This is a technical specification document for soils and earthwork materials prepared by Herbert, Rowland & Grubic, Inc. for the Borough of Elizabethtown, Pennsylvania. The specification establishes requirements for subsoil and topsoil materials to be used in the 2025 Sanitary Sewer Improvements Project (Contract No. 2025-01) and the Sewer Maintenance & Emergency Contract (Contract 2026-01). Subsoil materials must include suitable backfill and embankment materials with specified physical characteristics, including gradation of more than 35% passing No. 200 sieve, minimum dry mass density of 95 pounds per cubic foot, maximum liquid limit of 65, and plasticity index requirements. Topsoil materials must be graded, free of roots and rocks larger than 1/2 inch, and conform to ASTM D2487 Group Symbol OH. The specification requires contractors to excavate materials from designated areas, stockpile materials on-site in quantities sufficient to meet project schedules, and maintain separation between differing material types. All materials must be tested and analyzed in accordance with AASHTO and ASTM standards, including moisture-density relations testing. Frozen materials are prohibited, and all soil materials must be furnished from a single source throughout the project duration to ensure consistency and quality control.

The specification mandates that contractors submit 10-pound samples of each fill type in air-tight containers to the testing laboratory and provide certification that all products meet or exceed specified requirements. When testing indicates materials do not meet specified requirements, contractors must change materials and retest at their own expense. Materials that do not meet requirements for subsoil or topsoil must be removed from the project site. Stockpile topsoil is limited to a maximum height of 8 feet, and surface water must be directed away from stockpile sites to prevent erosion or deterioration. The work must be performed in accordance with the Borough of Elizabethtown Public Works standards and relevant references including PennDOT Publications 19 and 408. Upon completion of stockpiling activities, all stockpile areas must be cleaned and graded to prevent free-standing surface water accumulation.

View the file

Other files

File Type Posted
33 31 00 - Sanitary Sewerage Piping.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 26 13-1- RFI Form.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
33 05 61 - Concrete Manholes and Inlets.pdf PDF
01 42 00 - References.pdf PDF
33 05 97 - Identification and Signage for Utilities.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
03 60 00 - Grouting.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
03 30 00 - Cast-in-Place Concrete.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
31 23 23 - Fill.pdf PDF
32 92 19 - Seeding.pdf PDF
Maintenance & Emergency Construction Details.pdf PDF
32 17 23 - Pavement Markings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 62 76 - Contractor's Application for Payment.pdf PDF
00 31 43 - Permit Applications.pdf PDF
00 01 10 - Table of Contents.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
31 23 16 - Excavation.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 63 13 - RFI Form.pdf PDF
31 23 19 - Dewatering.pdf PDF
31 05 16 - Aggregates For Earthwork.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
33 01 30.11 - Television Inspection Of Sewers.pdf PDF
31 05 19.13 - Geotextiles For Earthwork.pdf PDF
31 10 00 - Site Clearing.pdf PDF
33 31 23 - Sanitary Sewerage Pressure Piping.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 10 00 - Project Summary.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
03 10 00 - Concrete Forming and Accessories.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 05 13 - SOILS FOR EARTHWORK

Herbert, Rowland & Grubic, Inc. 31 05 13 - 1 000598.0465

SECTION 31 05 13 - SOILS FOR EARTHWORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Subsoil materials.

2. Topsoil materials.

B. Related Sections:

1. Section 31 05 16 - Aggregates for Earthwork.

2. Section 31 23 16.13 - Trenching.

3. Section 31 23 23 - Fill.

4. Section 32 92 19 – Seeding.

1.2 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT):

1. Publication 19 – Field and Laboratory Test Methods, latest edition.

2. Publication 408 - Specifications, latest edition, as amended.

B. American Association of State Highway and Transportation Officials:

1. AASHTO T89 - Standard Method of Test for Determining the Liquid Limit of Soils.

2. AASHTO T88 - Standard Method of Test for Particle Size Analysis of Soils.

3. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

4. AASHTO T194 - Standard Method of Test for Determination of Organic Matter in

Soils by Wet Combustion.

C. ASTM International:

1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of

Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified

Soil Classification System).

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Samples: Submit, in air-tight containers, 10 lb. sample of each type of fill to testing laboratory.

C. Materials Source: Submit name of imported materials source.

D. Certificate: Certify Products meet or exceed specified requirements.

Herbert, Rowland & Grubic, Inc. 31 05 13 - 2 000598.0465

1.4 QUALITY ASSURANCE

A. Furnish each soil material from single source throughout the Work.

B. Perform Work in accordance with Borough of Elizabethtown Public Work’s standard.

PART 2 - PRODUCTS

2.1 SUBSOIL MATERIALS

A. Suitable Backfill and Embankment Material: Material of maximum size that can be readily placed in loose, 8-inch layers; conforming to the requirements below. Frozen material shall not be utilized.

1. Soil. Includes earth material with the following physical characteristics:

a. Gradation—More than 35% passing No. 200 sieve.

b. Minimum dry mass density—95 pounds per cubic foot determined according to PennDOT PTM No. 106, Method B.

c. Maximum liquid limit—65, determined according to AASHTO T 89.

d. Plasticity index—Not less than liquid limit minus 30, determined according to AASHTO T 90 for soils with liquid limits of 41 to 65.

2. Granular Material. Includes natural or synthetic mineral aggregates having 35% or less passing the No. 200 sieve.

3. Shale. Includes rock-like material formed by natural consolidation of mud, clay, silt, and fine sand; usually thinly laminated, comparatively soft, and easily split.

4. Rock. Includes natural material that cannot be excavated without blasting or using rippers; also boulders and detached stones of a size that cannot be readily placed and compacted in loose, 8-inch layers and having insufficient soil to fill the voids in each layer.

5. Random Material. Includes any accepted combination of the above classifications and may include concrete, brick, stone, or masonry units from demolition.

6. Suitable Material. Reasonably free of organic matter, coal or coal blossom, or other objectionable matter. Wet, dry, or frozen material may be suitable when dried, wetted, or thawed, respectively.

B. Clean Fill: Fill material consisting of soil, rock, stone, dredged material, used asphalt, and brick, block or concrete from construction and demolition activities. The evaluation of fill materials shall be in accordance with PA DEP’s “Clean Fill” regulations and procedures for determining whether material is clean or regulated.

2.2 TOPSOIL MATERIALS

A. Topsoil Type:

1. Excavated and reused material and imported borrow.

2. Graded.

3. Free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds and foreign matter:

a. Screening: Single screened.

4. Conforming to ASTM D2487 Group Symbol OH.

Herbert, Rowland & Grubic, Inc. 31 05 13 - 3 000598.0465

2.3 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Testing and Inspection Services: Testing and analysis of soil material.

B. Testing and Analysis of Subsoil Material: Perform in accordance with ASTM D1557.

C. Testing and Analysis of Topsoil Material: Perform in accordance with ASTM D1557.

D. When tests indicate materials do not meet specified requirements, change material and retest.

E. Furnish materials of each type from same source throughout the Work.

PART 3 - EXECUTION

3.1 EXCAVATION

A. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in designated areas.

B. Stockpile excavated material meeting requirements for subsoil materials and topsoil materials.

C. Remove excess excavated materials not intended for reuse, from site.

D. Remove excavated materials not meeting requirements for subsoil materials and topsoil materials from site.

3.2 STOCKPILING

A. Stockpile materials on site.

B. Stockpile in sufficient quantities to meet Project schedule and requirements.

C. Separate differing materials with dividers or stockpile apart to prevent mixing.

D. Stockpile topsoil 8 feet high maximum.

E. Prevent intermixing of soil types or contamination.

F. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.

3.3 STOCKPILE CLEANUP

A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.

END OF SECTION