary Controls:

1. Barriers.

2. Enclosures and fencing.

3. Security.

4. Water control.

5. Dust control.

6. Erosion and sediment control.

7. Noise control.

8. Pollution control.

D. Removal of utilities, facilities, and controls.

1.2 TEMPORARY FACILITIES

A. Temporary Provisions Provided by Contractor:

1. Temporary barriers, barricades, covered walkways, fencing, exterior closures, and interior closures.

2. Cleaning during construction.

3. Access roads and approaches.

4. Temporary sanitary facilities.

B. Each Contractor: Coordinate provisions with Engineer or Owner and provide the following items as necessary for execution of the Work including associated costs:

1. Construction aids.

2. Temporary fire protection, dust control, erosion and sediment control, water control, noise control, and other necessary temporary controls.

3. Temporary barriers, barricades, and similar devices as necessary for safety and protection of construction personnel and public.

4. Temporary tree and plant protection.

5. Temporary provisions for protection of installed Work.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 2 000598.0465

1.3 TEMPORARY WATER SERVICE

A. Contractor shall provide and pay for suitable quality water service as needed to maintain specified conditions for construction operations.

B. Extend branch piping with outlets located so that water is available by hoses with threaded connections. Provide temporary pipe insulation and heat tape to prevent freezing.

1.4 TEMPORARY SANITARY FACILITIES

A. Each Contractor shall provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of Project mobilization.

B. At end of construction, return existing facilities used for construction operations to same or better condition as original condition.

1.5 VEHICULAR ACCESS

A. Construct temporary all-weather access roads from public thoroughfares to serve construction area, of width and load-bearing capacity to accommodate unimpeded traffic for construction purposes.

B. Construct temporary bridges and culverts to span low areas and allow unimpeded drainage.

C. Extend and relocate vehicular access as Work progress requires and provide detours as necessary for unimpeded traffic flow.

D. Locate as approved by Engineer and Owner.

E. Provide unimpeded access for emergency vehicles. Maintain 20 foot-wide driveways with turning space between and around combustible materials.

F. Provide and maintain access to fire hydrants and control valves free of obstructions.

G. Provide means of removing mud from vehicle wheels before entering streets.

H. Use designated existing on-Site roads for construction traffic.

1.6 PARKING

A. Locate as approved by Owner.

B. If Site space is not adequate, provide additional off-Site parking.

C. Use of designated areas of existing on-Site streets and driveways used for construction traffic is not permitted. Tracked vehicles are not allowed on paved areas.

D. Use of existing parking facilities used by construction personnel is not permitted.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 3 000598.0465

E. Do not allow heavy vehicles or construction equipment in parking areas.

F. Do not allow vehicle parking on existing pavement.

G. Maintenance:

1. Maintain traffic and parking areas in sound condition free of excavated material, construction equipment, products, mud, snow, ice, and the like.

2. Maintain existing paved areas used for construction; promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage in original condition.

H. Removal, Repair:

1. Remove temporary materials and construction when permanent paving is usable.

2. Remove underground Work and compacted materials to depth of 18-inches; fill and grade Site as indicated.

3. Repair existing and permanent facilities damaged by use, to original condition.

I. Mud from Site vehicles: Provide means of removing mud from vehicle wheels before entering streets.

1.7 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain Site in clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, before enclosing spaces.

1.8 TRAFFIC REGULATION

A. Signs, Signals, and Devices:

1. Post-Mounted and Wall-Mounted Traffic Control and Informational Signs: As approved by authorities having jurisdiction.

2. Traffic Cones, Drums, Flares, and Lights: As approved by authorities having jurisdiction.

3. Flag Person Equipment: As required by authorities having jurisdiction.

B. Flag Persons: Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes.

C. Flares and Lights: Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.

D. Haul Routes:

1. Consult with authorities having jurisdiction and establish public thoroughfares to be used for haul routes and Site access.

2. Confine construction traffic to designated haul routes.

3. Provide traffic control at critical areas of haul routes to regulate traffic and to minimize interference with public traffic.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 4 000598.0465

E. Traffic Signs and Signals:

1. Provide signs at approaches to Site and on Site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.

2. Provide, operate, and maintain traffic control signals to direct and maintain orderly flow of traffic in areas under Contractor's control and areas affected by Contractor's operations.

3. Relocate signs and signals as Work progresses, to maintain effective traffic control.

F. Removal:

1. Remove equipment and devices when no longer required.

2. Repair damage caused by installation.

3. Remove post settings to depth of 2-feet.

1.9 FIRE-PREVENTION FACILITIES

A. Establish fire watch for cutting, welding, and other hazardous operations capable of starting fires. Maintain fire watch before, during, and after hazardous operations until threat of fire does not exist.

B. Portable Fire Extinguishers: NFPA 10; 10-pound capacity, 4A-60B: C UL rating:

1. Provide minimum of one fire extinguisher in every construction trailer and storage shed.

1.10 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.

B. Provide barricades and covered walkways required by authorities having jurisdiction for public rights-of-way.

C. Tree and Plant Protection: Preserve and protect existing trees and plants designated to remain:

1. Protect areas within drip lines from traffic, parking, storage, dumping, chemically injurious materials and liquids, ponding, and continuous running water.

2. Provide 6-foot-high barriers around drip line, with access for maintenance.

3. Replace trees and plants damaged by construction operations.

D. Protect non-owned vehicular traffic, stored materials, Site, and structures from damage.

1.11 ENCLOSURES AND FENCING

A. Construction: Contractor's option.

B. Provide 6-foot-high fence around construction Site; equip with vehicular and pedestrian gates with locks.

C. Exterior Enclosures:

Herbert, Rowland & Grubic, Inc. 01 50 00 - 5 000598.0465

1. Provide temporary weathertight closure of exterior openings to accommodate acceptable working conditions and protection for products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual Specification Sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks.

1.12 SECURITY

A. Security Program:

1. Protect Work on existing premises from theft, vandalism, and unauthorized entry.

B. Entry Control:

1. Restrict entrance of persons and vehicles to Project Site.

2. Allow entrance only to authorized persons with proper identification.

3. Maintain log of workers and visitors and make available to Owner on request.

4. Control entrance of persons and vehicles related to Owner's operations.

1.13 WATER CONTROL

A. Grade Site to drain. Maintain excavations free of water. Provide, operate, and maintain necessary pumping equipment.

B. Protect Site from puddles or running water. Provide water barriers as required to protect Site from soil erosion.

1.14 DUST CONTROL

A. Execute Work by methods that minimize raising dust from construction operations.

B. Provide positive means to prevent airborne dust from dispersing into atmosphere.

1.15 EROSION AND SEDIMENT CONTROL

A. Plan and execute construction by methods to control surface drainage from cuts and fills from borrow and waste disposal areas. Prevent erosion and sedimentation.

B. Minimize surface area of bare soil exposed at one time.

C. Provide temporary measures including berms, dikes, drains, and other devices to prevent water flow.

D. Construct fill and waste areas by selective placement to avoid erosive surface silts and clays.

E. Periodically inspect earthwork to detect evidence of erosion and sedimentation. Promptly apply corrective measures.

F. Comply with sediment and erosion control details.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 6 000598.0465

1.16 NOISE CONTROL

A. Provide methods, means, and facilities to minimize noise produced by construction operations.

1.17 POLLUTION CONTROL

A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances and pollutants produced by construction operations.

B. Comply with pollution and environmental control requirements of authorities having jurisdiction.

1.18 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, and materials before Substantial Completion inspection.

B. Remove underground installations to minimum depth of 18-inches.

C. Clean and repair damage caused by installation or use of temporary Work.

D. Restore existing and permanent facilities used during construction to original condition.

Restore permanent facilities used during construction to specified condition.

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION - Not Used.

END OF SECTION