32 12 16 - Asphalt Paving.pdf
PDF 224 KB Posted
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a technical specification document for asphalt paving work prepared for the Borough of Elizabethtown, Pennsylvania, outlining standards and procedures for pavement restoration and construction. The specification covers aggregate subbase installation, aggregate base course construction, and asphalt paving operations, requiring compliance with Pennsylvania Department of Transportation (PennDOT) standards and publications. The work includes restoration of streets, shoulders, driveways, and parking areas with Superpave wearing course and base course asphalt mixtures, temporary surfacing where weather conditions prevent permanent placement, and pavement markings including stop bars, crosswalks, and longitudinal lines. The specification mandates that permanent surfacing be placed no later than ten days following base course paving, with contractor responsibility for maintaining and protecting all surfaces and facilities until final completion. A mandatory pre-bid conference for the related 2025 Sanitary Sewer Improvements Project is scheduled for Wednesday, September 3, 2025, at 10:00 AM at the Elizabethtown Borough Building, with sealed bids due Monday, September 15, 2025, at 10:00 AM through PennBid.
The asphalt paving specification requires materials from a single source throughout the project, including PG 64S-22 asphalt cement, Superpave mixture designs conforming to PennDOT Publication 408, and traffic paint meeting PennDOT Sections 960 and 962. All paving-mix manufacturers must be registered with and approved by PennDOT. The contractor bears responsibility for twelve months of maintenance following the Engineer's approval of the final completion certificate, including repair or replacement of failed work and surface depressions, with the owner authorized to perform uncompleted maintenance and deduct costs from contractor payments. Daily site maintenance is required, including street sweeping, flushing, and dust control through watering, calcium chloride application, or Engineer-approved alternatives. Product data submissions must include asphalt and aggregate material information with supporting laboratory test results for mix design, along with material certification slips documenting quantities utilized from producers in accordance with PennDOT specifications.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 12 16 - ASPHALT PAVING
Herbert, Rowland & Grubic, Inc. 32 12 16 - 1 000598.0465
SECTION 32 12 16 - ASPHALT PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Aggregate subbase.
2. Aggregate base course.
B. Related Requirement:
1. Section 31 23 23 - Fill: Compacted subbase for paving.
1.2 REFERENCE STANDARDS
A. Pennsylvania Department of Transportation:
1. Publication 19 – Field and Laboratory Test Methods, latest edition.
2. Publication 408 - Specifications, latest edition, as amended.
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data:
1. Submit product information for asphalt and aggregate materials.
2. Submit mix design with laboratory test results supporting design.
C. Material Slips: Furnish certification of the amount of materials utilized from the producer in accordance with PennDOT specifications.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by PennDOT.
B. Obtain materials from same source throughout.
C. Perform Work in accordance with Borough of Elizabethtown Public Work’s standard.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Asphalt Materials:
1. Asphalt Cement: PG 64S-22 conforming to PennDOT Bulletin 25.
2. Asphalt Rubber Sealing Compound: Conforming to PennDOT Bulletin 25.
3. Superpave Wearing Course Asphalt Mixture Design: In accordance with PennDOT
Publication 408, Section 413.
Herbert, Rowland & Grubic, Inc. 32 12 16 - 2 000598.0465
4. Superpave Base Course Asphalt Mixture Design: In accordance with PennDOT Publication 408, Section 313.
5. Asphalt Tack Coat: In accordance with PennDOT Publication 408, Section 460.2.
B. Aggregate Subbase: Type C or better, No. 2A, Section 703.2, placement per Section 350.
C. Aggregate Subbase Repair: AASHTO No. 1, in accordance with PennDOT 408, Section 703.2.
D. Traffic Paint – State Highways and Borough Roads: Conforming to PennDOT Section 960 and 962.
PART 3 - EXECUTION
3.1 PREPARATION
A. Existing Pavement Removal:
1. Saw cut existing pavement using a mechanical saw to neat lines equidistant from the centerline of the trench.
2. Remove pavement to width equal to maximum excavated trench width plus not less than one foot on each side of the trench. If roadway is removed or disturbed for a greater width without written authorization of the Engineer, the Owner will require the Contractor to replace such pavement without compensation.
3.2 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify utilities indicated under paving are installed with excavations and trenches backfilled and compacted.
C. Verify compacted subgrade subbase is dry and ready to support paving and imposed loads.
D. Verify gradients and elevations of base are correct.
E. Verify manhole frames are installed in correct position and elevation.
3.3 INSTALLATION
A. General: Restore streets, shoulders, driveways, parking areas and other areas according to the Work Order.
B. Temporary Surfacing:
1. Temporary pavement shall be installed as directed by the Engineer in the event where permanent pavement cannot be placed due to the weather limitations set forth herein for the placing of asphalt material for the permanent base and surface courses. The temporary surface shall be as specified in the Work Order.
Herbert, Rowland & Grubic, Inc. 32 12 16 - 3 000598.0465
2. Contractor shall be responsible for the removal and disposal of the temporary surfacing to the grade required for the placement of the final sub-base, base, and surface at the specified depths.
C. The Contractor shall be responsible for the maintenance and protection of all surfacing, as well as manholes, frame and covers, valve boxes, and other facilities or structures located within the areas of the roadway reconstruction until such time that the permanent pavement or surface can be placed. Permanent surfacing must be placed no later than ten (10) days following the placement of base course paving. In the event that environmental conditions do not allow for placement of permanent surfacing within the ten days specified, permanent surfacing must be placed as soon as conditions allow.
D. Prior to placement of final surfacing, the Contractor, Owner, and Engineer shall inspect all areas to be restored. The Contractor shall be responsible for any replacement of material, regrading, or addition of material deemed necessary by the Engineer in any areas found to be unacceptable for receipt of final surfacing.
E. The Contractor shall be responsible for any necessary adjustments to grade for manholes, frame and covers, and other facilities or structures prior to final surfacing.
F. Asphalt Materials:
1. Superpave Wearing Course Asphalt Mixture Design: In accordance with PennDOT
Publication 408, Section 413.
2. Superpave Base Course Asphalt Mixture Design: In accordance with PennDOT
Publication 408, Section 313.
3. Asphalt Tack Coat: In accordance with PennDOT Publication 408, Section 460.3.
4. Aggregate Subbase: Construct and place in accordance with the requirements of
PennDOT Section 350.3:
a. Install on prepared subgrade as specified in PennDOT Section 210.
b. Install subbase to underside of base course as specified.
5. Asphalt Rubber Sealing Compound: Apply according to PennDOT Bulletin 25. Use to seal joints between existing and new pavements, new pavement and curbing, and new pavement and manhole frame and covers, valve boxes, etc.
G. Pavement Markings:
1. All Pavement Markings, other than Longitudinal Lines, (stop bars, gore markings, crosswalks, turn arrows, bike lane) Markings: Apply in accordance with PennDOT Section 960. Provide satisfactory barrier cones for at least 30 minutes, or until the paint is dry and tack free from vehicular traffic. Repaint marked or damaged areas. Pavement marking placement on the state highway shall conform to TC- 8600 dated June 13, 2013.
2. Longitudinal Lines Pavement Markings: Apply in accordance with PennDOT Section 962. Provide satisfactory barrier cones for at least 30 minutes, or until the paint is dry and track free from vehicular traffic. Repaint marked or damaged areas.
Herbert, Rowland & Grubic, Inc. 32 12 16 - 4 000598.0465
3.4 CLEAN UP
A. During construction, surfaces of all areas including, but not limited to, roads, streets, and driveways shall be maintained on a daily basis to produce a safe, desirable, and convenient condition:
1. Streets shall be swept and flushed after backfilling, and recleaned as dust, mud, stones and debris caused by the work, or related to the work again accumulates.
2. Failure of the Contractor to perform this work shall be cause for the Engineer to order the work to be done by others, and backcharge all costs to the Contractor.
B. Repair or Correction of Unsatisfactory Conditions: All unsatisfactory conditions resulting from the work shall be corrected.
C. Dust Control: Provide effective dust control by sprinkling water, by the use of calcium chloride or by any other methods approved by Engineer. Use dust control measures where, when and in a manner required by Engineer.
3.5 MAINTENANCE
A. Continuously maintain temporary paving without additional compensation until it is replaced with permanent paving.
B. Maintain without additional compensation, such work of this Section done under this Contract for a period of twelve (12) months after the date of Owner’s approval of the final Completion Certificate issued by Engineer, including the repair or removal and replacement of such work which has failed or has been damaged or wherever surface depressions have been developed. Materials and methods used to repair or replace such work shall conform to the applicable requirements of this Section.
C. Should Contractor fail to perform required maintenance or repairs within three days after written notice from Owner or Engineer, the Owner may perform such maintenance or repairs and deduct the cost thereof from any monies due or to become due Contractor.
3.6 RESTORATION SCHEDULE – See Work Order.
END OF SECTION