About this file

This solicitation is for construction services to establish NAVAIDS facilities serving an extended runway at Chicago O'Hare International Airport. The contractor shall provide all labor, supervision, materials, and equipment to perform the project, including installation of sensors, conduits, junction boxes, and other electrical work. The performance period is 605 calendar days, with an anticipated start of November 15, 2020. The estimated price range for this procurement is $5 million to $10 million. Interested firms must demonstrate experience on similar airport projects of comparable size and scope. Offers are due by October 7, 2020 and must include details on past performance, schedule, insurance, bonding, and small business subcontracting plans. The Federal Aviation Administration Southwestern Region is the contracting agency.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls l-e .d g n

/2

/2

:5

:1

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

T Y

P

DOOR

FITTING

EMT COMPRESSION

3/4" EMT CONDUIT

T Y

P

3/4" EMT CONDUIT

FITTING

EMT COMPRESSION

FITTING

EMT COMPRESSION

4" SQUARE x 2 1/8" DEEP

STANDARD ELECTRICAL BOX

4" SQUARE x 2 1/8" DEEP

STANDARD ELECTRICAL BOX

14 AWG THWN BLACK 14 AWG THWN BLACK

14 AWG THWN RED

+ - 7 8

1" TYP

67854

NOC

1" TYP

NOC

PWR

INTRUSION SWITCH INSTALLATION

FOR SINGLE DOOR

INTRUSION SWITCH INSTALLATION

FOR DOUBLE DOOR (TYPICAL)

ION SMOKE DETECTOR HOOK-UPPHOTO SMOKE DETECTOR HOOK-UP

NOT TO SCALE NOT TO SCALE

NOT TO SCALENOT TO SCALE

AUX AUX

3/4" EMT CONDUIT

INACTIVE DOOR

BOX 4"x4"x2"

OUTLET

STANDARD

14 AWG THWN RED

4"X4"X2"

STANDARD OUTLET BOX

WITH SWITCH

CABLE PROVIDED

FITTING

COMPRESSION

EMT

3/4" EMT CONDUIT

DESCRIPTION

SWITCHING DIODE, DS1,

P/N JAN1N4148-1

POWER SENSOR

NEW BEDFORD PANORAMEX CORP, UPLAND, CA

PART NO U3003618-01

RESISTOR, 499 OHM, 1% TOL 1/4 WATT

P/N RLR07C4990FR, MIL-R-39017/1

12/24 VDC RELAY MODULE, NO A77-716B

SYSTEM SENSOR, DIV. OF PITTWAY

ST CHARLES, IL

NEW BEDFORD PANORAMEX CORP., UPLAND, CA

PART NO U3001121-01

NEW BEDFORD PANORAMEX CORP., UPLAND, CA

PART NO U3003384-01

NEW BEDFORD PANORAMEX CORP., UPLAND, CA

PART NO U3003385-01

NEW BEDFORD PANORAMEX CORP., UPLAND, CA

PART NO U3003386-01

PART NO U3001120-01

NO QTY

NEW BEDFORD PANORAMEX CORP., UPLAND, CA

INTRUSION SWITCH, ASSOCIATED CONDUIT, AND WIRING

SMOKE DETECTOR, ASSOCIATED CONDUIT, AND WIRING

INSTALL OUTSIDE TEMPERATURE SENSOR ASSEMBLY

INSTALL INSIDE TEMPERATURE SENSOR ASSEMBLY

INSTALL ION SMOKE DETECTOR

INSTALL PHOTO SMOKE DETECTOR

INSTALL INTRUSION SWITCH

REMARKS

SEE NOTE 1.

ALSF-2 EQUIPMENT.

FURNISHED WITH

ALSF-2 EQUIPMENT

FURNISHED WITH

ALSF-2 EQUIPMENT

FURNISHED WITH

ALSF-2 EQUIPMENT

FURNISHED WITH

ALSF-2 EQUIPMENT

FURNISHED WITH

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

INSTALLATION PERSONNEL

INSTALLED BY FAA

FURNISHED AND

ENVIRONMENTAL EQUIPMENT SCHEDULE

11 1

ALSF-2 EQUIPMENT ROOM

ROOM

GENERATOR

ENGINE/

LOCALIZER

EQUIPMENT

ROOM

5’-3"

14’-6 1/4"

3/4" EMT

SEE NOTE 2

3’-0"

EF-1

D-1

E-9

E-10

E-2

E-6

E-4

E-1

E-5

E-8

E-12

T-3

C-13 C-10

A-23R

C-8A

C-8

D-11

D-2

D-8

D-9

D-17

T-1

D-3

C-4

HVAC-1HVAC-2

MC-1

HVAC-3

CD-2

D-4

T-2

A-23E

CD-1

D-7

D-12

D-14

D-10

D-13

E-15

E-16

C-12

C-2

C-7 C-6

C-11

C-9

C-5

T-2

C-1

D-20

D-18

C-14

D-15

FE FE

FE

FE

(C-3)

NO. 1

CCR

(C-3)

NO. 2

CCR

(C-3)

NO. 3

CCR

(C-3)

NO. 4

CCR

(C-3)

NO. 5

CCR

C-18

C-17

C-16

C-18

C-18

E-11

E-7

E-7

E-7

E-7

SCALE: 3/8" = 1’-0"

PLAN

3/4" EMT

SUBSYSTEM, C-5

MONITORING

REMOTE

WITH SENSOR

SWITCH, D-2

E/G TRANSFER

D-23

D-19

D-16

3/4" EMT

E-14

E-3

D-10B

D-10A

OF WIRE WAY

TO TOP

GANG BOX

4" x 4"

3/4" EMT

OF WIREWAY

TIE INTO TOP

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS27L-E005

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls l-e .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

NOTES:

1.

2.

3.

REPRESENTATIVES.

AND MONITORING CONDUCTORS WILL BE FURNISHED AND INSTALLED BY FAA INSTALLATION

THROUGH BOX ABOVE PANEL PRIOR TO TERMINATING CONDUCTORS AT BREAKERS. CONTROL

DUCT. CONTRACTOR SHALL LOOP 3/C 10 AWG POWER CABLE FOR OBSTRUCTION LIGHTS

DOOR TO OCTAL JUNCTION BOX AND CONTINUE CONDUIT TO PENETRATION AT TOP OF SQUARE

RACK LOCATION AND SHALL INSTALL A 3/4" EMT CONDUIT FROM JUNCTION BOX ABOVE

CONTRACTOR SHALL INSTALL AN OCTAL JUNCTION BOX ON CEILING ABOVE FUTURE LOCALIZER

FROM POWER PANEL E-3 TO BOX ABOVE PANEL AND CONTINUE CONDUIT TO BOX ABOVE DOOR.

ON WALL ABOVE POWER DISTRIBUTION PANEL E-3 AND SHALL INSTALL 3/4" EMT CONDUIT

WILL INSTALL THIS SWITCH. CONTRACTOR SHALL INSTALL ANOTHER ELECTRICAL JUNCTION BOX

BY THE GOVERNMENT WITH THE LOCALIZER EQUIPMENT. FAA INSTALLATION REPRESENTATIVES

THIS BOX WILL BE USED TO PROVIDE WIRING TO AN INTRUSION SWITCH WHICH IS PROVIDED

CONTRACTOR SHALL INSTALL A 4" X 4" JUNCTION BOX ON WALL ABOVE THE DOUBLE DOOR.

INSTALLATION.

CONTRACTOR SHALL INSTALL THE REQUIRED CONDUIT, GANG BOXES, ETC. FOR THEIR

THE SMOKE DETECTOR AND LOCALIZER EQUIPMENT SHALL BE INSTALLED BY OTHERS. THE

SENSORS WILL BE FURNISHED AND INSTALLED BY FAA INSTALLATION PERSONNEL.

HARDWARE SHALL BE STAINLESS STEEL. CONDUITS SHALL BE FLUSH-MOUNTED. WIRING FOR

SIDE OF BUILDING EXTERIOR AND 8’ ABOVE TOP OF FOUNDATION. ALL EXTERIOR FASTENING

OUTSIDE TEMPERATURE SENSOR WITH COVER SHALL BE INSTALLED ON THE SOUTHEAST

RUNWAY 27L ALSF-2 / 9R LOCALIZER

ENVIRONMENTAL SENSORS INSTALLATION

KE

RC

SCALE: 3/8" = 1’-0"

4’ 6’2’02’

N

2020-07-02T14:02:06-0500
RAFAEL CRAME
2020-07-09T15:41:22-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .