This is a specification document for photographic documentation requirements issued by Herbert, Rowland & Grubic, Inc. (Engineer) for the Borough of Elizabethtown's 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Sewer Maintenance & Emergency Contract (Contract 2026-01). The contractor is required to provide comprehensive photographic documentation throughout all phases of construction, including preconstruction photographs covering the entire construction zone and surrounding areas such as driveways, sidewalks, utilities, and building exteriors; weekly periodic construction photographs timed to coincide with payment application cutoff dates; and final completion color photographs. All photographs must be submitted within three days of capture in JPG format with minimum resolution of 3200 by 2400 pixels from an 8-megapixel digital camera, accompanied by a key plan identifying vantage points with location, compass direction, and elevation or story of construction. Each image must include metadata containing the project name, photographer contact information, engineer name, contractor name, photograph date, and a unique sequential identifier corresponding to the key plan.
The contractor must transfer all copyright usage rights to the Owner for unlimited use and reproduction of the photographic documentation. Photographs must demonstrate maximum depth of field clarity with no blurry or out-of-focus areas, and must be submitted in unaltered original files maintaining the camera sensor's aspect ratio and date/time stamps. The specification requires submission of a key plan of the project site and building prior to commencing photographic documentation. No pricing terms, bid security amounts, or funding information are specified in this section, as it addresses only the technical and procedural requirements for photographic documentation as a component of the larger sewer infrastructure improvement contracts.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 32 33 – PHOTOGRAPHIC DOCUMENTATION
Herbert, Rowland & Grubic, Inc. 01 32 33 - 1 000598.0465
SECTION 01 32 33 – PHOTOGRAPHIC DOCUMENTATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Preconstruction photographs.
2. Periodic construction photographs.
3. Web-based construction photographic documentation.
4. Final completion construction photographs.
B. Related Sections:
1. Section 01 33 00 – Submittals: Procedures for submitting photographic documentation.
1.2 SUBMITTALS
A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same information as corresponding photographic documentation.
B. Digital Photographs: Submit image files within three days of taking photographs:
1. Digital Camera: Minimum sensor resolution of 8 megapixels.
2. Format: JPG with minimum 3200 by 2400 pixels, in unaltered original files, with same aspect ratio as the sensor, uncropped, date and time stamped, in folder named by date of photograph, accompanied by key plan file.
3. Identification: Provide the following information with each image description in file metadata tag:
a. Name of Project.
b. Name and contact information for photographer.
c. Name of Engineer.
d. Name of Contractor.
e. Date photograph was taken.
f. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction.
g. Unique sequential identifier keyed to accompanying key plan.
1.3 USAGE RIGHTS
A. Transfer copyright usage rights to Owner for unlimited use and reproduction of photographic documentation.
01 32 33 – PHOTOGRAPHIC DOCUMENTATION
Herbert, Rowland & Grubic, Inc. 01 32 33 - 2 000598.0465
PART 2 - PRODUCTS - Not Used.
PART 3 - EXECUTION
3.1 GENERAL
A. Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted:
1. Maintain key plan with each set of construction photographs that identifies each photographic location.
3.2 PRECONSTRUCTION PHOTOGRAPHS
A. Photographic documentation is required prior to the start of any construction. Coverage shall include everything within the construction limits as identified on the Contract Drawings.
B. Include coverage driveways, sidewalks, curbs, ditches (to show drainage patterns), street (as full width as possible), landscaping, trees, shrubs, culverts, catch basins, retaining walls, headwalls, fences, visible utilities, and building exteriors within the zones of influence. Buildings should be identified visibly when possible.
C. Properly identify all photographs by number, date, locations and project name.
3.3 PERIODIC CONSTRUCTION PHOTOGRAPHS
A. Take photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.
3.4 FINAL COMPLETION CONSTRUCTION PHOTOGRAPHS
A. Take color photographs after date of Substantial Completion for submission as project record documents. Select vantage points to show status of construction and progress since last photographs were taken.
END OF SECTION