About this file

This solicitation requests offers for construction services to establish NAVAIDS facilities serving an extended runway at Chicago O'Hare International Airport. Offerors must provide all labor, supervision, materials, and equipment to complete the project, with an estimated price range of $5 million to $10 million and a performance period of 605 calendar days starting November 15, 2020. Interested firms must demonstrate experience on similar airport projects and provide references, schedules, financial statements, insurance documentation, and small business subcontracting plans as required. Offers are due by October 7, 2020 and must be emailed to the contact specified. The Federal Aviation Administration is the contracting agency overseeing this project.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-e .d g n

/2

/2

:1

:1

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

UNIT 15

(C-8A) (C-7)

UNIT 14

UNIT 4 (C-2)

(C-6)

UNIT 13

UTILITY

POWER

SUBSTATION

SENSORS

ENVIRONMENTAL

MDT

UNIT 5(C-3)

A-23(REG)

UNIT 12 (C-5)

UNIT 3 (C-1) UNIT 6 (C-4)

UNIT 10 UNIT 10

LOOP 1 THRU LOOP 5

LIGHTING FIELD

STA. 0+00 THRU 24+00

STA. 10+00 THRU 24+00

UNIT 9UNIT 9

UNIT 8

UNIT 11

UNIT 8

UNIT 11

UNIT 16

INTERFACE

TESTER

FLASHER

REGULATOR SUBSTATION

TO UNIT 16

INTERFACE

RS-232 TERMINAL

NOTE 2

MPS

ENGINE GENERATOR

A-23(E/G)

CODEX

MODEM

(EXIST.)

CODEX

MODEM

(NEW)

TO TERMINAL CONTROL

COMPUTER COMPLEX/

REMOTE CONTROL PANEL

NO. 2 (OPTIONAL)

POWER

SEE NOTE 1

(CAB)

UNIT 1

(EQUIPMENT ROOM)

UNIT 2

NOTE 3

(C-9)

MODEM

CODEX

(C-11)

UPS

SENSORS

ENVIRONMENTAL

SENSORS

ON/OFF

(C-8)

UNIT 15

FROM UNIT D-20

ITEMS APPLY

ONLY CLOUDED

REMOTE CONTROL PANEL

REMOTE ELECTRONICS CHASSIS

SUBSTATION CONTROL & MONITOR ASSEMBLY

480 VAC INPUT CABINET

CONSTANT CURRENT REGULATOR (QTY 5/SYSTEM)

HIGH VOLTAGE OUTPUT CABINET

INDIVIDUAL CONTROL CABINET

FLASHER LIGHT ASSEMBLY

PAR-56 LAMPHOLDER

JUNCTION BOX

REMOTE MONITORING SUBSYSTEM

50 KVA TRANSFORMER

DISTRIBUTION PANEL

UNIT 14/C-7

UNIT 13/C-6

UNIT 12/C-5

UNIT 11

UNIT 10

UNIT 9

UNIT 8

UNIT 6/C-4

UNIT 5/C-3

UNIT 4/C-2

UNIT 3/C-1

UNIT 2

UNIT 1 UNIT 15/C-8

UNIT 16

UNIT 15A/C-8A

TCCC

MDT

MPS

UPS/C-11

A-23(E/G)

A-23(REG)

C-9

C-14

INPUT SURGE ASSEMBLY

SAFETY DISCONNECT SWITCH

MAINTENANCE DATA TERMINAL

FLASHER TESTER

TERMINAL CONTROL COMPUTER COMPLEX

MAINTENANCE PROCESSOR SUBSYSTEM

UNINTERRUPTABLE POWER SUPPLY

TERMINAL BOX, ENGINE GENERATOR

TERMINAL BOX, REGULATOR SUBSTATION

CODEX MODEM

DISCONNECT SWITCH

LOCALIZER ROOM DISTRIBUTION PANEL

NOTES:

LEGEND:

AT THE SHELTER.

INSTALLED BY THE FAA CONTRACTOR FOR THE ALSF EQUIPMENT

4. ALL INTERCONNECTING CONDUITS, GROUNDS, ETC. ARE FURNISHED &

3. ALL EQUIPMENT IN ATCT TO BE INSTALLED BY FAA.

SEE FOTS DRAWINGS.

2. CONNECTIONS FROM A-23 (REG) TO UNIT 1 AND UNIT 2.

REQUIREMENTS OF FAA-STD-019E.

PROTECTION AT BOTH ENDS SHALL BE PROVIDED THAT MEETS THE

1. WHEN UNIT 1 IS LOCATED MORE THAN 50 FEET FROM UNIT 2, TRANSIENT

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-E009

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

ALSF-2 - RUNWAY 9R

SYSTEM BLOCK DIAGRAM

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -a ls r-e .d g n

2020-07-02T13:41:53-0500
RAFAEL CRAME
2020-07-09T14:23:24-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .