This is a Warranties specification document issued by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer infrastructure projects in Pennsylvania. The specification establishes comprehensive warranty requirements for all products and work incorporated into the 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Contract 2026-01 Sewer Maintenance & Emergency Contract. The warranty specification requires contractors to submit product warranty manuals and documentation to the Owner and Engineer within ten days following either the Date of Substantial Completion or Partial Utilization, and individually accepted items must have warranty documents submitted within ten days of acceptance. All warranties shall be written in the Owner's name and include both standard product warranties published by manufacturers and special warranties extending beyond manufacturer limitations or providing greater rights to the Owner.

The specification mandates that warranties become valid upon issuance of the Certificate of Substantial Completion and remain in effect concurrent with other contractual warranties, with manufacturer disclaimers not relieving the Contractor of warranty obligations. For delayed work items, contractors must provide an updated schedule within ten days after acceptance listing the acceptance date as the warranty start date. Should warranted work fail, the Contractor bears full responsibility for replacement or rebuilding costs to acceptable condition regardless of prior beneficial use, with warranty reinstatement required through written endorsement adjusted equitably for depreciation. The specification explicitly states that written warranties do not limit implied warranties or the Owner's other legal remedies and obligations, establishing that warranty periods are not interpreted as limitations on the Owner's enforcement rights.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 78 36 – WARRANTIES

Herbert, Rowland & Grubic, Inc. 01 78 36 - 1 000598.0465

SECTION 01 78 36 – WARRANTIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Product warranty manuals.

2. Warranty requirements.

B. Related Sections:

1. Individual Sections for specific requirements for Project Record Documents of the

Work in those Sections.

1.2 PRODUCT WARRANTIES

A. Warranties specified in individual Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. Warranties shall be written in Owner’s name:

1. Standard Product Warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to Owner.

2. Special Warranties are written warranties required by or incorporated into Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for Owner.

B. Submission requirements:

1. Submit documents to Owner and Engineer within 10 days following Date of

Substantial Completion or Partial Utilization. For item accepted after Date of Substantial Completion, submit documents within 10 days following each individual acceptance:

a. When special warranty is required to be executed by Contractor, or

Contractor and a subcontractor, supplier or manufacturer, prepare a written document that contains appropriate terms and identification, ready for execution by required parties. Submit a draft to Owner.

2. Submit information electronically on Owner and Engineer.

1.3 WARRANTY REQUIREMENTS

A. Written warranties made to Owner are in addition to implied warranties and shall not limit duties, obligations, right and remedies otherwise available under Jaw, nor shall warranty periods be interpreted as limitations on time in which Owner can enforce such other duties, obligations, rights, or remedies.

B. Manufacturer's disclaimers and limitations on product warranties shall not relieve Contractor of warranty on Work that incorporates products, nor shall it relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with

01 78 36 – WARRANTIES

Herbert, Rowland & Grubic, Inc. 01 78 36 - 2 000598.0465

Contractor.

C. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution:

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly executed.

3. Refer to Sections for specific content requirements and particular requirements for submitting special warranties.

D. Warranties shall become valid and operative upon issuance of Certificate of Substantial Completion.

E. For items of Work delayed beyond Date of Substantial Completion, provide an updated schedule within 10 days after acceptance, listing date of acceptance as start of warranty.

F. Related Damages and Losses: When correcting warranted Work that has failed, remove and replace other Work that has been damaged as a result of such failure or that needs to be removed and replaced to provide access for correction of warranted Work.

G. Reinstatement of Warranty: In event of Work covered by warranty has failed, correct by replacement or rebuilding. Reinstate warranty by written endorsement. Reinstated warranty shall be equal to original warranty with an equitable adjustment for depreciation.

H. Replacement Cost:

1. Upon determining that Work covered by a warranty has failed replace or rebuild

Work to an acceptable condition in compliance with requirements of Contract Documents.

2. Contractor shall be responsible for cost of replacing or rebuilding defective Work regardless of whether Owner has benefited from use of Work through a portion of its anticipated useful service life.

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION - Not Used.

END OF SECTION