About this file

This federal solicitation is seeking offers for construction services to establish NAVAIDS facilities serving an extended runway at O'Hare International Airport in Chicago, Illinois. The project includes providing all labor, supervision, materials, and equipment to perform the work, which must be completed within 605 calendar days starting November 15, 2020. The estimated value is between $5 million and $10 million. Offerors must have experience with similar airport construction projects and adhere to the specified schedule. Proposals are due October 7, 2020 and must include details on past performance, bonding and insurance capabilities, and a small business subcontracting plan. The selected contractor will be required to subcontract a portion of the work to small businesses.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-c .d g n

/2

/2

:4

:4

A

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

NOTE:

FOUND ON SHEET ORD-D-XXXXXX-C010.

NOTES REFERENCED ON THIS DRAWING ARE

1/2"

NOT TO SCALE

EXTERIOR DOOR DETAIL

B

NOT TO SCALE

SECTION

A

NOT TO SCALE

SECTION

NOT TO SCALE

TYPICAL HEADER DETAIL

STRUCTURAL LUMBER

DOUGLAS-FIR NO. 2,

2 X 6 OR 2 X 12,

OSB FILLER

1/2" THICK

FOUNDATION

FACE OF

ENTRY PAD

6’ CONCRETE

WALL PANEL BEYOND

STANDING SEAM

CONT. SEALANT

STANDING SEAM PANEL MFR

CONT METAL FLASHING BY

METAL WALL PANEL

STANDING SEAM

SHEATHING

1/2" PLYWOOD

BREAK THRESHOLD

ALUMINUM THERMAL

7 5/8" FRAME

(BELOW)

THRESHOLD

CONT. SEALANT

PANEL MANUFACTURER

BY STANDING SEAM

CONT. JAMB FLASHING

CONT. SEALANT

SHEATHING

1/2" PLYWOOD

WRAP INTO HEAD AND JAMB

AIR AND VAPOR BARRIER

METAL DOOR FRAME

CONT SEALANT

3/4" PLYWOOD SHEATHING

2 X 6 STUD GRADE FRAMING

5/8" TYPE X GYPSUM BOARD

INSULATION (TYP.)

MIN. R-3 THERMAL

CONT SEALANT

6 1/4"

FINISHED FLOOR PER NOTE 1

VINYL WALL BASE (TYPICAL)

3/4" PLYWOOD SHEATHING

1" MIN BETWEEN CONDUIT AND DRYWALL

INSULATION, R-13

FIBERGLASS BATT

2 X 4 STUD GRADE 16" O.C.

5/8" TYPE X GYPSUM BOARD

WITH MINIMUM R=30

FIBERGLASS BATT INSULATION

3/4" PLYWOOD ON CEILING

IMPROVEMENT

PROPOSED SURFACE

SEE CIVIL PLANS FOR

PROVIDE J-CHANNEL CAP AT THE BOTTOM OF SHEATHING.

OVERLAP SHEATHING OVER FOUNDATION 2" MIN

2 X 6 STANDARD WALL STUD, 16" O.C.

TYVEK COMMERCIALWRAP.

APPLY AIR AND WATER INFILTRATION BARRIER,

1/2" ORIENTED STRAND BOARD (OSB) SHEATHING.

PER NOTE 1.

FINISHED FLOOR

VINYL WALL BASE

SPECIFICATIONS

CORP. MEETS

STRIP, PROTECTO

3/8" SILL SEALER

7 3/8"

6 1/4"

TIE, MODEL H2 MEETS SPECIFICATIONS

DOUBLE TOP WALL PLATES. SIMPSON STRONG

THE RAFTER AND CEILING JOISTS TO THE

18 GA. GALVANIZED TIE CONNECTOR. ANCHOR

FIBERGLASS BATT INSULATION, R=30 MIN.

COVER SHEATHING WITH ICE AND WATER SHIELD.

3/4" ORIENTED STRAND BOARD (OSB) SHEATHING.

SUBMIT TRUSS CALCULATIONS TO RESIDENT ENGINEER.

PER TRUSS MANUFACTURER’S TRUSS DESIGN.

WOOD TRUSS WITH METAL CONNECTION PLATES

PLYWOOD SHEATHING

BOARD OVER 3/4"

5/8" TYPE X GYPSUM

EACH RAFTER

BAFFLE BETWEEN

STYROFOAM

1/2"

JAMB

HEAD

SILL

W/NUT AND WASHER, 3’ O.C.

1/2" X 18" J-BOLT

W/NUT AND WASHER, 3’ O.C.

1/2" X 18" J-BOLT

BATT INSULATION R-19

SILL PLATE (DOUBLE)

2 X 6 STUD GRADE

PRESSURE-TREATED

MATERIAL, FINISH, AND COLOR AS THE ROOF PANELS.

AND DOWNSPOUTS USING THE SAME GAUGE,

PROVIDE CONTINUOUS GUTTERS

(KAS: GRACE ICE AND WATER SHIELD (40 MILS) )

ICE & WATER SHIELD

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-C011

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

RUNWAY 9R ALSF-2/27L LOCALIZER

WALL DETAILS AND SECTIONS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls r-c .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

LKN

RC

2020-07-02T13:37:04-0500
RAFAEL CRAME
2020-07-09T14:06:13-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .