ord-d-gs27l-c005.pdf
PDF 316 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract documents. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested offerors must have successfully completed similar projects in both dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020 and must include details on past experience, financial capability, insurance, bonding, and small business subcontracting plans. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -g s l-c .d g n
/2
/2
:2
:2
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
SEE NOTE 11
SJO CORD
3/C 14 AWG
GROUNDING CONDUCTOR
12 AWG GREEN THWN
SEE NOTE 11
SJO CORD
3/C 14 AWG
NEUT
GND
GND
120V LINE 2
120V LINE 1
IN 1" GRS
12 AWG THWN
120V LINE 2
120V LINE 1YELLOW
YELLOW
240V
240V
240V
LIGHTS
120V OBSTRUCTION
HEATERS
240V ANTENNA
OR EQUAL
SERIES NO. 860-1R01-002
LIGHT, DIALIGHT 860
DUAL L.E.D. OBSTRUCTION
ASSEMBLY 14 AWG 3/C SJO
ANTENNA HEATER CABLE
COUPLING (TYPICAL)
1" GRS CONDUIT
ASSEMBLY 14 AWG 3/C SJO
ANTENNA HEATER CABLE
ASSEMBLY 14 AWG 3/C SJO
ANTENNA HEATER CABLE
SEE NOTE 6.
CONNECTOR HUB.
2 1/2" WATER-TIGHT
CONDUIT 45° EL
2 1/2" PVC
COUPLING (TYPICAL)
2 1/2" PVC CONDUIT
(TYPICAL)
2 1/2" PVC CONDUIT
TOP OF CONCRETE FOUNDATION
CONDUIT EXTENDS 6’-0" ABOVE
SURFACE
CONCRETE FOUNDATION
DOWN CONDUCTOR
THOMPSON NO. 32
GROUND WIRE
2 AWG BARE COPPER
DOWN CONDUCTOR
THOMPSON NO. 32
PVC CONDUIT
1" GRS OR 2 1/2"
HEX NUT
W/ GALVANIZED
MACHINE SCREW
1/4"-20 2 1/2"
HANGER (1" OR 2 1/2")
GALVANIZED CONDUIT
HEX NUT
W/ GALVANIZED
MACHINE SCREW
1/4"-20 2 1/2"
CONDUIT HANGER
1/2" GALVANIZED
NUT, 1/4"-20
GALVANIZED HEX
LOCK WASHER AND
SCREW W/FLAT AND
1/4"-20 2 1/2" MACHINE
RELIEF BUSHING
RAIN-TIGHT STRESS
TO ANTENNA
FOR CONNECTION
CIRCUIT, LEAVE 12’ COIL
TO ANTENNA HEATER
SPLICE 3/C 14 AWG SJO
NUT (TYPICAL OF 2 PER BOLT)
"-9 STAINLESS STEEL HEX 7/8
" STAINLESS STEEL LOCK WASHER7/8
GROUND ROD
STAINLESS
" X 10’ 3/4
12 AWG THWN
1" GRS CONDULET TEE
1" GRS CONDULET TEE
1" GRS CONDULET TEE
12 AWG BLK THWN
1" GRS CONDULET TEE
CONCRETE FOUNDATION
50’ ANTENNA TOWER LEG
24" AIR TERMINAL. SEE NOTE 8.
TO THRESHOLD
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
1" GRS CONDUIT (TYPICAL)
1" GRS CONDUIT 45° EL
1" GRS CONDUIT 45° EL
SEE NOTE 7
1" GRS CONDUIT
TOWER LEG
DOWN CONDUCTOR, THOMPSON NO. 32
NOT TO SCALE
1" GRS CONDULET TEE
CL
ANTENNA TOWER LIGHTNING PROTECTION
ANTENNA HEATER AND OBSTRUCTION LIGHT WIRING
DETAIL
NOT TO SCALE
SLOPE SHELTER
ON OUTSIDE WALL OF GLIDE
JUNCTION BOX MOUNTED
RF & CONTROL INTERFACE
2 1/2" PVC CONDUIT TO
SHELTER.
OF GLIDE SLOPE EQUIPMENT
MOUNTED ON OUTSIDE WALL
INTERFACE JUNCTION BOX
1" GRS CONDUIT TO POWER
NOT TO SCALE
ANTENNA TOWER BRACE
DETAIL DETAIL
DETAIL
TYP CONDUIT MOUNTING
DETAIL
DETAIL
ANTENNA TOWER GROUNDING
DETAIL
CL
(NOTE 13)
1" GRS CONDULET TEE
(NOTE 13)
1" GRS CONDULET TEE
(NOTE 13)
1" GRS CONDULET TEE
CONDUIT
1" SCH 80 PVC
CONDUIT
1" SCH 80 PVC
PER NOTE 13.
2 1/2" PVC CONDULET
TEE PER NOTE 13.
2 1/2" PVC CONDULET
TEE PER NOTE 13.
2 1/2" PVC CONDULET
SEE NOTE 4
TOWER GROUND ASSEMBLY.
SEE NOTE 7
GROUND ROD.
STAINLESS
3/4" X 10’
12" SWEEP RADIUS MIN
1" PVC CONDUIT, 45 33/64 EL,
CONDUCTOR. SEE NOTE 4
2 AWG BARE GROUNDING
SEE NOTES 9, 10 & 14.
7/8"-9 x 18" ANCHOR BOLT.
SEE NOTES 9, 10 AND 14
7/8"-9 x 18" ANCHOR BOLT
SEE NOTE 8
DOWN CONDUCTOR.
THOMPSON NO. 32
BLACK
WHITE
SHELTER PER SHEET GLD-GS27L-E-604
CONTINUES AROUND GLIDE SLOPE
COUNTERPOISE 30" BELOW GRADE.
4/0 AWG BARE COPPER GROUNDING
ORD-D-GS27L-C005-1. NOTE 12.
SHEET GLD-GS27L-E-601
RAIL PER DETAILS "3" AND "4",
GALVANIZED SAFETY CLIMB
DETAIL
PART NO. 24619
CAT. NO. LCD-8
TECHNOLOGY, INC.
ENVIRONMENTAL
CONTROLLER,
AUTOMATIC DEICING
DETAIL "1".
LIGHT. SEE
OBSTRUCTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
14.
13.
12.
01’ 1’ 2’
SCALE: 1" = 1’-0"
CONTRACTOR SHALL ENSURE AT LEAST 2 THREADS ARE EXPOSED ABOVE NUT WHEN COMPLETE.
THE TEE OF EACH CONDULET SHALL BE ORIENTED PARALLEL TO THE ANTENNA FACE.
TO CENTER OF ANTENNA MAST.
INSTALL CLIMBING LADDER CLOSE TO REAR LEG OF ANTENNA MAST. THIS WILL ALLOW ACCESS
CONTRACTOR SHALL SUBMIT CATALOG CUT OF PROPOSED SJO CORD FOR APPROVAL.
ALL THREADED ENDS SHALL HAVE AN ANIT-SEIZE COMPOUND APPLIED TO IT.
REFER TO GOVERNMENT-FURNISHED PROPERTY LIST (GFPL) FOR ITEMS FURNISHED BY THE FAA.
THE TOWER USING THOMPSON CLAMPS @ 3’ O.C. MAX. DOWN CONDUCTORS SHALL TERMINATE AT SEPARATE GROUNDING RODS. SEE NOTE 7.
LONG AIR TERMINAL, THOMPSON NO. 572, AND THOMPSON NO. 32 DOWN CONDUCTOR ON THE OUTSIDE OF TWO TOWER LEGS, SECURED TO
ANTENNA TOWER LIGHTNING PROTECTION SHALL BE INSTALLED PER THE REQUIREMENTS OF NFPA 78. CONTRACTOR SHALL INSTALL A 24"
ALL CONNECTIONS TO GROUNDING RODS SHALL BE MADE USING EXOTHERMIC WELDS PER SPECIFICATIONS.
4" FROM THE BACK.
THE CONDUIT SHALL ENTER THE TOP OF THE RF AND CONTROL INTERFACE JUNCTION BOX AS CLOSE TO THE SIDE AS POSSIBLE, CENTERED
ANTENNA RF CABLES WILL BE FURNISHED AND INSTALLED BY FAA INSTALLATION PERSONNEL.
ASSEMBLY, ANOTHER LEG AND THE ANTENNA TOWER. SEE NOTE 7.
2 AWG BARE COPPER WIRE #REPLACED WITH A 2 AWG BARE COPPER WIRE. THE CONTRACTOR MUST FURNISH AND INSTALL A SECOND
TOWER GROUND ASSEMBLY IS PROVIDED WITH A 6 AWG BARE COPPER WIRE ATTACHED. THE 6 AWG BARE COPPER SHALL BE REMOVED AND
CONDUIT.
EACH CONDULET SHALL BE ORIENTED TOWARD THE ANTENNA. INSTALL REDUCING BUSHINGS IN THE TEE TO FACILITATE INSTALLATION OF A 1"
INSTALLED ON THE 2 1/2" PVC CONDUIT FOR EACH GLIDE SLOPE ANTENNA, CENTERED AT THE ANTENNA’S HEIGHT ABOVE GRADE. THE TEE OF
1" RIGID GALVANIZED STEEL CONDUIT AND 2 1/2" PVC CONDUIT SHALL BE INSTALLED PER DETAIL "6". A 2 1/2" PVC CONDULET SHALL BE
CONDUITS SHALL BE CLAMPED TO ANTENNA TOWER STRUCTURAL MEMBERS ON TOWER FACE OPPOSITE FACE WITH LADDER AT 5’-0" O.C. MAX.
THE OBSTRUCTION LIGHT SHALL BE OPERATIONAL BEFORE DUSK OF THE FIRST DAY THAT THE ANTENNA TOWER IS ERECTED.
NOTES:
SHEET ORD-D-GS27L-C005-1
ATTACH PER DETAIL "6",
GALVANIZED STEEL LADDER
EQUIPMENT SHELTER. (NEMA 4X)
WALL OF GLIDE SLOPE
BOX MOUNTED ON OUTSIDE
POWER INTERFACE JUNCTION
NOT TO SCALE
HEATER
ANTENNA
GLIDE SLOPE
INTERMATIC TIMER CNTL
LOAD 1 (N.O.) LINE 1
LOAD 2 (N.C.) LINE 2
PANEL
POWER
LI
L2
GND
CNTL
HEATER
LCD-8
Y Y BLKWHT
"LINE 2 TO LOAD 2" IS CLOSED WHEN TIMER IS OFF
"LINE 1 TO LOAD 1" IS CLOSED DURING TIMER OPERATION
NOTE:
A
B
C
SLOPE SHELTER (NEMA 4X)
ON OUTSIDE WALL OF GLIDE
JUNCTION BOX MOUNTED
RF & CONTROL INTERFACE
ANTENNA HEATER TIMER CIRCUIT
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-GS27L-C005
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
GS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -g s l-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
GLIDE SLOPE - RUNWAY 27L
ANTENNA MAST DETAILS
LKN
| 2020-07-06T09:32:47-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:21:10-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .