AFForm66_epoxy_floor_bldg._35.pdf

PDF 12 KB Posted

Attached to
Install Non-Slip Epoxy Floor in Hangar 35 Federal contract opportunity
Solicitation number
W912JB-16-B-4007
Issued by
Department of the Army Michigan Army National Guard

About this file

Material Submittal Document

View the file

Other files for this federal contract opportunity

Other files attached to Install Non-Slip Epoxy Floor in Hangar 35, newest first.
File Type Posted
Government_Bid_Certified.pdf PDF
Bid_Opening_Minutes_H35_Install_Epoxy_Floors.pdf PDF
Bid_Opening_Sign_In_Sheet.pdf PDF
BID_ABSTRACT_H35_FLOORING.pdf PDF
BID_OPENING_REMINDER_NOTICE.pdf PDF
Site_Visit_Minutes_H35_Install_Epoxy_Floors.pdf PDF
1427_Floors_Sign_In_Sheet.pdf PDF
Hangar_35_Epoxy_Floor_Paint_Booth_Addition.pdf PDF
W912JB16B4007_VGLZ_162041_Amendment_1.pdf PDF
SELFRIDGE___VISION_2020_12May2014_Revision.pdf PDF
ADDENDUM_6_Vision_2020__12May2014.pdf PDF
W912JB-16-B-4007_Solicitation.pdf PDF
Install_epoxy_flr_35FP.pdf PDF
SOW_EPOXY_FLOOR_BLDG._35.pdf PDF
Base_Access_Form.pdf PDF
Synopsis_Hangar_35_Epoxy_Flooring.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

vglz

162041

M S

D S

H E

E T

APPROVED DISAPPROVED

1 epoxy coating 4 4 4 4 4 4 4

SOLICITATION/CONTRACT NO.PROJECT TITLE

EPOXY FLOOR HGR. 35

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

C

E R

T

IF

IC

A

T

IO

N O

F C

O M

P L

IA

N

C E

A N

D C

L O

S E

O U

T

S H

O P

D R

A W

IN

G

S

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY__14____

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSION

DATE