31 23 16 - Excavation.pdf

PDF 214 KB Posted

Attached to
Contract 2026-01: Sewer Maintenance & Emergency Contract
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a Specification Section document for excavation work prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown, Pennsylvania, related to the 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and Contract 2026-01: Sewer Maintenance & Emergency Contract. The excavation specification details work including excavating for paving, roads, parking areas, and site structures, with requirements for unclassified excavation where no additional payment is provided for material difficulties. Key procedural requirements include notification to Pennsylvania One Call System, Inc. at least three working days before work begins to locate underground utilities, protection of existing utilities and structures, sloping of excavation banks to angle of repose, removal of loose matter and subsoil, and removal of lumped subsoil, boulders, and rock up to one-third cubic yard by volume. The contractor must prepare an excavation protection plan describing sheeting, shoring, and bracing materials under the direct supervision of a Professional Engineer licensed in Pennsylvania, and must request inspection of excavation and controlled fill operations in accordance with applicable code before subsequent work installation.

The specification requires contractors to verify utility locations and depths, maintain soil stability, protect excavation bottoms and adjacent soil from freezing, and prevent displacement of soil or utilities. Contractors are responsible for correcting over-excavated areas as directed by the Engineer, removing excess and unsuitable material from the site, and repairing or replacing items damaged during excavation. No specific pricing terms, set-asides, funding amounts, or incumbent information are provided within this technical specification document; such details would be contained in the bidding documents and contract terms available through PennBid.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 16 - EXCAVATION

Herbert, Rowland & Grubic, Inc. 31 23 16 - 1 000598.0465

SECTION 31 23 16 - EXCAVATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Excavating for paving, roads, and parking areas.

2. Excavating for site structures.

B. Related Sections:

1. Section 31 05 13 - Soils for Earthwork: Stockpiling excavated materials.

2. Section 31 05 16 - Aggregates for Earthwork: Stockpiling excavated materials.

3. Section 31 23 16.13 - Trenching: Excavating for utility trenches.

4. Section 31 23 16.26 - Rock Removal: Removal of rock during excavating.

5. Section 31 23 23 - Fill.

1.2 REFERENCES

A. Local utility standards when working within 24 inches of utility lines.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation required to protect excavations and adjacent structures and property; include structural calculations to support plan.

1.4 QUALIFICATIONS

A. Prepare excavation protection plan under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Pennsylvania.

1.5 JOB CONDITIONS

A. Existing Utilities and Services:

1. Contractor shall be responsible for verifying the location and/or depth of all utilities and services indicated within the areas of work.

2. Maintain existing utilities which must remain in service in the area of the excavation.

3. Record locations of underground utilities encountered.

B. Unclassified Excavation: No consideration will be given to the nature of materials encountered in excavating operations for structures. Therefore, as unclassified excavation, no additional payment will be made for difficulties occurring in excavating and handling of materials, including rock.

Herbert, Rowland & Grubic, Inc. 31 23 16 - 2 000598.0465

PART 2 - PRODUCTS – NOT USED.

PART 3 - EXECUTION

3.1 PREPARATION

A. Call Pennsylvania One Call System, Inc. not less than three working days before performing Work:

1. Request underground utilities to be located and marked within and surrounding construction areas.

B. Identify required lines, levels, contours, and datum.

C. Protect utilities indicated to remain from damage.

D. Protect plant life, lawns, and other features remaining as portion of final landscaping.

E. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.

3.2 EXCAVATION

A. Underpin adjacent structures which may be damaged by excavation work.

B. Excavate subsoil to accommodate building foundations, slabs-on-grade paving and site structures, and construction operations.

C. Slope banks with machine to angle of repose or less until shored.

D. Do not interfere with 45 degree bearing splay of foundations.

E. Grade top perimeter of excavation to prevent surface water from draining into excavation.

F. Trim excavation. Remove loose matter.

G. Remove lumped subsoil, boulders, and rock up to 1/3 cu yd measured by volume. Remove larger material as specified in Section 31 23 16.26.

H. Notify Engineer of unexpected subsurface conditions.

I. Correct areas over excavated as directed by Engineer.

J. Remove excess and unsuitable material from site.

K. Repair or replace items indicated to remain damaged by excavation.

Herbert, Rowland & Grubic, Inc. 31 23 16 - 3 000598.0465

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request inspection of excavation and controlled fill operations in accordance with applicable code.

C. Request visual inspection of bearing surfaces by inspection agency before installing subsequent work.

3.4 PROTECTION

A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.

B. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.

C. Protect structures, utilities and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth operations.

END OF SECTION