This solicitation requests offers for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. Offerors must provide all labor, supervision, materials, and equipment to perform the project in accordance with contract documents, drawings, and specifications. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is $5 million to $10 million. Offerors must have experience with similar projects of comparable size and complexity at operational airports. Offers are due by October 7, 2020 and should be emailed to the contact at the Federal Aviation Administration listed.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-e .d g n

/2

/2

:1

:2

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

SEE NOTE 1

SHUNT TRIP

MAIN CIRCUIT BREAKER

TERMINALS

SOURCE

EMERGENCY

EB

EN

X1 X2

CT1

CT2

CT3

RELAY

LOAD

L0

L1

L2

L3

N

X1

X2

SWITCH, D-2

TRANSFER

AUTOMATIC ENGINE/GENERATOR, D-1

SEE ORD-D-ALS09R-E010

TO LOAD BANK

GEN.

LINE CIRCUIT BREAKER NO. 2 (TO LOAD BANK)

IN TRANSFER SWITCH

NO AUXILIARY CONTACT

WITH MANUFACTURER)

(CONDUCTORS NOT NEEDED-VERIFY

12 AWG THWN CONDUCTORS

NOT TO SCALE

LOAD BANK CONTROL WIRING DETAILS

EA

EC

DETAIL

SEE ORD-D-ALS09R-E012-1

1.

FACTORY-INSTALLED.

CONDUCTORS SHOWN WITH DASHED LINES ARE

NOTES:

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-E012

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

RUNWAY 9R ALSF-2/27L LOCALIZER

LOAD BANK CONTROL WIRING

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -a ls r-e .d g n

2020-07-02T13:43:29-0500
RAFAEL CRAME
2020-07-09T14:32:05-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .