31 23 23 - Fill.pdf

PDF 219 KB Posted

Attached to
Contract 2026-01: Sewer Maintenance & Emergency Contract
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a technical specification document for fill materials and backfilling procedures prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown's sanitary sewer improvements project in Pennsylvania. The specification details the requirements for multiple fill material types, including structural fill (PennDOT 2A), structure backfill (AASHTO No. 57), granular fill (AASHTO No. 8), flowable fill, and subsoil fill materials. The work encompasses backfilling of building perimeters, site structures, slabs-on-grade, paving areas, and over-excavation corrections. Contractors must place fill materials in continuous layers with specific maximum compacted depths (8 inches for subsoil, structural, and granular fills) and maintain optimum moisture content to achieve required compaction densities. Backfilling must slope away from buildings at a minimum 2 percent grade for at least 10 feet, and all work must be completed within established tolerances of plus or minus 1 inch from required elevations.

The specification requires rigorous field quality control testing using ASTM and AASHTO standards, including laboratory material tests and in-place compaction and moisture tests. Different fill schedules apply depending on the backfilling location: manholes require PennDOT 2A aggregate compacted to 100 percent maximum density per ASTM D698; grass areas require suitable backfill material compacted to 90 percent maximum density; asphalt paving areas require suitable backfill to subbase elevation at 95 percent compaction followed by a PennDOT 2A aggregate layer at 95 percent compaction; and over-excavation corrections require PennDOT 2A aggregate or engineer-approved structural fill at 98 percent maximum dry density. All imported fill materials must be certified to meet or exceed specified requirements, with suppliers and material sources requiring submission prior to work commencement.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 23 - FILL

Herbert, Rowland & Grubic, Inc. 31 23 23 - 1 000598.0465

SECTION 31 23 23 - FILL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Backfilling building perimeter to subgrade elevations.

2. Backfilling site structures to subgrade elevations.

3. Fill under slabs-on-grade.

4. Fill under paving.

5. Fill for over-excavation.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete: Concrete materials.

2. Section 31 05 13 - Soils for Earthwork: Soils for fill.

3. Section 31 05 16 - Aggregates for Earthwork: Aggregates for fill.

4. Section 31 23 16 - Excavation.

5. Section 31 23 16.13 - Trenching: Backfilling of utility trenches.

1.2 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. ASTM International:

1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of

Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

3. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in

Place by Nuclear Methods (Shallow Depth).

4. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for geotextile fabric indicating fabric and construction.

C. Materials Source: Submit name of imported fill materials suppliers.

D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

Herbert, Rowland & Grubic, Inc. 31 23 23 - 2 000598.0465

PART 2 - PRODUCTS

2.1 FILL MATERIALS

A. Structural Fill: Type PennDOT 2A as specified in Section 31 05 16.

B. Structure Backfill: Type AASHTO No. 57 as specified in Section 31 05 16.

C. Granular Fill: Type AASHTO No. 8 as specified in Section 31 05 16.

D. Flowable Fill: Per PennDOT requirements.

E. Subsoil Fill: Type Suitable Backfill and Embankment Material as specified in Section 31 05 13.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify subdrainage, damp proofing, or waterproofing installation has been inspected.

B. Verify underground tanks are anchored to their own foundations to avoid flotation after backfilling.

C. Verify structural ability of unsupported walls to support loads imposed by fill.

3.2 PREPARATION

A. Compact subgrade to density requirements for subsequent backfill materials.

B. Cut out soft areas of subgrade not capable of compaction in place. Backfill with structural fill and compact to density equal to or greater than requirements for subsequent fill material.

C. Proof roll to identify soft spots; fill and compact to density equal to or greater than requirements for subsequent fill material.

3.3 BACKFILLING

A. Backfill areas to contours and elevations with unfrozen materials.

B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or spongy subgrade surfaces.

C. Place material in continuous layers as follows:

1. Subsoil Fill: Maximum 8 inches compacted depth.

2. Structural Fill: Maximum 8 inches compacted depth.

3. Granular Fill: Maximum 8 inches compacted depth.

D. Employ placement method that does not disturb or damage other work.

Herbert, Rowland & Grubic, Inc. 31 23 23 - 3 000598.0465

E. Maintain optimum moisture content of backfill materials to attain required compaction density.

F. Backfill simultaneously on each side of unsupported foundation walls until supports are in place.

G. Slope grade away from building minimum 2 percent slope for minimum distance of 10 ft, unless noted otherwise.

H. Make gradual grade changes. Blend slope into level areas.

I. Remove surplus backfill materials from site.

J. Leave fill material stockpile areas free of excess fill materials.

3.4 TOLERANCES

A. Section 01 40 00 - Quality Requirements: Tolerances.

B. Top Surface of Backfilling Within Building Areas: Plus or minus 1 inch from required elevations.

C. Top Surface of Backfilling Under Paved Areas: Plus or minus 1 inch from required elevations.

D. Top Surface of General Backfilling: Plus or minus 1 inch from required elevations.

3.5 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Perform laboratory material tests in accordance with AASHTO T180, ASTM D1557, or

ASTM D698.

C. Perform in place compaction tests in accordance with the following:

1. Density Tests: ASTM D1556, ASTM D2167, or ASTM D2922.

2. Moisture Tests: ASTM D3017.

D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.

E. Proof roll compacted fill surfaces under pavement.

3.6 PROTECTION OF FINISHED WORK

A. Section 01 73 00 - Execution Requirements: Protecting finished work.

B. Reshape and re-compact fills subjected to vehicular traffic.

Herbert, Rowland & Grubic, Inc. 31 23 23 - 4 000598.0465

3.7 SCHEDULE

A. Manholes:

1. Fill Type: PennDOT 2A Aggregate to subgrade elevation, compact uniformly to

100 percent of maximum density in accordance with ASTM D698.

B. Fill Under Grass Areas:

1. Fill Type: Suitable Backfill and Embankment Material, to 6 inches below finish grade, compact uniformly to 90 percent of maximum density in accordance with

ASTM D698.

C. Fill Under Asphalt Paving:

1. Fill Type: Suitable Backfill and Embankment Material to subbase elevation, compact uniformly to 95 percent maximum dry density in accordance with ASTM D698.

2. Cover with Fill Type: PennDOT 2A aggregate to pavement base, compact uniformly to 95 percent maximum dry density in accordance with ASTM D698.

D. Fill to Correct Over-excavation:

1. Fill Type: PennDOT 2A aggregate or structural fill approved for use by the

Engineer, compacted to 98 percent maximum dry density in accordance with

ASTM D698.

END OF SECTION