ord-d-als09r-m004.pdf
PDF 302 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This federal solicitation is seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials and equipment to perform the project, including installation of a new underground storage tank, day tank, engine generator, fuel lines and vent piping. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5,000,000 to $10,000,000. Offerors must have successfully completed similar projects both in dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020 and shall include documentation of relevant past experience, insurance certificates, bonding capability, and subcontracting plans. The selected contractor must be registered in SAM.gov and able to adhere to the specified construction schedule.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls r-m .d g n
/2
/2
:3
:4
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
1’-7 1/4"2’-0"5’-4 3/4"
15’-4"
3’-4"3’-0"
4’-6"
AA
MONITORING SENSORS
4" NPT FITTING FOR TANK
SCALE: 3/4"=1’-0"
PLAN
DETAIL - MAINTENANCE SLAB CONSTRUCTION AND PIPE ROUTING
STEEL SHEET METAL SHROUD
16 GA (MIN) GALVANIZED
INSTALL FLEXIBLE FUEL LINES PROVIDED
WITH ENGINE/GENERATOR BY KOHLER
SEE NOTE 4
PROVIDE CLEAR SPACE BENEATH E.G. FOR
CONTRACTOR FURNISHED OIL-DRIP PAN
RUPTURE BASIN
RUPTURE BASIN
LEAK DETECTOR
1/3 HP SUPPLY PUMP
1/3 HP RETURN PUMP
INTERIOR BUILDING WALL
REDUCER
1" TO 3/4"
SEE NOTE 5
GENERATOR
ENGINE/
480V/3P
250 KW
SEE NOTE 6
EXHAUST SILENCER
STAINLESS STEEL
DOUBLE-WALL FUEL
PIPING CONTAINMENT
SYSTEM
END (TYPICAL)
WITH UNION
BALL VALVE
3/4" BRONZE
2000/5.
SEPAR SWK
FUEL FILTER,
PER NOTE 2
STRAINER
ITEM 4222TI
McMASTER-CARR
CHECK VALVE
INLET
MANUAL FILL
TO UST
EF-1
PLUG
NOT TO SCALE
SECTION - FUEL LINE ROUTING
A
FROM FUEL STORAGE TANK
3/4" FUEL SUPPLY PIPING
FALL 1/4" PER FOOT TO TANK
STORAGE TANK. RETURN LINE SHALL
3/4" FUEL RETURN PIPING TO FUEL
75 GALLON DAY TANK
SEE NOTE 3
2" EMERGENCY VENT.
SEE NOTE 3
1 1/2" NORMAL VENT.
SEE NOTE 1
SOLENOID VALVE SV-1.
PLUG ALTERNATE
RETURN PORT, 1" DIA
EXTERIOR BUILDING WALL
01’ 1’ 3’2’
SCALE: 3/4" = 1’-0"
N
ENGINE. FURNISHED WITH E/G
AND RETURN LINES TO
FLEXIBLE FUEL SUPPLY
SEE NOTE 5
75 GALLON DAY TANK
SEE NOTE 3
1 1/2" NORMAL VENT.
SEE NOTE 3.
2" EMERGENCY VENT.
BELOW GRADE. SEE NOTE 3
STORAGE TANK VENT 2’
2" GRSC UNDERGROUND
EXHAUST SILENCER
STAINLESS STEEL
TO SHROUD
CANVAS CONNECTION
FUEL RETURN LINE
FUEL SUPPLY LINE
FRAME AND COVER
18" MANHOLE
SIGNAL CABLES
MONITORING SENSOR
3/4" GRSC FOR TANK
SUBGRADE INSPECTION WELL
18" MANHOLE FRAME AND COVER
TIE-DOWN LOCATION (TYP)
FUEL STORAGE TANK
PLASTIC DOUBLE-WALL UNDERGROUND
1000 GALLON FIBERGLASS REINFORCED
CONCRETE SURFACES
REINFORCEMENT 3" CLEAR FROM
FOUNDATION WITH 6 X 6 X 6/6 WWF
CONSTRUCT REINFORCED CONCRETE
LIFTING LUG
(TYPICAL OF 4)
4" NPT FITTING
AND COVER
36" MANHOLE FRAME
22" MANWAY
FUSIBLE LINK
2" TUBE STEEL
5/8" THREADED ROD
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS09R-M004
ENGINEERING SERVICES
ALS
RUNWAY 9R ALSF-2/27L LOCALIZER
FOUNDATION PLAN
UNDERGROUND STORAGE TANK (UST)
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER
o rd -d -a ls r-m .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LKN
RC
MGR: ENGINEERING
C O
N S
T R
U C
T
IO
N
2.
1.
NOTES:
3.
4.
5.
8.
6.
FOR TRAINING TO FAA MAINTENANCE TECHNICIANS FOR TANK MONITORING SYSTEM.
CONTRACTOR TO PROVIDE MINIMUM 2-SESSIONS OF 8-HOURS EACH (NIGHT OR DAY)
MAINTENANCE PADS AS MUCH AS POSSIBLE.
HAZARD. MOUNT FUEL PIPING AS CLOSE TO THE WALLS AND ATOP CONCRETE
ALL FUEL PIPING SHALL BE ROUTED SUCH THAT IT DOES NOT CREATE A TRIPPING
PROVIDE DRAIN VALVE ON THE MUFFLER.
AND PROVIDE THAT DOCUMENTATION TO FAA RESIDENT ENGINEER.
NECESSARY FLUIDS FOR START-UP. FOLLOW KOHLER START-UP PROCEDURES
BY CONTRACTOR. COORDINATE AND ASSIST WITH EG START-UP. PROVIDE ALL
ENGINE GENERATOR AND DAY TANK TO BE PROVIDED BY FAA AND INSTALLED
TANK AND THE ENGINE GENERATOR FOR MAINTENANCE PURPOSES.
PROVIDE VALVE ON FLEXIBLE FUEL LINE (SUPPLY AND RETURN) AT BOTH THE DAY
AT 3’ O.C. PROVIDE CAPS TO PREVENT RAIN/BIRD INTRUSION.
TERMINATE 12’ MINIMUM ABOVE FINISHED GRADE. SECURE TO EXTERIOR WALL
NORMAL, EMERGENCY, AND UNDERGROUND STORAGE TANK VENTS SHALL
INSTALL FILTER AND CHECK VALVE, WHICH ARE FURNISHED WITH THE DAY TANK.
SOLENOID VALVE SV-1 IS INSTALLED AND WIRED BY THE MANUFACTURER.
7.
| 2020-07-02T13:50:58-0500 | |
| RAFAEL CRAME |
| 2020-07-09T14:53:18-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .