This is a specification document for photographic documentation requirements issued by Herbert, Rowland & Grubic, Inc. (Engineer) for the Borough of Elizabethtown's 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Sewer Maintenance & Emergency Contract (Contract 2026-01). The contractor is required to provide comprehensive photographic documentation throughout all phases of construction, including preconstruction photographs covering the entire construction zone and surrounding areas such as driveways, sidewalks, utilities, and building exteriors; weekly periodic construction photographs timed to coincide with payment application cutoff dates; and final completion color photographs. All photographs must be submitted within three days of capture in JPG format with minimum resolution of 3200 by 2400 pixels from an 8-megapixel digital camera, accompanied by a key plan identifying vantage points with location, compass direction, and elevation or story of construction. Each image must include metadata containing the project name, photographer contact information, engineer name, contractor name, photograph date, and a unique sequential identifier corresponding to the key plan.

The contractor must transfer all copyright usage rights to the Owner for unlimited use and reproduction of the photographic documentation. Photographs must demonstrate maximum depth of field clarity with no blurry or out-of-focus areas, and must be submitted in unaltered original files maintaining the camera sensor's aspect ratio and date/time stamps. The specification requires submission of a key plan of the project site and building prior to commencing photographic documentation. No pricing terms, bid security amounts, or funding information are specified in this section, as it addresses only the technical and procedural requirements for photographic documentation as a component of the larger sewer infrastructure improvement contracts.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 32 33 – PHOTOGRAPHIC DOCUMENTATION

Herbert, Rowland & Grubic, Inc. 01 32 33 - 1 000598.0465

SECTION 01 32 33 – PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Preconstruction photographs.

2. Periodic construction photographs.

3. Web-based construction photographic documentation.

4. Final completion construction photographs.

B. Related Sections:

1. Section 01 33 00 – Submittals: Procedures for submitting photographic documentation.

1.2 SUBMITTALS

A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same information as corresponding photographic documentation.

B. Digital Photographs: Submit image files within three days of taking photographs:

1. Digital Camera: Minimum sensor resolution of 8 megapixels.

2. Format: JPG with minimum 3200 by 2400 pixels, in unaltered original files, with same aspect ratio as the sensor, uncropped, date and time stamped, in folder named by date of photograph, accompanied by key plan file.

3. Identification: Provide the following information with each image description in file metadata tag:

a. Name of Project.

b. Name and contact information for photographer.

c. Name of Engineer.

d. Name of Contractor.

e. Date photograph was taken.

f. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction.

g. Unique sequential identifier keyed to accompanying key plan.

1.3 USAGE RIGHTS

A. Transfer copyright usage rights to Owner for unlimited use and reproduction of photographic documentation.

01 32 33 – PHOTOGRAPHIC DOCUMENTATION

Herbert, Rowland & Grubic, Inc. 01 32 33 - 2 000598.0465

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION

3.1 GENERAL

A. Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted:

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

3.2 PRECONSTRUCTION PHOTOGRAPHS

A. Photographic documentation is required prior to the start of any construction. Coverage shall include everything within the construction limits as identified on the Contract Drawings.

B. Include coverage driveways, sidewalks, curbs, ditches (to show drainage patterns), street (as full width as possible), landscaping, trees, shrubs, culverts, catch basins, retaining walls, headwalls, fences, visible utilities, and building exteriors within the zones of influence. Buildings should be identified visibly when possible.

C. Properly identify all photographs by number, date, locations and project name.

3.3 PERIODIC CONSTRUCTION PHOTOGRAPHS

A. Take photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.

3.4 FINAL COMPLETION CONSTRUCTION PHOTOGRAPHS

A. Take color photographs after date of Substantial Completion for submission as project record documents. Select vantage points to show status of construction and progress since last photographs were taken.

END OF SECTION