ord-d-ald09r-g008.pdf
PDF 274 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation requests offers for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract documents. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar airport construction projects of comparable size and scope. Offers are due by October 7, 2020 and shall include documentation of bonding and insurance capabilities, references, subcontracting plans, and past performance questionnaires. The Federal Aviation Administration Southwestern Region will administer this contract for construction services at O'Hare International Airport.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ld r-g .d g n
/2
/2
:3
:1
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
(1.5 M)
NEXT X MILES
CONSTRUCTION
ROAD
CONSTRUCTION
END
(IF SPECIFIED)
SIGN
MIN.
M
IN
M
IN
MIN.
M
IN
M
IN
M
IN
M
IN
MIN.
M
IN
M
IN
EMBEDMENT
MIN.
6’ - 12’
(1.2 M)
(1.8 M)
(2.1 M)
(1.5 M)
(600 - 3 M)
2 (
.4
M
R
(180) (200)
.8
4’
(1.2 M)
.1
0 (
5’
(1.5 M)
.1
.2
8’
(2.4 M)
(1.8 M - 3.6 M)
5’
G20-1(0)-6036 G20-2A(0)-6024
E D
G E
O F
P A
V E
M E
N T
STOP SLOW
RURAL
URBAN
MIN. RURAL
MIN. URBAN
FEDERAL SERIES B
FEDERAL SERIES C
4’
6’
5’
7’
24 - 10’
5’
(600)
(125)
(175)
(400)
(513)
.8
(15)
20 1/2
19/32
POST MOUNTED SIGNS
EDGE OF THE PAVED SHOULDER.
FACE OF CURB OR 6’ (1.8 M) TO THE OUTSIDE
THIS DIMENSION SHALL BE 24 (600) TO THE
WHEN CURB OR PAVED SHOULDER ARE PRESENT
SIGNS ON TEMPORARY SUPPORTS
MOTORISTS.
SHALL BE SUFFICIENT TO BE SEEN BY
BEHIND OTHER DEVICES, THE HEIGHT
BE 5’ (1.5 M) MIN. IF LOCATED
FOUR DAYS, THIS DIMENSION SHALL
WHEN WORK OPERATIONS EXCEED
HIGH LEVEL WARNING DEVICE WORK LIMIT SIGNING
LANE HIGHWAYS.
DUAL SIGN DISPLAYS SHALL BE UTILIZED ON MULTI-
WITHIN 2 MILES (3200 M) .
THE END OF THE JOB UNLESS ANOTHER JOB IS
END CONSTRUCTION SIGN SHALL BE ERECTED AT
JECT LIMITS.
BE PLACED 500’ (150 M) IN ADVANCE OF PRO-
ROAD CONSTRUCTION NEXT X MILES SIGN SHALL
2 MILES (3200 M) OR MORE IN LENGTH.
THIS SIGNING IS REQUIRED FOR ALL PROJECTS
ARROW BOARDS
FLAGGER TRAFFIC CONTROL SIGN
FRONT SIDE REVERSE SIDE
FLASHING LIGHT
TYPE B MONODIRECTIONAL
WOOD POST
METAL OR
OF PAVEMENT
ELEVATION OF EDGE
OF PAVEMENT
ELEVATION OF EDGE
OF CURB
OR FACE
PAVEMENT
EDGE OF
ORANGE FLAGS
18 X 18 (450X450)
TYPE A
ROOF
MOUNTED
TYPE B
MOUNTED
TYPE C
MOUNTED
TRAILERROOF OR TRAILER
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
07/24/2019 1898272
ORD-D-ALD09R-G008
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALD
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ld r-g .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
RUNWAY 9R-27L NAVAIDS
DEVICES DETAILS
TRAFFIC CONTROL
| 2020-07-02T13:17:42-0500 | |
| RAFAEL CRAME |
| 2020-07-09T12:13:37-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .