ord-d-gs09r-c004.pdf
PDF 308 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This document includes a federal contract opportunity solicitation for construction services to establish NAVAIDS facilities serving an extended runway at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with contract clauses, drawings, and specifications within a 605 calendar day performance period starting November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate successful completion of similar airport projects both in dollar amount and scope of work. Offers must be submitted by October 7, 2020 and include documentation of past performance, financial capability, insurance coverage, bonding capacity, and a small business subcontracting plan. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -g s r-c .d g n
/2
/2
:4
:2
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A01 1 2
SCALE IN FEET
L
1’ -6 1/8" 7 11/16" 2’ -7 3/16"
2’ -4 1/2"
1’ -7 1/2" 4’ -9" 1’ -7 1/2"
1" PVC CONDUIT (TYP)
2" 0 2" 4"
SCALE: 6" = 1’-0"
1 29/32"
3 13/16"
CENTER OF TOWER LEG
3" 0 3" 9"6"
SCALE: 3" = 1’-0"
1" HOLE (TYPICAL)
EXISTING GRADE
ENDS (TYPICAL)
THREADS AT BOTH
ANCHOR BOLTS WITH
GALVANIZED STEEL
7/8" x 24" LONG
INSTALL
WASHERS (TYPICAL)
HEX NUTS AND
7/8" GALVANIZED
INSTALL
PER DETAIL "4".
GALVANIZED STEEL PLATE
7" SQUARE, 3/8" THICK
INSTALL
STEEL PLATE
3/8" THICK GALVANIZED
BB
CONCRETE PIER FOUNDATION DETAIL
PLAN
DETAIL (FAA FURNISHED)
ANCHOR BOLT PLATE
NOT TO SCALE
PAVED PLOT AND ACCESS ROAD DETAIL
TYPICAL SECTION FOR ASPHALT
NOT TO SCALE
PIER REINFORCING DETAIL
PLAN
B
SECTION
ELEVATION
WITH TOP OF FOUNDATION
TOP OF SURFACING SHALL BE FLUSH
1’-7 1/2"
C L
AND FOUNDATION C
ANTENNA TOWER
ANCHOR BOLT ASSEMBLY PER DETAIL "3"
3/4" CHAMFER ALL AROUND
DETAIL "3" AND DETAIL "4"
ANCHOR BOLT ASSEMBLY PER
TO RUNWAY CENTERLINE
THIS LINE SHALL BE PARALLEL
1" PVC
CONDUIT (TYP)
8’-0"
120°
0°
FOUNDATION
TOP OF CONCRETE
TOWER LEG
7"
" 6" CRUSHED AGGREGATE
WITHIN 5" FROM T/FDN.)
(3 PER SET - 2 SETS
4 TIES#
SPACED ALL AROUND
8 REBAR EQUALLY #20 -
4 TIES, 10" O.C. PER DETAIL "2"#
8 (TYP)#
6 T&B EACH WAY#8-
AND PLATE DETAIL
ANCHOR BOLT
GEOTEXTILE
1 1/2" ASPHALT (FINISH)
2 1/2" ASPHALT (BASE)
AND 1 1/2" COMPACTED DEPTH FINISH COURSE.
PLACE 2 1/2" COMPACTED DEPTH BASE COURSE
TO 6" COMPACTED DEPTH PER SPECIFICATIONS.
PLACE GEOTEXTILE FABRIC, AND CRUSHED ROCK
REMOVE TOPSOIL, COMPACT THE SUBGRADE,
NOTES:
1.
2.
TEMPLATE WITH REFERENCE TO TOWER BASE PRIOR TO PLACING CONCRETE.
FOR GLIDE SLOPE ANTENNA MAST ANCHOR BOLTS ARE +/-1/16" OF DIMENSIONS SHOWN. VERIFY ANCHOR BOLT
SEE GLIDE SLOPE SITE PLAN FOR FOUNDATION LOCATION AND TOP ELEVATION. HORIZONTAL TOLERANCES
OPTIMUM DENSITY.
SHAPED PER OSHA REQUIREMENTS. FOOTING SHALL REST ON UNDISTURBED SOIL OR SOIL COMPACTED TO 95%
SEE THE SPECIFICATIONS FOR EXCAVATION AND BACKFILL REQUIREMENTS. EXCAVATION SHALL BE SHORED OR
3. CONCRETE DESIGN, MATERIAL, AND WORKMANSHIP SHALL CONFORM TO THE DESIGN DRAWINGS.
4.
CURING REQUIREMENTS.
FINISHED. SEE THE SPECIFICATIONS FOR CONCRETE FORM WORK, REINFORCEMENT, MATERIAL, PLACEMENT, AND
COMPRESSIVE STRENGTH OF 3000 PSI AFTER 28 DAYS. FOUNDATION TOP SHALL BE LEVEL +/-1/8" AND BROOM
CONCRETE SHALL HAVE A MAXIMUM SLUMP OF 3", 3/4" MAXIMUM AGGREGATE SIZE, AND SHALL ATTAIN A MINIMUM
5. REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615, GRADE 60 (60 KSI YIELD).
6.
AND A FROST DEPTH OF 42".
FOUNDATION IS BASED UPON A DESIGN WIND SPEED OF 90 MPH, A MINIMUM SOIL BEARING CAPACITY OF 3000 PSF, 7.
8.
IN TURNOVER BINDERS.
THE CONTRACTOR SHALL PROVIDE A SURVEY OF THE LOCATION, ELEVATIONS AND PLUMBNESS. PROVIDE A SURVEY
TOP NUT AFTER INSTALLATION. ALL EXTERIOR EXPOSED THREADED CONNECTIONS SHALL HAVE ANTI-SEIZE APPLIED.
IN THE PRESENCE OF DISTRICT PERSONNEL. ENSURE THAT A MINIMUM OF TWO TURNS WILL REMAIN ABOVE THE
THE TORUQE VALUE SHOULD BE AND WHAT THE TORQUE VALUE WAS SET TO. TORQUING SHALL BE PERFORMED
TOWER MAST NUTS SHALL BE TORQUED ACCORDINGLY AND DOCUMENTED. DOCUMENTATION SHALL SHOW WHAT
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-GS09R-C004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
GS
GLIDE SLOPE - RUNWAY 9R
ANTENNA TOWER FOUNDATION DETAILS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -g s r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LKN
| 2020-07-02T14:14:02-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:06:35-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .