01 61 00 - Product Requirements.pdf

PDF 224 KB Posted

Attached to
Contract 2026-01: Sewer Maintenance & Emergency Contract
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This Product Requirements specification document, prepared by Herbert, Rowland & Grubic, Inc., establishes the standards and procedures for product selection, delivery, storage, and handling for the Borough of Elizabethtown's sanitary sewer infrastructure projects. The specification defines product categories including named products, new products, and "or equal" alternatives, with basis-of-design products establishing quality benchmarks. The document outlines that contractors must provide products complying with specified requirements and reference standards, sourced from qualified manufacturers, with domestic products required unless otherwise specified. Delivery requirements mandate that products arrive in manufacturer's original sealed containers with intact labels and instructions, with prompt inspection for compliance and damage assessment. Storage and handling protocols require products to be maintained according to manufacturer's instructions in weathertight, climate-controlled environments for sensitive items, with periodic inspections to verify product condition and prevent deterioration, soiling, or damage.

Product selection procedures established in the specification provide multiple pathways for contractor compliance: when specifications name a single product and manufacturer, that named product must be provided; when multiple manufacturers are listed, contractors may select from the named options; and where basis-of-design products are identified, contractors may request substitution consideration through formal Request for Substitution procedures outlined in the General Conditions. Visual selection specifications allow Owner and Engineer discretion to select from manufacturers' standard or full range of colors, patterns, and textures depending on specification language. The specification requires that all products be new at time of installation and complete with necessary accessories, trim, finish, and fasteners for full installation, with standard products preferred when available and suitable for the project's municipal sewer infrastructure applications.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 61 00 - PRODUCT REQUIREMENTS

Herbert, Rowland & Grubic, Inc. 01 61 00 - 1 000598.0465

SECTION 01 61 00 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

1.2 DEFINITIONS

A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent:

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. “Or Equal” Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis of Design Product: The Project was designed generally around the first or singularly named manufacturers. Where a specific manufacturer's product is named, including make or model number or other designation, it is to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics. If the Contractor chooses to furnish an alternately named manufacturer or product, a substitution request must be made in accordance with paragraph 7.05 of the General Conditions.

1.3 PRODUCTS

A. At minimum, comply with specified requirements and reference standards.

B. Specified products define standard of quality, type, function, dimension, appearance, and performance required.

C. Furnish products of qualified manufacturers that are suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. Confirm that

Herbert, Rowland & Grubic, Inc. 01 61 00 - 2 000598.0465 manufacturer's production capacity can provide sufficient product, on time, to meet Project requirements.

D. Domestic Products: Except where specified otherwise, domestic products are required and interpreted to mean products mined, manufactured, fabricated, or produced in United States or its territories.

1.4 PRODUCT DELIVERY REQUIREMENTS

A. Comply with delivery requirements in Section 01 74 19 - Construction Waste Management and Disposal.

B. Transport and handle products according to manufacturer's instructions.

C. Deliver products in manufacturer's original sealed container or packaging, complete with labels/instructions for storing, handling, unpacking, protecting, and installing.

D. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage.

F. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces:

1. Coordinate delivery with installation to ensure minimum storage for items that are hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

1.5 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products according to manufacturer's instructions.

B. Store products with seals and labels intact and legible.

C. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable to product.

D. For exterior storage of fabricated products, place products on sloped supports aboveground.

E. Provide off-Site storage and protection when Site does not permit on-Site storage or protection.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

Herbert, Rowland & Grubic, Inc. 01 61 00 - 3 000598.0465

H. Provide equipment and personnel to store products; use methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1.6 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Products complying with specified reference standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers named and complying with Specifications; no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit Request for Substitution for any manufacturer not named.

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and that are new at time of installation:

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Engineer reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

B. Product Selection Procedures:

1. Product: Where Specifications name a single product and manufacturer, provide the named product. Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or equal source that complies with requirements. Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

3. Basis-of-Design Product: Where Specifications name a product and manufacturer, provide the specified product. Where Contract Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named provide named product. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

Herbert, Rowland & Grubic, Inc. 01 61 00 - 4 000598.0465

4. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with other specified requirements:

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.

b. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

PART 3 - EXECUTION - Not Used.

END OF SECTION