About this file

This document includes a request for offer for construction services and a related federal contract opportunity notice. The Federal Aviation Administration is soliciting offers for the establishment of NAVAIDS facilities serving the extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor will provide all labor, materials, and equipment to perform the project, including furnishing and installing an underground storage tank and associated piping and monitoring systems. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offers are due by October 7, 2020. Interested firms must have experience with similar airport construction projects and must meet insurance and bonding requirements.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls l-m .d g n

/2

/2

:3

:5

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

NOTE 15

A M003

DETAIL - UNDERGROUND STORAGE TANK

ISOMETRIC VIEW

INSIDE E/G ROOM

MONITOR PANEL

TO TANK

FITTING

SEAL-OFF

WALL

AT SUBSTATION

CONTAINMENT

TERMINATE

FITTING

SEAL-OFF

PANEL INSIDE E/G ROOM

TO TANK MONITOR

SEE NOTE 9

DAY TANK

TO SUBSTATION

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS27L-M002

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls l-m .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

18" DIAMETER STEEL MANHOLE FRAME AND COVER

36" DIAMETER STEEL MANHOLE FRAME AND COVER

UL-1238 REQUIREMENTS.

MANHOLE FRAME AND LID INSTALLATION SHALL MEET

SCREEN PIPE WITH PIPE CAP, FILTER SOCK, 18" STEEL

SUBGRADE INSPECTION WELL, CONSISTING OF 8" DIAMETER

SUPPLIER. SEE NOTES 10 AND 11.

RECOMMENDED BY THE TANK MONITOR CONTROL PANEL

NEAR MANHOLE AND AT BUILDING PENETRATIONS AS

ROOM. INSTALL WIRING AND SEAL-OFF FITTINGS IN CONDUIT

CABLES TO TANK MONITOR CONTROL PANEL INSIDE E/G

1" GRSC WITH TANK LEAK DETECTOR SENSOR SIGNAL

MONITOR CONTROL PANEL SUPPLIER. SEE NOTES 10 AND 11.

BUILDING PENETRATIONS AS RECOMMENDED BY THE TANK

SEAL OFF FITTINGS IN CONDUIT NEAR MANHOLE AND AT

CONTROL PANEL INSIDE E/G ROOM. INSTALL WIRING AND

CONTAINMENT SENSOR SIGNAL WIRES TO TANK MONITOR

1" GRSC WITH FUEL LEVEL MONITORING SENSOR AND SUMP

NUMBERED LEGEND:

DOUBLE WALL PIPING SYSTEM PER NOTE 6.

INSTALL RAINPROOF VENT CAP. GROUND PER NOTE 9.

FINISHED GRADE. SECURE TO SUBSTATION WALL AND

2" GALVANIZED STEEL TANK VENT. TOP SHALL BE 12’ ABOVE

FUEL LEVEL PROBE

3/4" DOUBLE POPPET FOOT VALVE ON SUPPLY LINE

OVERFILL SPILL CONTAINER, LOCKABLE, WITH INTERNAL DRAIN

ADAPTER. SEE NOTE 8.

FILL TUBE WITH OVERFILL SHUT-OFF DEVICE AND BRASS FILL

FUEL RETURN PIPE. SEE NOTES 4, 6, AND 7.

FUEL SUPPLY PIPE. SEE NOTES 4, 6, AND 7.

ATTACHED SUMP CONTAINMENT SENSOR

CONCRETE MAINTENANCE PAD

ACCESS COVER SHALL HAVE A WATER-TIGHT SEAL TO RISER.

42" DIAMETER RISER W/22" DIAMETER MANWAY (BY UST SUPPLIER).

42" DIAMETER ATTACHED SUMP CONTAINMENT

STRAP/TURNBUCKLE ANCHOR SYSTEM (BY UST SUPPLIER)

12" x 12" x 12’ CONCRETE DEADMAN SECTION WITH EYELETS

UNDERGROUND STORAGE TANK (UST). SEE NOTE 1.

1000 GALLON FIBERGLASS-REINFORCED PLASTIC DOUBLE-WALL

RUNWAY 27L ALSF-2 / 9R LOCALIZER

INSTALLATION

UNDERGROUND STORAGE TANK (UST)

KE

RC

17.

OR EQUIVALENT.

ALL INTERIOR FUEL PIPING SHOULD BE PAINTED YELLOW. RUSTOLEUM HI-VIS YELLOW

ALLOW FOR THE INSTALLATION OF THIS TANK.

CONTRACTOR IS RESPONSIBLE TO ACQUIRE ANY OF THE NECESSARY PERMITS TO

SEAL AROUND ALL OPENINGS INTO MANWAY TO PREVENT WATER INTRUSION.

DETERMINED BY THE FAA RESIDENT ENGINEER.

MOUNT EACH UNDER PLEXIGLAS IN THE ENGINE GENERATOR ROOM AT LOCATIONS

CONTRACTOR SHALL FURNISH A FUEL FILL CHART AND A FUEL OIL VALVE SCHEDULE AND

STORAGE TANK. COORDINATE LOCATION WITH FAA RESIDENT INSPECTOR.

CONTRACTOR TO FURNISH AND INSTALL A 12" X 12" NFPA PLACARD FOR UNDERGROUND

LOCATE SEAL-OFF FITTINGS IN TANK MANHOLE ACCESS WELL.

VEEDER ROOT MODEL 300C MEETS SPECIFICATION.

DIAGRAMS, PRODUCT DATA SHEETS, AND INSTALLATION METHODS AND PROCEDURES.

COMMUNICATIONS CAPABILITY. SYSTEM SUPPLIER MUST PROVIDE FUNCTIONAL SCHEMATIC

FUEL INDICATOR WITH REGISTRATION IN GALLONS, OVERFILL ALARM, AND REMOTE

PANELS SHALL HAVE VISUAL AND AUDIBLE, HIGH AND LOW TANK LEVEL ALARMS,

PER MANUFACTURERS INSTALLATION AND WIRING INSTRUCTIONS. ANNUNCIATOR

LIMITED TO, PROBES, CONTROL PANEL, POWER, MONITORING AND SIGNAL CABLES

FURNISH AND INSTALL FUEL LEVEL MONITORING SYSTEM INCLUDING, BUT NOT

BELOW-GRADE SECTIONS OF GRS CONDUIT SHALL BE COATED WITH ASPHALTUM.

SUBSTATION PERIMETER GROUNDING CONDUCTOR VIA EXOTHERMIC WELD.

4/0 AWG BARE COPPER#AWG BARE COPPER GROUND WIRE FROM CLAMP TO BURIED

2#INSTALL GROUNDING CLAMP AT BASE OF 2" GRSC TANK VENT PIPE AND ROUTE

H20 LOAD REQUIREMENTS.

LOCKABLE FILL TUBE COVER AND GROUND MONITOR COVER THAT MEET

FURNISH AND INSTALL BOLTED MANHOLE COVER FOR TANK COLLAR AND

FUEL OIL WITH ANTI-CLOUDING ADDITIVE.

COMPLETION OF LEAK TESTING, TANK SHALL BE FILLED USING NO. 2 DIESEL

FILLING TANK USING AN INTERNAL PRESSURE OF 5.0 PSI. UPON SUCCESSFUL

TANK AND PIPING CONNECTIONS SHALL BE TESTED FOR LEAKS PRIOR TO

SYSTEM MANUFACTURED BY XERXES, MINNEAPOLIS, MN MEETS SPECIFICATIONS.

ENTERING SUBSTATION. ENVIROFLEX DOUBLE-WALL PIPE CONTAINMENT

RESISTIVE BLACK IRON PIPE INSIDE CONTAINMENT RISER AND BEFORE

TRANSITION FROM ENVIROFLEX PIPE TO RIGID 3/4" SCHEDULE 40, CORROSION

CONTAINMENT TO DETECT LEAKS IN SUPPLY AND RETURN FUEL LINES.

RISER AND BUILDING WALL. INSTALL LEAK DETECTION SENSOR INSIDE SUMP

FITTINGS AND END CAPS REQUIRED TO TERMINATE AT SUMP CONTAINMENT

WITH TWO 3/4" PRIMARY PIPES FOR FUEL SUPPLY AND RETURN. INSTALL

DOUBLE-WALL PIPING SYSTEM SHALL CONSIST OF 4" OUTER SECONDARY PIPE

AT BUILDING WALL.

INSTALLED IN " GALVANIZED RIGID STEEL CONDUIT. SEAL PENETRATION

INSTALLATION INSTRUCTIONS. THE MONITOR SIGNAL WIRES SHALL BE

SHALL BE INSTALLED PER TANK MONITORING SYSTEM MANUFACTURER’S

THE TANK MONITOR FUEL PROBE SENSOR AND LEAK DETECTOR SENSOR

FUEL OIL AND GASOLINE STORAGE BY STATE AND LOCAL FIRE MARSHALS.

WITH FITTINGS OF BLACK MALLEABLE IRON APPROVED FOR USE WITH

ALL PIPE SHALL BE CORROSION PROTECTED BLACK IRON PIPE, SCH.40,

FURNISHED AND INSTALLED BY CONTRACTOR.

DIP TUBE (TYPE PER TANK MANUFACTURER’S RECOMMENDATION) SHALL BE

AT LEAST 48 HOURS PRIOR TO INSTALLATION TO COORDINATE INSTALLATION.

WITH ALL STATE AND LOCAL CODES. CONTACT LOCAL FIRE MARSHAL

INSTALLATION INSTRUCTIONS (PROVIDED WITH TANK) AND SHALL COMPLY

TANK SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER’S

OVERALL TANK INSTALLATION SHALL COMPLY WITH CFR-40, PART 280.20(B).

SUBSTITUTION OF TANK TO THE RESIDENT ENGINEER FOR APPROVAL.

MINNEAPOLIS, MN. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR

4’ DIA., DOUBLE-WALL, FRP TANK MANUFACTURED BY XERXES CORPORATION,

WITH UL 1316 (W/UL CERTIFICATION PLATE). DETAILS SHOWN DEPICT 1000 GAL,

AND A 30-YEAR WARRANTY. TANK SHALL BE MANUFACTURED IN ACCORDANCE

OUTLET DESIGN SHALL HAVE SECONDARY CONTAINMENT (150 GALLONS CAPACITY)

DOUBLE-WALL, UNDERGROUND STORAGE TANK (UST) FOR DIESEL FUEL.

CONTRACTOR SHALL FURNISH AND INSTALL A 1000 GALLON FIBERGLASS,

2020-07-02T14:09:30-0500
RAFAEL CRAME
2020-07-09T15:58:32-0500
LUIS N DOMINGUEZ