About this file

This document provides details for a federal construction contract opportunity with the Department of Transportation Federal Aviation Administration Southwestern Region. The contractor will provide all labor, materials, equipment, and construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The project is estimated to cost between $5 million and $10 million and will have a performance period of 605 calendar days starting on November 15, 2020. Interested firms must demonstrate experience with similar airport construction projects. Offers are due by October 7, 2020 and must include documentation of insurance, bonding capability, subcontracting plans, past performance references, and audited financial statements.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls l-c .d g n

/2

/2

:2

:0

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

(TYP)

30° "

SEE NOTE 12

6 13

VENTILATION FAN, EF-1

U/G FUEL TANK VENT

E/G EXHAUST PIPE SEE NOTES 9 & 10

TYP

HVAC-3

TYP

CONTINUOUS RIDGE VENT

C-18

1’-0"

SCALE: 1/4" = 1’-0"

NORTH ELEVATION

DAY TANK VENTS

04’ 4’ 8’

SCALE: 1/4" = 1’-0"

JUNCTION BOX

CONTROL WIRING

4" X 4" X 4" NEMA 3R

FLIGHT INSPECTION ANTENNA

1 1/4" GRS MAST FOR

FURNISH AND INSTALL

PERSONNEL)

BY FAA INSTALLATION

(FURNISHED AND INSTALLED

FLIGHT CHECK ANTENNA

AND COLOR AS THE WALL PANELS.

USING THE SAME GAUGE, MATERIAL, FINISH,

FABRICATE GUTTERS AND DOWNSPOUTS

INTERIOR EQUIPMENT TO AVOID CONFLICT (TYP)

COORDINATE LOCATION OF UNIT C-18 WITH

HOOD W/DAMPER, CD-2

60"W X 48"H INTAKE

FUEL TANK

UNDERGROUND

TO

HOOD W/DAMPER, BD-1

64"W X 52"H EXHAUST

2" GRS U/G FUEL TANK VENT

FLEXIBLE CONDUIT. SEE NOTE 15

GREEN GROUND IN 3/4" LIQUID-TIGHT

6 INSULATED #6 AWG AND 1 #2

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS27L-C006

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls l-c .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

NUMBERED LEGEND:

RUNWAY 27L ALSF-2 / 9R LOCALIZER

EXTERIOR ELEVATIONS

KE

RC

SWEEP RADIUS SHALL BE 12" MINIMUM.

ENCASED IN 1" DIA. SCHEDULE 80 PVC @ 12" BELOW GRADE.

DIAGONALLY OPPOSITE BUILDING CORNERS. CONDUCTOR MUST BE

WELD BOTH ENDS OF THIS CONDUCTOR TO GROUNDING ELECTRODES AT

ROOF AND DOWN CONDUCTOR, THOMPSON CAT. NO. 32. EXOTHERMICALLY

BASES TO ROOF WITH ROOF ADHESIVE THOMPSON CAT. NO. 731.

CAT. NO. 730 SPACED 30" O.C. MAXIMUM ON ROOF. FASTEN ADHESIVE POINT

STAMPED ADHESIVE CABLE HOLDER WITH BREAK-AWAY TABS, THOMPSON

SHOWN. ITEMS NOT SHOWN BONDED DO NOT REQUIRE BONDING.

DOWN CONDUCTOR TO WALL-MOUNTED EQUIPMENT AND DOOR FRAME AS

TINNED BRONZE BONDING PLATE, THOMPSON CAT. NO. 702, BONDING ROOF AND

TO ROOF AND DOWN CONDUCTOR.

PARALLEL CLAMP, THOMPSON CAT. NO. 565, CONNECTING BONDING CONDUCTOR

BONDED TO ROOF AND DOWN CONDUCTOR.

509X, CONNECTING PARALLEL CLAMP TO BONDING PLATE AT ITEMS TO BE

BONDING CONDUCTOR, 6 AWG BARE COPPER OR THOMPSON CAT. NO. 14X OR

4/0 AWG BARE COPPER PERIMETER GROUNDING CONDUCTOR, 30" BELOW GRADE.

BONDING STRAP, THOMPSON CAT. NO. 588, FROM DOOR FRAME TO DOOR.

FINISHED GRADE (MINIMUM).

3/4" X 10’ STAINLESS STEEL GROUNDING ELECTRODE, 12" BELOW

SHEATHING AND CONTINUOUS ICE AND WATER SHIELD UNDERLAYMENT.

COLOR SHALL BE WHITE. PANELS SHALL BE INSTALLED OVER 3/4"

FABRAL METAL WALL AND ROOFING SYSTEMS MEETS SPECIFICATIONS.

ROOFING MATERIAL. SLIM SEAM METAL ROOFING (16" COVERAGE) FROM

20 YEAR WARRANTY ON FACTORY FINISH, LIFETIME WARRANTY ON

STANDING SEAM METAL ROOFING SYSTEM, 24 GA., GRADE 40 STEEL,

ABOVE GRADE, CARRYING ROOF AND DOWN CONDUCTOR.

1" SCHEDULE 80 PVC CONDUIT FROM 12" BELOW GRADE TO MIN 6’-0"

SHOP DRAWINGS FOR SUBSTITUTION. COLOR SHALL BE WHITE. SEE NOTE 1.

STEEL AND NEOPRENE WASHER WITH COLOR TO MATCH PANEL. PROVIDE

SHEATHING USING STAINLESS STEEL SCREWS WITH A NO. 14 X 1" COMBINATION

FROM FABRAL MEETS SPECIFICATIONS. PANELS SHALL BE FASTENED TO

FADE AND CHALK WARRANTY. MIGHTI-RIB PBR METAL SIDING SYSTEM

10-YEAR WARRANTY AGAINST EDGE RUST AND ACID RAIN, AND 30-YEAR

STEEL, EXPOSED FASTENERS, LIFETIME FILM INTEGRITY WARRANTY.

STRUCTURAL EXPOSED FASTENER WALL SYSTEM, 26 GA., GRADE 80 KSI

DOOR HOLDERS WITH HOOK LATCH

DOOR HOLDER STOP

GUTTERING DOWNSPOUT

5" CONCRETE SPLASH BLOCK AND ROOF

DOOR SIGN, SEE NOTE 11

EXTERIOR TEMPERATURE SENSOR

DISCONNECT SWITCH (UNIT C-18)

AND IN-USE COVER.

GFI RECEPTACLE IN WATERPROOF HOUSING

NOTES:

2.

3.

4.

5.

6.

7.

8.

9.

11.

12.

13.

10.

1.

14.

TO THE FAA PRIOR TO SIDING ENTIRE SHELTER.

PROVIDE A MOCK-UP OF A BUILDING CORNER TO DEMONSTRATE

DOWNSPOUTS SHALL BE BONDED TO THE LIGHTNING PROTECTION SYSTEM.

BUILDING NUMBER AND EXACT LOCATION WITH THE FAA R.E. TYPICAL TWO PLACES.

FACING THE ROAD DENOTING THE FIRE DEPARTMENT BUILDING NUMBER. COORDINATE

CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON THE SIDE OF BUILDING

WITH FAA RESIDENT ENGINEER APPROVAL.

THE FAA LOGO. COORDINATE SIGN SIZE, COLORING AND ROOM DESIGNATIONS

EQUIPMENT ROOM. THE SIGN SHALL INCLUDE A COLOR REPRESENTATION OF

THAT DESIGNATES THE ROOM’S USE, I.E., GENERATOR ROOM, LOCALIZER ROOM,

CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON EACH EXTERIOR DOOR

PREVENT MOISTURE AND SMALL ANIMAL INFILTRATION.

PROVIDE E/G MUFFLER EXHAUST PIPE WITH TOP CAP TO

PROVIDE STAINLESS STEEL E/G MUFFLER EXHAUST PIPE.

ALL EXTERIOR LIGHTS MUST BE LED TYPE WITH PHOTO CONTROL ONLY.

APPLY ANTI-SEIZE COMPOUND TO ALL THREADED EXTERIOR CONNECTIONS.

GUTTERS SHALL BE CONTINUOUS AND SEAMLESS.

PROVIDE SNOW GUARDS ABOVE ALL EXTERIOR DOORS.

PROVIDE PIPE WITH EYEBOLT AND HASP FOR ALL EXTERIOR SERVICE DOORS.

6 BARE GROUND.#PROTECTION SYSTEM VIA

BOND ALL EXTERIOR METALLIC ITEMS TO THE LIGHTNING

WITH SILICONE SEALER, EXTERIOR GRADE. COLOR SHALL BE WHITE.

CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH BUILDING WALLS

INSTALLATION INSTRUCTION BOOK. SUBMIT SUBSTITUTIONS PER SPECIFICATIONS.

PROVIDED BY THE MANUFACTURER WITH A DETAILED LIST OF MATERIAL IN AN

SYSTEM, WITH WARRANTY, PER SPECIAL SPECIFICATIONS. MATERIAL SHALL BE

TRIM SYSTEM SHALL BE FABRICATED BY ONE MANUFACTURER AS A COMPLETE

STANDING SEAM METAL ROOFING PANELS, SIDING PANELS, AND SOFFIT, FASCIA, AND

ADHESIVE, M1 BY CHEMLINK.

THOMPSON CAT. NO. 71A. FASTEN ADHESIVE SADDLE TO ROOF WITH

AND ADAPTER THOMPSON CAT. NO. 665 AND ADJUSTABLE RIDGE SADDLE

LONG COPPER AIR TERMINAL WITH NICKEL-PLATED ROUNDED BLUNT TIP

AIR TERMINAL ASSEMBLY (5 REQUIRED) CONSISTING OF A 5/8" DIA X 12"

DRAWINGS FOR SUBSTITUTION. SEE NOTE 1

FROM FABRAL MEETS SPECIFICATIONS. COLOR SHALL BE WHITE. PROVIDE SHOP

WARRANTY ON FACTORY FINISH. DECOR-FLUSH METAL SOFFIT AND FASCIA SYSTEM

ALUMINIUM WITH HIDDEN FASTENERS, CONTINUOUSLY VENTED AND 20 YEAR

WARRANTY ON FACTORY FINISH. SOFFIT SHALL BE CUSTOM HEAVY GAUGE PAINTED

FASCIA MATERIAL SHALL BE 24 GA. STEEL WITH HIDDEN FASTENERS AND 20 YEAR

SNOW GUARD ABOVE ALL EXTERIOR DOORS. (3 ROWS PER SMACNA STANDARDS).

2020-07-02T13:51:30-0500
RAFAEL CRAME
2020-07-09T14:54:41-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .