ord-d-als27l-m004.pdf
PDF 300 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide labor, materials, equipment and supervision to perform the project in accordance with contract documents for an estimated price between $5 million and $10 million over 605 calendar days, with work to start on November 15, 2020. Interested firms must demonstrate experience with similar airport projects. Offers are due by October 7, 2020 and shall include evidence of financial capability, insurance, bonding and a small business subcontracting plan. The Federal Aviation Administration Southwestern Region is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls l-m .d g n
/2
/2
:3
:0
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
SEE NOTE 5
GENERATOR
ENGINE/
480V/3P
250 KW
A
NOT TO SCALE
SECTION - FUEL LINE ROUTING
1/3 HP RETURN PUMP
1/3 HP SUPPLY PUMP
75 GALLON DAY TANK
LEAK DETECTOR
RUPTURE BASIN
RUPTURE BASIN
INLET
MANUAL FILL
ITEM 4222TI
McMASTER-CARR
CHECK VALVE
PER NOTE 2
STRAINER
END (TYPICAL)
WITH UNION
BALL VALVE
3/4" BRONZE
SYSTEM
PIPING CONTAINMENT
DOUBLE-WALL FUEL
REDUCER
1" TO 3/4"
DETAIL - MAINTENANCE SLAB CONSTRUCTION AND PIPE ROUTING
PLAN
LIFTING LUG
4" NPT FITTING (TYPICAL OF 4)
FUEL RETURN LINE
FUEL SUPPLY LINE
1’-7 1/4"2’-0"5’-4 3/4"3’-4"3’-0"4’-6"
AA
AND COVER
18" MANHOLE FRAME
SCALE: 3/4"=1’-0"
15’-4"
BELOW GRADE.. SEE NOTE 3
STORAGE TANK VENT 2’
2" GRSC UNDERGROUND
SIGNAL CABLES
MONITORING SENSOR
3/4" GRSC FOR TANK
CONCRETE SURFACES
REINFORCEMENT 3" CLEAR FROM
FOUNDATION WITH 6 X 6 X 6/6 WWF
CONSTRUCT REINFORCED CONCRETE
MONITORING SENSORS
4" NPT FITTING FOR TANK
22" MANWAY
AND COVER
36" MANHOLE FRAME
TIE-DOWN LOCATION (TYP)
FUEL STORAGE TANK
PLASTIC DOUBLE-WALL UNDERGROUND
1000 GALLON FIBERGLASS REINFORCED
SEE NOTE 5
75 GALLON DAY TANK
FURNISHED WITH E/G.
RETURN LINES TO ENGINE.
FLEXIBLE FUEL SUPPLY AND
TO SHROUD
CANVAS CONNECTION
EXHAUST SILENCER
STAINLESS STEEL
SUBGRADE INSPECTION
INTERIOR BUILDING WALL
SEE NOTE 3
2" EMERGENCY VENT
SEE NOTE 3
1 1/2" NORMAL VENT
SEE NOTE 1
SELENOID VALVE SV-1
RETURN PORT, 1" DIA.
PLUG ALTERNATE
SEE NOTE 4
WITH ENGINE/GENERATOR BY KOHLER
INSTALL FLEXIBLE FUEL LINES PROVIDED
CONTRACTOR FURNISHED OIL DRIP PAN
PROVIDE CLEAR SPACE BENEATH E.G. FOR
SEE NOTE 6
EXHAUST SILENCER
STAINLESS STEEL
2000/5
SEPAR SWK
FUEL FILTER,
STEEL SHEET METAL SHROUD
16 GA. (MIN.) GALVANIZED
SEE NOTE 3
2" EMERGENCY VENT.
SEE NOTE 3
1 1/2" NORMAL VENT.
FROM FUEL STORAGE TANK
3/4" FUEL SUPPLY PIPING
TO TANK
LINE SHALLFALL 1/4" PER FOOT
TO FUEL STORAGE TANK. RETURN
3/4" FUEL RETURN PIPING
EF-1
PLUG
TO UST
FUSIBLE LINK
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS27L-M004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls l-m .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
NOTES:
2.
3.
4.
5.
6.
7.
1.
RUNWAY 27L ALSF-2 / 9R LOCALIZER
FOUNDATION PLAN
UNDERGROUND STORAGE TANK (UST)
KE
RC
SCALE: 3/4" = 1’-0"
3’2’1’01’
8.
FOR TRAINING TO FAA MAINTENANCE TECHNICIANS FOR THE TANK MONITORING SYSTEM.
CONTRACTOR TO PROVIDE MINIMUM AND SESSIONS OF 8-HOURS EACH (NIGHT & DAY)
MAINTENANCE PADS AS MUCH AS POSSIBLE.
HAZARD. MOUNT FUEL PIPING AS CLOSE TO THE WALLS AND ATOP CONCRETE
ALL FUEL PIPING SHALL BE ROUTED SUCH THAT IT DOES NOT CREATE A TRIPPING
PROVIDE DRAIN VALVE ON THE MUFFLER.
ENGINEER.
START-UP PROCEDURES AND PROVIDE THAT DOCUMENTATION TO FAA RESIDENT
BY CONTRACTOR. COORDINATE & ASSIST WITH EG START-UP. FOLLOW KOHLER
ENGINE GENERATOR AND DAY TANK TO BE PROVIDED BY FAA AND INSTALLED
TANK AND THE ENGINE GENERATOR FOR MAINTENANCE PURPOSES.
PROVIDE VALVE ON FLEXIBLE FUEL LINE (SUPPLY AND RETURN) AT BOTH THE DAY
PROVIDE CAPS TO PREVENT RAIN /BIRD INSTRUSION.
TERMINATE 12’ MINIMUM ABOVE FINISHED GRADE. SECURE TO EXTERIOR WALL AT 3’ O.C.
NORMAL, EMERGENCY, AND UNDERGROUND STORAGE TANK VENTS SHALL
INSTALL FILTER AND CHECK VALVE, WHICH ARE FURNISHED WITH THE DAY TANK.
SOLENOID VALVE SV-1 IS INSTALLED AND WIRED BY THE MANUFACTURER.
| 2020-07-02T14:10:36-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:01:38-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .