This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with drawings, specifications, and contract clauses. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5,000,000 to $10,000,000. Offerors must have successfully completed similar projects both in dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020 and must include the required solicitation forms, past performance references, insurance documentation, bonding verification, and subcontracting plan. The solicitation is being conducted by the Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls r-m .d g n
/2
/2
:2
:3
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
FRAME PER
NOTE 4
NOTE 9
AIR FILTER PER
PER NOTE 4
INSECT SCREEN
WASHER AND NUT
W/FLAT WASHER, LOCK
5/8" DIA ALL-THREAD ROD
JACKET (SEE NOTE 3)
1 1/2" INSULATION W/METAL
M
LOW
SPEED
SWITCH
HIGH
SPEED
PUSH TO TEST
MOMENTARY SWITCH
SPRING LOADED HANGER
CHORD (TYPICAL)
ROOF TRUSS BOTTOM
CEILING
3/4" PLYWOOD
BOARD
5/8" GYPSUM
OR EQUAL
GALVANIZED UNISTRUT 3000
EXHAUST MUFFLER SUPPORT
EXHAUST/INTAKE DAMPER HOOD
NOT TO SCALE
DETAIL
(TWO REQUIRED)
NOT TO SCALE
DETAIL
UTILITY FAN
WIRING DIAGRAM
UNIT D-16
7 FROM#
60HZ, CIRCUIT
120 VAC 1-PH,
UNIT THERMOSTAT T1
7 FROM#
60HZ, CIRCUIT
120 VAC 1-PH,
UNIT EF1
7 FROM#
60HZ, CIRCUIT
120 VAC 1-PH,
(TWO REQUIRED)
CLEVIS HANGER
GALVANIZED
16.5" DIAMETER
WEIGHT = 110 LBS.
16.1" DIAM x 76.4" LONG
EXHAUST MUFFLER
FINISH
RUST-PROOF
ENDS SHALL BEAR ON TOP OF WALLS.
TRUSSES SUPPORTING MUFFLER.
PROVIDE DOUBLED BOTTOM CHORD ON
METAL SHROUD.
STEEL SHEET
GALVANIZED
16 GA. (MIN.)
HVAC-1
EUH-1
HVAC-2
EF-1
D-1
E-7
E-9
E-10
E-2
E-6
E-4
E-1
E-5
E-8
E-12
C-13 C-10
A-23R
C-8A
C-8
D-11
D-2
D-8
D-15
D-9
D-17
T-1
D-3
C-4
MC-1
CD-2
D-4
CD-1
D-7
D-12
D-14D-10
E-15
E-16
C-12
C-2
C-7 C-6
C-11
C-9
C-5
T-2
C-1
D-18
C-14
FE FE
FE
FE
D-13
(C-3)
NO. 1
CCR
(C-3)
NO. 2
CCR
(C-3)
NO. 3
CCR
(C-3)
NO. 4
CCR
(C-3)
NO. 5
CCR
E-7
E-7
E-7
D-23
D-19
C-17
C-16
C-18 C-18
C-18
E-11
(TYP.)
DAY TANK, SEE NOTE 2.
E-3
E-14
D-10A
6’-0"6’-6 1/4"
5’-0"5’-0"8’-0"
12’-6 1/4"
2’-0" MIN.
6"
3’-0"
LOCALIZER
EQUIPMENT
ROOM
MECHANICAL PLAN
ALSF-2 EQUIPMENT ROOM
GENERATOR
ENGINE/
HVAC-3
T3. MOUNT 5’-0" A.F.F.
HVAC-3 THERMOSTAT,
J-BOX TYPICAL
4" X 4" X 2" CONTROL CABLE
TYPICAL
6" X 6" X4" NEMA 1 POWER J-BOX
(TYPICAL)
EQUIPMENT TO AVOID CONFLICTS
OF UNIT C-18 WITH INTERIOR
COORDINATE LOCATIONS
ORD-D-ALS9R-M002
STORAGE TANK PER DWG
UNDERGROUND FUEL
TO BUILDING WALL
ROUTE 2’ BELOW GRADE
STORAGE TANK VENT.
2" GRSC UNDERGROUND
D-20
NOTE 1
FRAME. SEE
GENERATOR
ENGINE
3’-6"5’-2 5/8"
12" ABOVE ROOF EDGE.
RAIN CAP. TERMINATE PIPE
PIPE WITH 90 33/64 ELBOW AND
6" GALVANIZED EXHAUST
DETAIL "1" AND SEE NOTE 4
64"W X 52"H EXHAUST HOOD SEE
60"W X 48"H DAMPER, BD-1
ENGINE PER NOTE 1
RETURN LINES TO
FUEL SUPPLY AND
NEBRASKA, EXHAUST PIPE WALL THIMBLE
GT EXHAUST SYSTEMS, LINCOLN,
CAT. NO. 20-A-600 MEETS SPECIFICATIONS.
SECURE TO EXTERIOR WALL 30" O.C. MAXIMUM
TANK VENT. TERMINATE VENTS 12’ ABOVE GRADE
VENT AND 2" GRSC UNDERGROUND STORAGE
1-1/2" GRSC NORMAL VENT, 2" EMERGENCY
AND NOTE 4.
SEE DETAIL "1"
INTAKE HOOD.
60"W x 48"H
JUNCTION BOX, A-23E
CONTROL CABLE
SEE NOTE 4
DAMPER, CD-2.
57 1/2"W x 44"H
SEE DETAIL 1 AND NOTE 4
28"W x 24"H INTAKE HOOD.
NOTE 1.
MATTING PER
SWITCHBOARD
SEE NOTE 3
SILENCER.
EXHAUST
6’-3 1/2"
5’-11 1/4"
SEE NOTE 5
BOX, D-5.
CONTROL
VENTILATION
SEE NOTE 5
WITH E/G
LINE FURNISHED
FLEXIBLE FUEL
PANEL D-16
POWER
D-10B
SEE NOTE 4
DAMPER, CD-1.
28"W X 24"H
1’-0"1’-0"
4’-3"
SENSOR, T-2
TEMPERATURE
INSIDE
FOOT TO TANK
SHALL FALL 1/4" PER
TANK. RETURN LINE
RETURN LINES TO
FUEL SUPPLY AND
ROOM
LOCALIZER EQUIPMENT ROOM
METAL HOOD
STEEL SHEET
STAINLESS
16 GA. (MIN)
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS09R-M001
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
RUNWAY 9R ALSF-2/27L LOCALIZER
MECHANICAL PLAN
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls r-m .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LKN
SCALE: 1/4" = 1’-0"
4’ 8’04’
N
1.
5.
6.
7.
9.
10.
11.
12.
13.
NOTES:
2.
3.
4.
8.
PREVENT RODENT HOUSING.
THE UNUSED PORTION OF THE CONDUIT PENETRATION AT THE LOAD BANK SHALL BE FILLED WITH AGGREGATE TO
THE SWITCH FOR THE EXHAUST FAN SHALL BE A HEAVY DUTY TYPE.
SHALL BE REMOVABLE ALONG LONGITUDINAL ACCESS OF THE GENERATOR, NOT FROM THE SIDES.
CONDUIT AND PIPING STUB UPS TO PROVIDE THIS CLEARANCE. THE DRIP PAN
TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR. COORDINATE ALL
PROVIDE CLEAR SPACE BENEATH THE ENGINE GENERATOR FOR AN OIL DRIP PAN (5’-0" MINIMUM)
CONTRACTOR TO PROVIDE AND INSTALL A DRAIN VALVE ON EXHAUST SILENCER. COORDINATE WORK WITH FAA R.E.
MINIMUM EFFICIENCY REPORTING VALUE OF MERV8 2" FILTERS.
CONSTRUCTION SHALL BE REPLACED ONCE CONSTRUCTION IS COMPLETED. FILTERS SHALL HAVE A
CONTRACTOR TO PROVIDE 200% SPARES FOR ALL AIR FILTERS. ADDITIONALLY THE AIR FILTERS USED DURING
AND ONE NIGHT) TO FAA MAINTENANCE DISTRICT PERSONNEL.
CONTRACTOR TO PROVIDE MINIMUM 2-SESSIONS OF 8-HOUR TRAINING ON HVAC LEAD-LAG CONTROLLER (ONE DAY
THE SETPOINT FOR HEATING SHALL BE 68°F. PROVIDE WITH WASHABLE MERV-8 FILTERS.
AND THE OUTDOOR ENTHALPY IS 50°F @ 50% RH OR BELOW. THE SETPOINT FOR COOLING SHALL BE 78°F AND
AN ECONOMIZER. THE ECONOMIZER SHALL START WHEN THE ROOM TEMPERATURE IS ABOVE THE COOLING SETPOINT
HVAC-3 SHALL BE CONTROLLED BY A WALL THERMOSTAT. UNIT SHALL CONTAIN A 5 KW ELECTRIC HEAT COIL AND
IS 78°F AND THE SETPOINT FOR HEATING IS 68°F. PROVIDE WITH WASHABLE MERV-8 FILTERS.
50°F @ 50% RH OR BELOW (SELECT CHANGEOVER POINT ’D’). FOR BOTH UNITS, THE SETPOINT FOR COOLING
START WHEN THE ROOM TEMPERATURE IS ABOVE THE COOLING SETPOINT AND THE OUTDOOR ENTHALPY IS
BOTH UNITS SHALL CONTAIN A 10 KW ELECTRIC HEAT COIL AND AN ECONOMIZER. THE ECONOMIZER SHALL
SWITCH THE LEAD/LAG DESIGNATION OF EACH UNIT EVERY 7 DAYS TO INSURE EVEN WEAR ON BOTH UNITS.
CONTROL TO THE UNITS, AND HAVE A ETHERNET CAPABILITY. THE CONTROLLER SHALL AUTOMATICALLY
HVAC-1 AND HVAC-2 SHALL BE CONTROLLED BY A MASTER CONTROLLER CAPABLE OF PROVIDING A LEAD/LAG
SEE SPECIAL SPECIFICATIONS SEQUENCE OF OPERATIONS FOR FURTHER DETAILS.
EASY REMOVAL FOR REPLACEMENT (WITHOUT TOOLS).
HOOD ONLY, INSTALL 2" DISPOSABLE PANEL FILTERS. CONSTRUCT FRAME TO HOLD FILTERS IN PLACE AND ALLOW
REINFORCEMENT OF INSECT SCREEN TO PREVENT ANY POSSIBLE COLLAPSE OR BUCKLING. FOR INTAKE DAMPER
INSTALL INSECT SCREEN, STAINLESS STEEL TYPE 304, 18 MESH/INCH, 70% FREE SPACE. PROVIDE ADEQUATE
JACKET. LEAK TEST EXHAUST PIPING PRIOR TO APPLYING INSULATION.
THICK (MIN) MOLDED PIPE INSULATION FINISHED WITH INSULATING CEMENT AND COVERED WITH ALUMINUM ALLOY
INTERIOR EXHAUST PIPING AND MUFFLER SHALL BE INSULATED USING ASBESTOS-FREE CALCIUM SILICATE, 1 1/2"
DOES NOT BECOME A TRIPPING HAZARD.
SECURE TO WALLS OR FRAME @ 3’ O.C. SLOPE PIPING DOWN TO OUTSIDE TANK, 1/4" PER FOOT (MIN). ENSURE PIPING
DAY TANK PIPING TO THE ENGINE GENERATOR AND THE FUEL STORAGE TANK ALONG WALLS AND ENGINE FRAME.
SECURE DAY TANK SEISMICALLY ANCHORED TO FLOOR USING 3/8" x 5" CONCRETE EXPANSION ANCHORS. INSTALL
SHALL BE PLACED AT THE FOUR CORNERS OF THE FRAME BETWEEN THE FRAME AND THE CONCRETE FLOOR.
FRAME TO CONCRETE FLOOR USING 1/2" EXPANSION ANCHORS. 12" X 6" PIECES OF 1/4" SWITCHBOARD MATTING
INSTALL THE ENGINE GENERATOR SEISMICALLY ANCHORED TO FLOOR AT THE LOCATION SHOWN. ANCHOR ENGINE
| 2020-07-02T13:48:57-0500 | |
| RAFAEL CRAME |
| 2020-07-09T14:48:41-0500 | |
| LUIS N DOMINGUEZ |