Install Non-Slip Epoxy Floor in Hangar 35 Federal contract opportunity
Solicitation number
W912JB-16-B-4007
Issued by
Department of the Army Michigan Army National Guard

About this file

Solicitation Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Install Non-Slip Epoxy Floor in Hangar 35, newest first.
File Type Posted
Government_Bid_Certified.pdf PDF
Bid_Opening_Minutes_H35_Install_Epoxy_Floors.pdf PDF
Bid_Opening_Sign_In_Sheet.pdf PDF
BID_ABSTRACT_H35_FLOORING.pdf PDF
BID_OPENING_REMINDER_NOTICE.pdf PDF
Site_Visit_Minutes_H35_Install_Epoxy_Floors.pdf PDF
1427_Floors_Sign_In_Sheet.pdf PDF
W912JB16B4007_VGLZ_162041_Amendment_1.pdf PDF
SELFRIDGE___VISION_2020_12May2014_Revision.pdf PDF
ADDENDUM_6_Vision_2020__12May2014.pdf PDF
AFForm66_epoxy_floor_bldg._35.pdf PDF
W912JB-16-B-4007_Solicitation.pdf PDF
Install_epoxy_flr_35FP.pdf PDF
SOW_EPOXY_FLOOR_BLDG._35.pdf PDF
Base_Access_Form.pdf PDF
Synopsis_Hangar_35_Epoxy_Flooring.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

127 MSC

DAVID BROWN

(586) 239-5867

43200 MAPLE ST.

SELFRIDGE ANGB MI 48045-5213

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to add in the addition of the Hangar 35 Paint Booth room to this requirement. The size of the paint booth room is 12' x 25'. There is no updated draw ing for this requirement change.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB-16-B-4007

X 9B. DATED (SEE ITEM 11)

11-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jul-2016

CODE

127 MSC

43200 MAPLE ST

BLDG 105, RM 16

SELFRIDGE ANGB MI 48045-5213

W912JB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE FA6221

FACILITY CODECODE

EMAIL:TEL:

W912JB-16-B-4007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

ADDENDUM 1

ADDENDUM NO. 1 DATE 20 July 2016

( ) TECHNICAL PROVISIONS OF THE SPECIFICATIONS, DATED

( ) DRAWING NO. PAGE , DATED

(x) STATEMENT OF WORK, DATED 2016

( ) PROJECT BOOK, DATED _______________

( ) PROJECT REQUIREMENTS, DATED ___________________

FOR PROJECT:

TITLE: INSTALL EPOXY FLOOR B35

NUMBER: VGLZ 162041

BASE: SELFRIDGE ANG, 127WG, MI_________________________

The following is an addendum for this project:

DELETE FROM STATEMENT OF WORK:

ADD TO STATEMENT OF WORK.

INSTALL EPOXY FLOOR IN THE PAINT BOOTH B 35( SIZE 12X 25.)

END OF ADDENDUM NO.1

The following have been deleted:

AK Electronic Invoices DEC 2004

(End of Summary of Changes)