About this file

This solicitation requests offers for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract documents. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar airport construction projects of comparable size and scope. Offers are due by October 7, 2020 and shall include documentation of bonding and insurance capabilities, references, subcontracting plans, and past performance questionnaires. The Federal Aviation Administration Southwestern Region will administer this contract for construction services at O'Hare International Airport.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ld r-g .d g n

/2

/2

:3

:1

A

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

(1.5 M)

NEXT X MILES

CONSTRUCTION

ROAD

CONSTRUCTION

END

(IF SPECIFIED)

SIGN

MIN.

M

IN

M

IN

MIN.

M

IN

M

IN

M

IN

M

IN

MIN.

M

IN

M

IN

EMBEDMENT

MIN.

6’ - 12’

(1.2 M)

(1.8 M)

(2.1 M)

(1.5 M)

(600 - 3 M)

2 (

.4

M

R

(180) (200)

.8

4’

(1.2 M)

.1

0 (

5’

(1.5 M)

.1

.2

8’

(2.4 M)

(1.8 M - 3.6 M)

5’

G20-1(0)-6036 G20-2A(0)-6024

E D

G E

O F

P A

V E

M E

N T

STOP SLOW

RURAL

URBAN

MIN. RURAL

MIN. URBAN

FEDERAL SERIES B

FEDERAL SERIES C

4’

6’

5’

7’

24 - 10’

5’

(600)

(125)

(175)

(400)

(513)

.8

(15)

20 1/2

19/32

POST MOUNTED SIGNS

EDGE OF THE PAVED SHOULDER.

FACE OF CURB OR 6’ (1.8 M) TO THE OUTSIDE

THIS DIMENSION SHALL BE 24 (600) TO THE

WHEN CURB OR PAVED SHOULDER ARE PRESENT

SIGNS ON TEMPORARY SUPPORTS

MOTORISTS.

SHALL BE SUFFICIENT TO BE SEEN BY

BEHIND OTHER DEVICES, THE HEIGHT

BE 5’ (1.5 M) MIN. IF LOCATED

FOUR DAYS, THIS DIMENSION SHALL

WHEN WORK OPERATIONS EXCEED

HIGH LEVEL WARNING DEVICE WORK LIMIT SIGNING

LANE HIGHWAYS.

DUAL SIGN DISPLAYS SHALL BE UTILIZED ON MULTI-

WITHIN 2 MILES (3200 M) .

THE END OF THE JOB UNLESS ANOTHER JOB IS

END CONSTRUCTION SIGN SHALL BE ERECTED AT

JECT LIMITS.

BE PLACED 500’ (150 M) IN ADVANCE OF PRO-

ROAD CONSTRUCTION NEXT X MILES SIGN SHALL

2 MILES (3200 M) OR MORE IN LENGTH.

THIS SIGNING IS REQUIRED FOR ALL PROJECTS

ARROW BOARDS

FLAGGER TRAFFIC CONTROL SIGN

FRONT SIDE REVERSE SIDE

FLASHING LIGHT

TYPE B MONODIRECTIONAL

WOOD POST

METAL OR

OF PAVEMENT

ELEVATION OF EDGE

OF PAVEMENT

ELEVATION OF EDGE

OF CURB

OR FACE

PAVEMENT

EDGE OF

ORANGE FLAGS

18 X 18 (450X450)

TYPE A

ROOF

MOUNTED

TYPE B

MOUNTED

TYPE C

MOUNTED

TRAILERROOF OR TRAILER

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

07/24/2019 1898272

ORD-D-ALD09R-G008

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALD

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ld r-g .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

RUNWAY 9R-27L NAVAIDS

DEVICES DETAILS

TRAFFIC CONTROL

2020-07-02T13:17:42-0500
RAFAEL CRAME
2020-07-09T12:13:37-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .