ord-d-loc09r-c003.pdf
PDF 442 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This document provides details for a federal solicitation seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The solicitation requests offers for project labor, supervision, materials and equipment to install NAVAIDS serving extended Runway 9R-27L in accordance with contract drawings and specifications. Offerors must be able to complete the 605-day project with an estimated price between $5 million to $10 million and have experience with similar airport projects. Responses are due by October 7, 2020. Interested parties must include relevant documents demonstrating insurance coverage, bonding capacity, past performance and a small business subcontracting plan. The selected contractor will work with the Department of Transportation Federal Aviation Administration Southwestern Region on this project.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -l o c r-c .d g n
/2
/2
:1
:1
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
52 48
11 8
23 21
68-1
68-5
68-6
525446
52 54
49 42
68-2
68-8
52 4654
68-7
54 5256
(MONITOR "J1")
(FEED "J2")
ELBOW
SWEEPING
COUPLING
CONDUIT
(NOTE 3)
ADAPTER
LOCKNUT
68-12
68-7
68-8
68-12
465452
68-14
68-10
68-9 or
68-4
68-11
68-3
68-13 10525446
56 54 52
68-5
68-6
49 42
52 54 56
29 25
47 9
52 48
EACH END
EACH END
EACH END
EACH END
EACH END
EACH END
or
SEE NOTE 7
(SEE NOTE 4)
or
(DETAIL B)
(DETAIL C)
(DETAIL A)
UNIT ASSY
DISTRIBUTION
SEE NOTE 5
LOCKNUT
(NOTE 3)
ADAPTER
CONDUIT
COUPLING
SWEEPING ELBOW
BUSHING
GROUNDING
BUSHING
GROUNDING
SEE NOTE 12
TYPICAL EACH END
& OBSTRUCTION LIGHT DETAIL
ANTENNA ARRAY SUPPORT
DETAIL "B"
RACEWAY ADAPTER DETAIL
DETAIL "C"
DISTRIBUTION UNIT ASSY
DETAIL "A"
6, 600 V GREEN GROUND#1
6 AWG#4
19 #1-12 PR
HELIAX
(4) 5/8"
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
COVERS.
PIECES) OR ON ANY PART OF THE THE LONG RACEWAY
INSTALL ON THE TOP PART OF THE RACEWAY (SHORT OF LONG
OF THE SHORT SECTIONS OF RACEWAY COVER. DO NOT
SPEED CLIPS, ITEM 21, SHALL ONLY BE INSTALLED ON THE FACE
SEE EQUIPMENT SCHEDULE SHT. ORD-D-LOC09C-C005.
LIFT/SUPPORT RACEWAY BEFORE TIGHTENING THIS HARDWARE.
IS FOR ALIGNMENT.
INSTALL HARDWARE IN THE 2 OUTER HOLES ONLY, CENTER HOLE
ENDS OF AUDIO CABLES.
INSULATED SLEEVING (ITEM 24) USED TO DRESS UNFINISHED
REFERENCE.
LPD ANTENNA ELEMENT (PN 448112-0001). SHOWN FOR
WITH 68-x (x=IS FIND NUMBER IN KIT).
RACEWAY KIT (ITEM 68) ITEMS ARE DENOTED BY BALLOONS
SHOWN FOR REFERENCE.
DISTRIBUTION UNIT AND ASSOCIATED CONDUITS AND CABLES ARE
USE OR DISCARD AS REQUIRED.
FURNISH 5 EACH, 120V LAMPS (ITEM 17) FOR 120V OPERATION,
EXPANDING FOAM.
ALSO, SEAL EACH CABLE CONDUIT END WITH, LOCALLY ACQUIRED,
CONDUIT USING, LOCALLY ACQUIRED, PVC JOINTING ADHESIVE.
AFTER FINAL ADJUSTMENTS GLUE CONDUIT ADAPTERS ON
REAR ANTENNA MAST (ITEM 25).
DISTRIBUTION UNIT THRU CABLE RACEWAY AND TO ANTENNA VIA
RF FEED AND MONITOR CABLES ARE ROUTED FROM
BOLT CONNECTOR (ITEM 28) INSIDE CABLE RACEWAY.
6 BARE COPPER (ITEM 22) MADE WITH SPLIT#CONNECTION TO
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-LOC09R-C003
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
LOC
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -l o c r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LOCALIZER - RUNWAY 9R
INSTALLATION DETAILS
20 ELEMENT ANTENNA ARRAY
| 2020-07-06T09:38:37-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:27:54-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .