Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf

PDF 13 KB Posted

Attached to
Establishment of the NAVAIDS Facilities Serving Extended Runway 9R-27L at O'Hare International Airport, Chicago, Illinois
Solicitation number
697DCK-20-R-00436
Issued by

About this file

This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract clauses, drawings, and specifications within a performance time of 605 calendar days starting November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate experience completing similar projects both in dollar amount and airport scope of work. Offers are due by October 7, 2020 to the Federal Aviation Administration Southwestern Region. The solicitation requires documentation of financial capability, insurance coverage, bonding, and small business subcontracting plans to be considered for evaluation and award.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CHICAGO

DEPARTMENT OF ENVIRONMENT

UNDERGROUND STORAGE TANK UNIT

30 N. LASALLE STREET, 25th FLOOR

CHICAGO, IL 60602

REQUIRED CHECKLIST FOR UNDERGROUND STORAGE TANK INSTALLATION

UST installations shall follow 41 Ill Adm Code Part 170 and any referenced material. The following checklist shall be followed as prescribed by the Department of Environment's regulations. These requirements do not exempt anyone from other State or Federal requirements or regulations. Underground Storage Tank or UST includes underground pipes and cathodic protection connected thereto.

_______A. Secure proper permitting and required notices of installation to the DOE. 170.105

_______B. Conduct on-site inspection to ensure accuracy of approved blue prints, drawings and actual equipment being installed. 170.105

_______C. Equipment with sufficient lifting capacity shall be used to unload and place USTs into the tank excavation. Tanks shall not be rolled, dropped or dragged. API 1615 3.4.1

_______D. Upon delivery, at installation site, tanks and piping shall be inspected to detect any evidence of damage to coating or structure. API 1615 3.4.1

_______E. Upon discovery of any damage to tanks or piping, repairs shall be in accordance with the manufacturer's instructions and/or supervision. API 1615 3.5.1.2

_______F. Prepare excavations to ensure safe movement of equipment and materials. Excavations shall provide adequate space of the installation of tanks, piping and ancillary equipment. Special attention shall be given to sloping or shoring the sides of the excavation to make them stable. API 1615 5.1.2

S T O P ! ! !

DOE Tank Specialist must witness ALL testing of USTs before installation, the placement of USTs and all backfilling operations around the USTs. 425 ILCS 25/9

_______G. To prevent flotation of USTs, as a result of high water table or flooding, approved anchorage methods and/or ballasting shall be installed. API 1615 6.2 - 6.4

_______H. Pipe trenches shall meet manufacturer's specifications and API 1616. Section 10.3.1, for depth, width, slope, spacing and placement of pipe within. 170.420(e)(5) API 1615 10.3.1

_______I. Pipe installation shall meet manufacturer's specifications and API 1615 Section 9.3 and 9.4. Joint adhesive and thread sealant shall meet manufacturer's requirements for petroleum products and/or gasoline - ethanol and gasoline -methanol blends. API 1615 9.3 - 9.4

_______J. Electrical conduit shall be routed away from product piping, and shall not be installed in the same trenches as product piping. PEI 100 section 11.1

S T O P ! ! !

DOE Tank Specialist must witness air test of pipe installation and backfilling of pipe trenches. 425 ILCS 25/9

_______K. Wiring of electrical pumps and all electrical equipment in connection therewith shall conform to Chapter 5 of the 1981 Edition of the National Electrical Code, NFPA #70. 170.90(a)(d)

_______L. Tank owner must file the Notification of Underground Storage Tank form within 30 days after completed installation.

170.440(a)

_______M. Contractor must file a completed manufacturer's installation checklist for USTs and piping, along with the completed installation affidavit, within 30 days after completed installation. 170.420(e)(5)