About this file

This federal solicitation is seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials and equipment to perform the project, including installation of a new underground storage tank, day tank, engine generator, fuel lines and vent piping. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5,000,000 to $10,000,000. Offerors must have successfully completed similar projects both in dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020 and shall include documentation of relevant past experience, insurance certificates, bonding capability, and subcontracting plans. The selected contractor must be registered in SAM.gov and able to adhere to the specified construction schedule.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-m .d g n

/2

/2

:3

:4

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

1’-7 1/4"2’-0"5’-4 3/4"

15’-4"

3’-4"3’-0"

4’-6"

AA

MONITORING SENSORS

4" NPT FITTING FOR TANK

SCALE: 3/4"=1’-0"

PLAN

DETAIL - MAINTENANCE SLAB CONSTRUCTION AND PIPE ROUTING

STEEL SHEET METAL SHROUD

16 GA (MIN) GALVANIZED

INSTALL FLEXIBLE FUEL LINES PROVIDED

WITH ENGINE/GENERATOR BY KOHLER

SEE NOTE 4

PROVIDE CLEAR SPACE BENEATH E.G. FOR

CONTRACTOR FURNISHED OIL-DRIP PAN

RUPTURE BASIN

RUPTURE BASIN

LEAK DETECTOR

1/3 HP SUPPLY PUMP

1/3 HP RETURN PUMP

INTERIOR BUILDING WALL

REDUCER

1" TO 3/4"

SEE NOTE 5

GENERATOR

ENGINE/

480V/3P

250 KW

SEE NOTE 6

EXHAUST SILENCER

STAINLESS STEEL

DOUBLE-WALL FUEL

PIPING CONTAINMENT

SYSTEM

END (TYPICAL)

WITH UNION

BALL VALVE

3/4" BRONZE

2000/5.

SEPAR SWK

FUEL FILTER,

PER NOTE 2

STRAINER

ITEM 4222TI

McMASTER-CARR

CHECK VALVE

INLET

MANUAL FILL

TO UST

EF-1

PLUG

NOT TO SCALE

SECTION - FUEL LINE ROUTING

A

FROM FUEL STORAGE TANK

3/4" FUEL SUPPLY PIPING

FALL 1/4" PER FOOT TO TANK

STORAGE TANK. RETURN LINE SHALL

3/4" FUEL RETURN PIPING TO FUEL

75 GALLON DAY TANK

SEE NOTE 3

2" EMERGENCY VENT.

SEE NOTE 3

1 1/2" NORMAL VENT.

SEE NOTE 1

SOLENOID VALVE SV-1.

PLUG ALTERNATE

RETURN PORT, 1" DIA

EXTERIOR BUILDING WALL

01’ 1’ 3’2’

SCALE: 3/4" = 1’-0"

N

ENGINE. FURNISHED WITH E/G

AND RETURN LINES TO

FLEXIBLE FUEL SUPPLY

SEE NOTE 5

75 GALLON DAY TANK

SEE NOTE 3

1 1/2" NORMAL VENT.

SEE NOTE 3.

2" EMERGENCY VENT.

BELOW GRADE. SEE NOTE 3

STORAGE TANK VENT 2’

2" GRSC UNDERGROUND

EXHAUST SILENCER

STAINLESS STEEL

TO SHROUD

CANVAS CONNECTION

FUEL RETURN LINE

FUEL SUPPLY LINE

FRAME AND COVER

18" MANHOLE

SIGNAL CABLES

MONITORING SENSOR

3/4" GRSC FOR TANK

SUBGRADE INSPECTION WELL

18" MANHOLE FRAME AND COVER

TIE-DOWN LOCATION (TYP)

FUEL STORAGE TANK

PLASTIC DOUBLE-WALL UNDERGROUND

1000 GALLON FIBERGLASS REINFORCED

CONCRETE SURFACES

REINFORCEMENT 3" CLEAR FROM

FOUNDATION WITH 6 X 6 X 6/6 WWF

CONSTRUCT REINFORCED CONCRETE

LIFTING LUG

(TYPICAL OF 4)

4" NPT FITTING

AND COVER

36" MANHOLE FRAME

22" MANWAY

FUSIBLE LINK

2" TUBE STEEL

5/8" THREADED ROD

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-M004

ENGINEERING SERVICES

ALS

RUNWAY 9R ALSF-2/27L LOCALIZER

FOUNDATION PLAN

UNDERGROUND STORAGE TANK (UST)

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER

o rd -d -a ls r-m .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

LKN

RC

MGR: ENGINEERING

C O

N S

T R

U C

T

IO

N

2.

1.

NOTES:

3.

4.

5.

8.

6.

FOR TRAINING TO FAA MAINTENANCE TECHNICIANS FOR TANK MONITORING SYSTEM.

CONTRACTOR TO PROVIDE MINIMUM 2-SESSIONS OF 8-HOURS EACH (NIGHT OR DAY)

MAINTENANCE PADS AS MUCH AS POSSIBLE.

HAZARD. MOUNT FUEL PIPING AS CLOSE TO THE WALLS AND ATOP CONCRETE

ALL FUEL PIPING SHALL BE ROUTED SUCH THAT IT DOES NOT CREATE A TRIPPING

PROVIDE DRAIN VALVE ON THE MUFFLER.

AND PROVIDE THAT DOCUMENTATION TO FAA RESIDENT ENGINEER.

NECESSARY FLUIDS FOR START-UP. FOLLOW KOHLER START-UP PROCEDURES

BY CONTRACTOR. COORDINATE AND ASSIST WITH EG START-UP. PROVIDE ALL

ENGINE GENERATOR AND DAY TANK TO BE PROVIDED BY FAA AND INSTALLED

TANK AND THE ENGINE GENERATOR FOR MAINTENANCE PURPOSES.

PROVIDE VALVE ON FLEXIBLE FUEL LINE (SUPPLY AND RETURN) AT BOTH THE DAY

AT 3’ O.C. PROVIDE CAPS TO PREVENT RAIN/BIRD INTRUSION.

TERMINATE 12’ MINIMUM ABOVE FINISHED GRADE. SECURE TO EXTERIOR WALL

NORMAL, EMERGENCY, AND UNDERGROUND STORAGE TANK VENTS SHALL

INSTALL FILTER AND CHECK VALVE, WHICH ARE FURNISHED WITH THE DAY TANK.

SOLENOID VALVE SV-1 IS INSTALLED AND WIRED BY THE MANUFACTURER.

7.

2020-07-02T13:50:58-0500
RAFAEL CRAME
2020-07-09T14:53:18-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .