This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with contract clauses, drawings, and specifications for an estimated price between $5 million and $10 million. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. Interested firms must have successfully completed similar airport projects and must submit their offer by October 7, 2020 including past performance references, a construction schedule, financial documents, insurance certificates, and a small business subcontracting plan. The solicitation is issued by the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-e -1 .d g n

/2

/2

:2

:2

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

B

A

1 3

DEMARC BOX, A-23E

E/G CONTROL CABLE

VIA A-23E AND A-23R

TO FIBER OPTIC CHANNEL BANK

SENSOR

INSIDE TEMP

INTRUSION SWITCH

DOUBLE DOOR

E/G ROOM

(ON E/G SET)

SOLENOID

EMERGENCY

480V LUGS

NORMAL

480V LUGS

POWER SENSOR

COMMERCIAL

POWER SENSOR

ENG/GEN

(TRANSFER SWITCH)

CONTACTS

AUXILIARY

NORMAL

CLOSED ON

EMERGENCY

CLOSED ON

NORMAL

CLOSED ON

CONTROL BOARD)

MUST BE PROGRAMMED INTO THE

(THE INPUTS AND OUTPUTS BELOW

MPAC 1500 CONTROL BOARD

(OUTPUT)

COMMERIAL AVAILABLE

(OUTPUT)

E/G RUNNING

(INPUT)

PEAK SHAVE (START E/G)

(+24 VDC)

CONTROL(+)

UNIT A1

TOWER

SW1

LOCAL

E1

FSK UNIT

DIGITAL TO

RV2

REIA

E/G

TBF

P/O

TBF

P/O

TB1

TB2

REIA

+24VDC

BATTERY

BATTERY

TO A-23R.

ASSEMBLY (REIA), E/G

NBP REMOTE EQUIPMENT INTERFACE

A B C A B C

2A 2A 2A 2A 2A 2A

EA EB EC NA NB NC

TB1

SELECT E/G

K1 (LATCHING)

SELECT COM

GND

START/STOP E/G

GROUND

E/G RUNNING (AVAIL)

COML AVAIL

E/G ON-LN

COML ON-LN

ENV ENG ON+

ENV ENG ON-

ENV COM PWR ON+

ENV COM PWR ON-

XFR SW RLY1

XFR SW RLY2

ENGGEN HI

ENGGEN LO

ENV ALRM +10V EG

ENV ALRM EG

ENV INTEMP +10V EG

ENV INTEMP EG

REIA RV2-1

REIA RV2-2

E/G START

E/G START

SITE TELEPHONE

SITE TELEPHONE

ENV SMK ALM +12V

ENV SMK ALM ENV SMK ALM

ENV SMK ALM +12V

ENV INTEMP +10V EG

ENV INTEMP EG

ENV ALRM EG

ENV ALRM +10V EG

ENGGEN LO

ENGGEN HI

XFR SW RLY2

XFR SW RLY1

ENV COM PWR ON-

ENV COM PWR ON+

ENV ENG ON-

ENV ENG ON+

INPUT (+12VDC)

DS1

JAN4148

+10VDC

4X4 J-BOX

EOL RES

499 OHMS

NO

C

ENV SMK +10V EG ENV SMK +10V EG

ENV SMK EG ENV SMK EG

INTERNAL

RELAY

EOL RES

499 OHMS

EOL RELAY

BLACK

RED

AUX

AUX

GND

(CONNECTIONS BY FAA)

ON BOTH ENDS)

(LABEL ALL WIRES

14 AWG, STRANDED

8-1/C, 600V INSULATED

(CONNECTIONS BY FAA)

ON BOTH ENDS)

(LABEL ALL WIRES

14 AWG, STRANDED

8-1/C, 600V INSULATED

(BY FAA)

P/N BM6033PQ

NEXT TO SENSORS

INSIDE ATS CABINET

MOUNT FUSE BLOCK

(BY FAA)

INSIDE ATS CABINET

MOUNT SENSORS

ON E013

SEE NOTES 2 AND 3,

CONTROL DEMARC BOX, A-23R,

REGULATOR SUBSTATION

10 PR 22 AWG, FROM

#22 AWG

2 - 1 PAIR

SEE NOTES ON, SHEET E013

(FOR FUTURE USE).

12 PAIR, 22 AWG,

(CONNECTION BY FAA)

9302 #BELDEN

2 PAIR, 22 AWG

P/O ONE

22 AWG#

1 - 2 PAIR

ON BOTH ENDS)

(LABEL ALL WIRES

14 AWG, STRANDED#

8-1/C 600V INSULATED

COML ON-LN

4 #INPUT

E/G ON-LN

3#INPUT

E/G RUNNING

1#INPUT

COML AVAIL

2#INPUT

SELECT COM

2#OUTPUT

SELECT E/G

1#OUTPUT

SMOKE DETECTOR

PHOTO

E/G TRANSFER SWITCH, KOHLER MODEL KB5-DMWA-0400B

1.

2.

ETC. TO ALLOW FOR INSTALLATION.

CONTRACTOR TO PREPARE AND INSTALL PIPING,

PHOTO SMOKE DETECTOR MOUNTED BY OTHERS.

POWER IS NEVER PARALLELED BY E/G POWER.

CONTRACTOR MUST ENSURE THAT COMED

NOTES:

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

ALSF-2 RUNWAY 9R

INTERCONNECT SCHEMATIC DIAGRAM

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

ORD-D-ALS09R-E013-1

o rd -d -a ls r-e -1 .d g n

2020-07-02T13:48:02-0500
RAFAEL CRAME
2020-07-09T14:43:10-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .