01 74 19 - Construction Waste Management and Disposal.pdf

PDF 216 KB Posted

Attached to
Contract 2026-01: Sewer Maintenance & Emergency Contract
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a construction specification document for Section 01 74 19 - Construction Waste Management and Disposal prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer improvements project. The specification requires contractors to develop and implement a comprehensive construction waste management plan that diverts a minimum of 50 percent by weight of construction waste materials from landfill disposal through resale, recycling, or adaptive reuse throughout the project duration. The plan must be submitted for Engineer approval prior to construction commencement and reviewed during the preconstruction meeting and subsequent progress meetings. Contractors must identify transportation companies, recycling and adaptive reuse processing facilities, anticipated recyclable materials, on-site sorting methods, and storage procedures. The waste management plan implementation begins at the start of construction and must be distributed to all subcontractors and affected parties, with oversight and compliance documentation required with each payment application.

Contractors must submit documentation with each application for payment substantiating plan maintenance and achievement of goals, including quantities by weight of trash deposited in landfills with associated disposal costs, quantities of salvaged materials with destination and associated costs, and total cost or savings for plan implementation. The specification emphasizes waste prevention through ensuring correct material quantities are delivered to the site, selecting products with minimal packaging, requiring suppliers to use returnable pallets or containers, and arranging for buyback or return of rejected or unused items. Collection procedures require marked bins or containers with materials separated by type to prevent co-mingling, organized storage areas free from environmental and fire hazards, and coverage of materials subject to disintegration or runoff. All construction waste must be delivered to appropriate waste processing facilities with receipts obtained, and any materials incapable of recycling or adaptive reuse must be disposed of at landfills, incinerators, or other legal disposal facilities.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Herbert, Rowland & Grubic, Inc. 01 74 19 - 1 000598.0465

SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Construction waste management plan.

1.2 PLAN REQUIREMENTS

A. Develop and implement construction waste management plan as approved by Engineer.

B. Intent:

1. Divert construction, demolition, and land-clearing debris from landfill disposal.

2. Redirect recyclable material back to manufacturing process.

3. Generate cost savings or increase minimal additional cost to Project for waste disposal.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures contains requirements for submittals.

B. Construction Waste Management Plan: Submit construction waste management plan describing methods and procedures for implementation and monitoring compliance including the following:

1. Transportation company hauling construction waste to waste processing facilities.

2. Recycling and adaptive reuse processing facilities and waste type each facility will accept.

3. Construction waste materials anticipated for recycling and adaptive reuse.

4. On-Site sorting and Site storage methods.

C. Submit documentation with each application for payment substantiating construction waste management plan was maintained and goals are being achieved:

1. Trash: Quantity by weight deposited in landfills. Include associated fees, transportation costs, container rentals, and taxes for total cost of disposal.

2. Salvaged Material: Quantity by weight with destination for each type of material salvaged for resale, recycling, or adaptive reuse. Include associated fees, transportation costs, container rentals, taxes for total cost of disposal, and reimbursements due to salvage resale.

3. Total Cost: Indicate total cost or savings for implementation of construction waste management plan.

1.4 CONSTRUCTION WASTE MANAGEMENT PLAN

A. Construction Waste Landfill Diversion: Minimum 50 percent by weight of construction waste materials for duration of Project through resale, recycling, or adaptive reuse.

01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Herbert, Rowland & Grubic, Inc. 01 74 19 - 2 000598.0465

B. Implement construction waste management plan at start of construction.

C. Review construction waste management plan at preconstruction meeting and progress meetings specified in Section 01 31 19 - Project Meetings.

D. Distribute approved construction waste management plan to Subcontractors and others affected by plan requirements.

E. Oversee plan implementation, instruct construction personnel for plan compliance, and document plan results.

F. Purchase products to prevent waste by:

1. Ensuring correct quantity of each material is delivered to Site.

2. Choosing products with minimal or no packaging.

3. Requiring suppliers to use returnable pallets or containers.

4. Requiring suppliers to take or buy back rejected or unused items.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 CONSTRUCTION WASTE COLLECTION

A. Collect construction waste materials in marked bins or containers and arrange for transportation to recycling centers or adaptive salvage and reuse processing facilities.

B. Maintain recycling and adaptive reuse storage and collection area in orderly arrangement with materials separated to eliminate co-mingling of materials required to be delivered separately to waste processing facility.

C. Store construction waste materials to prevent environmental pollution, fire hazards, hazards to persons and property, and contamination of stored materials.

D. Cover construction waste materials subject to disintegration, evaporation, settling, or runoff to prevent polluting air, water, and soil.

3.2 CONSTRUCTION WASTE DISPOSAL

A. Deliver construction waste to waste processing facilities. Obtain receipt for deliveries.

B. Dispose of construction waste not capable of being recycled or adaptively reused by delivery to landfill, incinerator, or other legal disposal facility. Obtain receipt for deliveries.

END OF SECTION