About this file

This document outlines a federal contract opportunity for construction services to establish NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with contract documents, drawings, and specifications. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 and $10 million. Interested firms must demonstrate experience completing similar airport projects. Offers are due by October 7, 2020. Respondents must include details on past performance, schedule, insurance, bonding, and small business subcontracting in their submission, along with a bid bond and customer satisfaction surveys. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ld r-g .d g n

/2

/2

:5

:3

A

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

TRENCH BACKFILL

EXTERNAL BARREL

B A

C K

F

IL

L

SEWER PIPE

GROUND LINE

UNDISTURBED

USE TRENCH BACKFILL

STRUCTURE IN WHICH CASE

PAVEMENT, SHOULDER, OR

ANY EXISTING OR PROPOSED

UNDER OR WITHIN 2 FEET OF

USE ACCEPTABLE FILL UNLESS

WHERE REQUIRED

WITH GEOTEXTILE FABRIC

UNDERCUT AND BACKFILL (CA-1)

CONFORMING TO CA-16 GRADATION

IN WHICH CASE USE PEA GRAVEL

UNLESS CATHODICALLY PROTECTED,

BEDDING MATERIAL CA-7 OR CA-11

1.

NOTES:

2.

3.

4.

NOT TO SCALE

BEDDING FOR PIPES AND SUBDRAINS

BEYOND OPENING, PLACE OVER GEOTEXTILE.

PROVIDE CA-3 OR RIP-RAP STONE TO EXTEND MINIMUM 10’-0"

PROVIDE STEEL GRATING OVER BOTH ENDS FOR RODENT CONTROL.

OTHERWISE SHOWN.

ALL DIMENSIONS ARE IN INCHES (MILLIMETERS) UNLESS

DISPLACEMENT TO UNITS OF HORIZONTAL DISPLACEMENT (V:H)

ALL SLOPE RATIOS ARE EXPRESSED AS UNITS OF VERTICAL

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

07/24/2019 1898272

ORD-D-ALD09R-G014

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALD

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ld r-g .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

RUNWAY 9R-27L NAVAIDS

CULVERT DETAILS

RC

2020-07-02T13:21:17-0500
RAFAEL CRAME
2020-07-09T12:29:02-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .