This request for proposal is for construction services for the establishment of NAVAIDS facilities serving the extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project, including construction of foundations and load bank pads. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar airport construction projects of comparable size and scope. Proposals are due by October 7, 2020 and shall include details on past performance, schedule, financials, insurance, bonding, and subcontracting plans. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls l-c .d g n
/2
/2
:4
:2
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
12-NO. 6 REINFORCEMENT, EQUALLY SPACED, T AND B
7-NO. 6 REINFORCEMENT, EQUALLY SPACED, T AND B
OIL RESISTANT CAULK (TYP)
EXPANSION JOINT FILLED WITH
VAPOR BARRIER
6 MIL PLASTIC
55’-4"8"
3"
CL.
C L
T
Y P
3"
6X6X6/6 WWF
5’-4"6’-0"
NO. 4 @ 12" OC EACH WAY
2 - NO. 5 CONTINUOUSFOAM INSULATION
2" RIGID URETHANE
8"
C L
R
C L
R
12" 6"
12" 6"
9’-0"
LC
OIL RESISTANT CAULK (TYPICAL)
EXPANSION JOINT FILLED WITH
L
T
Y P
3"
CL.
3"
M
IN
4’-2"
7-NO. 6 REINFORCEMENT, EQUALLY SPACED, T AND B
12-NO. 6 REINFORCEMENT, EQUALLY SPACED, T AND B
C L
R
O.C. EACH WAY
NO. 4 BARS @ 12"
"6"
6X6X6/6 WWF WITH TOP OF SLAB
SHALL BE FLUSH
TOP OF STOOP
7’-10" 12’-0"
6X6X6/6 WWF
VAPOR BARRIER
6 MIL PLASTIC
FOAM INSULATION
2" RIGID URETHANE
(EACH FACE)
NO. 4 BENT BARS
C L
R
O.C. EACH WAY
NO. 4 BARS @ 12"
2 - NO. 5 CONTINUOUS
NO. 4 BENT BARS
6"
SECTION
C
GALVANIZED J-BOLT (TYPICAL)
5/8" DIAM. X 6" LONG
6X6X6/6 WWF
REINFORCED WITH
6" CONCRETE SLAB
6"3’-6"6"
"4
C
LOAD BANK OUTLINE
FOR GRADING
SEE CIVIL PLANS
DETAILS
PLANS FOR
GRADE SEE
FINISHED
PROCTOR (ASTM 1557)
COMPACT TO 95% MODIFIED
CRUSHED ROCK CA-6.
12" (MIN.) COMPACTED
LOAD BANK PAD
PLAN
SECTION
SECTION
18"
.0 ’6
11"
4’-6"
AT 12" O.C. (TYPICAL)
NO. 4 L-BARS 2’-0" X 2’-0"
2’-0"
6’-0"
IMPROVEMENT
PROPOSED SURFACE
SEE CIVIL PLANS FOR
5.0%
2’-0"
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
B
A
PER NOTE 7
1/2"x18" J-BOLT
B
D
A
5’-0" 4’-0"
6’-0" 8’-6" 8’-6"
12’-6"10’-0"10’-0"10’-0"9’-0"4’-6"6’-0"6’-0"
68’-0"
4’-6"
PLAN
8"
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
NOTE 7 (TYPICAL)
I-BOLT PER
EXPANSION ANCHOR
STOOP (SEE SECTION A)
6" THICK CONCRETE
RESISTANT CAULK (TYPICAL)
PLACEMENT, FILLED WITH OIL
SAWCUT WITHIN 12 HOURS OF
CONTROL JOINT 1/8"W X 1-1/2"D
STOOP
CONCRETE
6" THICK
SEE SECTION A)
(TYPICAL,
STOOP
CONCRETE
SUPPORT
WING WALL TO
RESISTANT CAULK
FILLED WITH OIL
EXPANSION JOINT
(TYPICAL)
EDGE OF FOOTING
(TYPICAL)
FOUNDATION WALL
INSIDE EDGE OF
SECTION D)
STOOP (SEE
CONCRETE
FINISHED GRADE
CRUSHED ROCK
COMPACTED
6" DEPTH OF
COMPACTED SUBGRADE
COMPACTED FILL ON
GEOTEXTILE FABRIC
IMPROVEMENT
PROPOSED SURFACE
SEE CIVIL PLANS FOR
GEOTEXTILE FABRIC
COMPACTED SUBGRADE
COMPACTED FILL ON
AT 12" O.C. (TYPICAL)
NO. 4 L-BARS 2’-0" X 2’-0"
IMPROVEMENT
PROPOSED SURFACE
SEE CIVIL PLANS FOR
GEOTEXTILE FABRIC
COMPACTED SUBGRADE
COMPACTED FILL ON
MUST BE 3000 PSF MINIMUM
SOIL BEARING CAPACITY
(SEE NOTE 8)
ENTRANCE
CONDUIT
(SEE SECTION A)
STOOP
CONCRETE
TO SUPPORT
WING WALL
N
3"
SEE ORD-D-ALD09R-G027
STOOP (TYPICAL)
TO SUPPORT CONCRETE
6" THICK WING WALL
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS27L-C012
O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls l-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
1.
1.
2.
3.
4.
10 PSFMECHANICAL ALLOWANCE:
30 PSF (COMPONENTS)WIND LOAD:
25 PSF (MWFRS)WIND LOAD:
30 PSFSNOW LOAD:
150 PSFFLOOR LIVE LOAD: fY = 60 KSI (EPOXY COATED)REINFORCEMENT:
f ’C = 3,000 PSI @ 28 DAYSCONCRETE:
5.
NOTES:
2.
3.
4.
5.
6.
7.
8.
DESIGN CRITERIA:
RUNWAY 27L ALSF-2 / 9R LOCALIZER
FOUNDATION PLAN AND SECTIONS
KE
RC
HOUSING.
FILL THE UNUSED PORTION OF CONDUIT PENETRATION AT THE LOAD BANK TO PREVENT RODENT
AROUND PERIMETER.
SECURE DOUBLE SILL PLATE TO FOUNDATION USING 1/2" X 18" J-BOLT ANCHORS 3’ OC MAX
DO NOT REMOVE INSULLATION BEHIND CONDUIT.
CONCRETE SURFACE.
PLACED AGAINST SOIL. ALL OTHER REINFORCEMENT SHALL BE A MINIMUM 1 1/2" CLEAR FROM
REINFORCEMENT SHALL BE A MINIMUM 3" CLEAR FROM CONCRETE SURFACE FOR CONCRETE
FINISH EXPOSED VERTICAL CONCRETE SURFACES WITH SELF LEVELING TOPING FOR EXTERNAL USE.
POLYETHYLENE VAPOR BARRIER.
INTERIOR FLOOR SLAB SHALL BE 6" THICK, REINFORCED WITH 6X6X6/6 WWF OVER A .006"
SEE SUBSTATION SITE PLAN FOR TOP OF FOUNDATION ELEVATION.
OR SHAPED PER OSHA REQUIREMENTS.
SPECIFICATIONS FOR EXCAVATION AND BACKFILL REQUIREMENTS. EXCAVATION SHALL BE SHORED
EXCAVATED MATERIAL AROUND FOUNDATION. REFER TO SECTION P-152 AND P-157 OF THE
AND PLACE CRUSHED ROCK ON THE INSIDE OF THE FOUNDATION WALLS. BACKFILL AND COMPACT
FORMWORK FROM FOUNDATION WALLS. AFTER FORMWORK IS REMOVED, INSTALL RIGID INSULATION
CONTRACTOR SHALL ALLOW CONCRETE TO CURE FOR AT LEAST 48 HOURS PRIOR TO REMOVING