ord-d-gs09r-a001.pdf
PDF 385 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project, including establishing NAVAIDS facilities, with an estimated price range between $5 million to $10 million. The performance period is 605 calendar days starting November 15, 2020. Interested firms must demonstrate experience with similar airport projects and must submit their offer with required documents by October 7, 2020 to the Federal Aviation Administration Southwestern Region contact via email. Eligible offerors must have an active SAM registration and meet insurance requirements.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
5.
6.
7.
8.
9.
10.
11.
12.
1.
2.
3.
4.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
1.
2.
3.
4.
5. 10 PSFMECHANICAL ALLOWANCE:
30 PSF (COMPONENTS)WIND LOAD:
25 PSF (MWFRS)WIND LOAD:
30 PSFSNOW LOAD:
150 PSFFLOOR LIVE LOAD:
fY = 60 KSI (EPOXY COATED)REINFORCEMENT:
f ’C = 3,000 PSI @ 28 DAYSCONCRETE:
DESIGN CRITERIA
SEE ORD-D-ALD09R-G031 FOR WING WALL.
RODENT/INSECT/WATER PROOF INSTALLATION.
SIDING DETAILS, ETC. STRICT ATTENTION SHALL BE PAID TO PROVIDE A
SHOWING HOW HE SHALL ACCOMPLICH THE CORNERS WITH J-CHANNEL AND
CONTRACTOR TO MOCK UP ONE WALL PRIOR TO CONSTRUCTING SHELTER,
COORDINATE BUILDING NUMBER AND EXACT LOCATION WITH THE FAA R.E.
SIDE OF THE BUILDING DENOTING THE FIRE DEPARTMENT BUILDING NUMBER.
CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON THE ROAD FACING
WITH FAA RESIDENT ENGINEER.
THE FAA LOGO. COORDINATE SIGN SIZE, COLORING AND ROOM DESIGNATIONS
EQUIPMENT ROOM. THE SIGN SHALL INCLUDE A COLOR REPRESENTATION OF
THAT DESIGNATES THE ROOM’S USE, I.E., GENERATOR ROOM, LOCALIZER ROOM,
CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON EACH EXTERIOR DOOR
DOOR. THE STAMP OR LABEL SHALL NOT BE PAINTED OVER.
INDICATED BY A STAMP OR METAL LABEL VISIBLE WHEN OPENING THE
DOORS AND DOOR FRAMES SHALL BE FIRE RATED. FIRE RATING SHALL BE
AS WELL AS AN EXTERIOR DOOR SWEEP WITH TRIM.
A TOE KICK SHALL BE PROVIDED ON THE INTERIOR SIDE OF THE DOOR,
FACTORY PAINTED TO MATCH SIDING.
SCREWS FASTENING SIDING TO STRUCTURE SHALL BE STAINLESS STEEL,
FOR LIGHTNING PROTECTION REQUIREMENTS SEE SHEET STD-D-LTNGPROT-E01.
REQUIRED BY THE FAA R.E.
BEARING BENEATH THE FOUNDATION TO A DEPTH OF 3’ MIN. OR DEPTH AS
FOUNDATION SHALL BE 3.0 KSF. THE CONTRACTOR QC MUST VERIFY
THE REQUIRED MINIMUM BEARING CAPACITY ON SUBGRADE BENEATH THE
MANUFACTURER.
DECORATIVE END CAP OR COVER APPROVED BY THE ROOFING
EXPOSED ENDS OF STANDING SEAMS SHALL BE CAPPED WITH A
WITH EXTERIOR GRADE SILICONE SEALER. COLOR SHALL BE WHITE.
CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH BUILDING WALLS
SUBSTITUTIONS PER SPECIAL SPECIFICATIONS.
LIST OF MATERIAL AND AN INSTALLATION INSTRUCTION BOOK. SUBMIT
MATERIAL SHALL BE PROVIDED BY THE MANUFACTURER WITH A DETAILED
AS A COMPLETE SYSTEM, WITH WARRANTY, PER SPECIAL SPECIFICATIONS.
FASCIA, AND TRIM SYSTEM SHALL BE FABRICATED BY ONE MANUFACTURER
STANDING SEAM METAL ROOFING PANELS, SIDING PANELS, AND SOFFIT,
DRAWINGS FOR SUBSTITUTION.
FABRAL MEETS SPECIFICATIONS. COLOR SHALL BE WHITE. PROVIDE SHOP
FACTORY FINISH. POSI-LOCK METAL SOFFIT AND FASCIA SYSTEM FROM
FASTENERS, CONTINUOUSLY VENTED, AND 20 YEAR WARRANTY ON
SOFFIT AND FASCIA MATERIAL SHALL BE ALUMINIUM WITH HIDDEN
24.
FORM CONCRETE)
(DO NOT USE TO
INSULATION
2" RIGID FOAM
NOTE 1
FLOOR PER
FINISHED
WHITE STEEL FASCIA
FIBERGLASS BATT INSULATION,
R-19 IN WALLS, R-30 ABOVE CEILING
AIR AND WATER INFILTRATION BARRIER,
1/2" THICK O.S.B. SHEATHING PER NOTE 3
STEEL STANDING SEAM
SIDING.
BARRIER
6 MIL VAPOR
CRUSHED ROCK
COMPACTED
12" DEPTH
6 X 6 X 6/6 WWF
6 MIL POLYETHYLENE
VAPOR BARRIER
BARS CONTINUOUS
AROUND PERIMETER
1’-6"
TYP
1’-6"
TYP
8"
3" (TYP.)
1%
8" 8"8"
TYVEK COMMERICALWRAP MEETS SPECIFICATIONS
CONTINUOUSLY VENTED
2 X 6 STUD GRADE WALL 16" O.C.
1’-5"
" 5
CL
SPACED @ 16" O.C.
RAFTERS, AND JOISTS
2 X 6 STUD GRADE,
OPENING
17" X 10" HVAC RETURN
OVER FOUNDATION 2"
OVERLAP SHEATHING
(NOT CHAMFERED)
CONCRETE FOUNDATION
CONSTRUCT REINFORCED
IMPROVEMENT
PROPOSED SURFACE
SEE CIVIL PLANS FOR
REPRESENTATIVES
BY FAA INSTALLATION
FURNISHED AND INSTALLED
FLIGHT CHECK ANTENNA
ENTERING DOOR INTERIOR.
OF DOOR TO PREVENT MOISTURE FROM
SEAL HOLES AT TOP AND BOTTOM
FIRE-RATED DOOR PER SPECIFICATIONS.
HOLLOW CORE INSULATED METAL
FIRE RATED FRAME FOR 3’-0" X 6’-8"
TIE, MODEL H2 MEETS SPECIFICATIONS
DOUBLE TOP WALL PLATES. SIMPSON STRONG
THE RAFTER AND CEILING JOISTS TO THE
18 GA GALVANIZED TIE CONNECTOR. ANCHOR
DOUBLE 2" X 6" STUD GRADE HEADER PLATES.
CAT. NO. LCD-3, PART NO. 19040
ENVIRONMENTAL TECHNOLOGY, INC.
AUTOMATIC DEICING CONTROLLER,
PER SPECIFICATIONS
CONTINUOUS RIDGE VENT
(TYPICAL)
RAFTER
DOUBLE
TRUSS FRAMING
GRADE LADDER
2" X 6" STUD
(OSB) SHEATHING.
STRAND BOARD
3/4" ORIENTED
LEFT SIDE ELEVATION
FRONT ELEVATION
ROOF PLAN
7’-10 1/4"
17’-0 1/2"
7’-10 1/4"
3" (TYP)
5’-10 1/4" 5’-10 1/4"
13’-0 1/2"
3" (TYP) 3" (TYP)
2’-0" 2’-0"
29 3/4"
1/2" X 18" J-BOLT
AT 12" O.C. (TYPICAL)
4 L-BARS 2’-0" X 2’-0" #
5 REINFORCEMENT #2-
EACH WAY
4 @ 12" O.C. #
2’-0"
2 1/2" ASPHALT (BASE)
1 1/2" ASPHALT (FINISH)
(EACH FACE)
#4 BENT BARS
ROOF
SEAM STEEL
STANDING
MODIFIED PROCTOR (ASTM 1557)
ROCK CA-6. COMPACTED TO 95%
12" (MIN) COMPACTED CRUSHED
2’-0"
LB CONDULET
1" GRSC WITH LCD-8
WWF REINFORCEMENT
PAD WITH 6" X 6" X 6/6
4’ X 4’ X 11 1/2" CONCRETE
SUPPORT CONCRETE STOOP
8" THICK WING WALL TO
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
LKN
10/31/2019 1898272
ORD-D-GS09R-A001
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
GS
GLIDE SLOPE - RUNWAY 9R
FOUNDATION AND FRAMING DETAILS
12’ X 16’ EQUIPMENT SHELTER
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -g s r-a .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
CONTINUOUS WHITE ALUMINIUM SOFFIT
COURSE BITUMINOUS ASPHALT
AND 1 1/2" COMPACTED FINISH
COMPACTED DEPTH COURSE
OVER GEOTEXTILE PLACE 1 1/2"
(ASTM D1557) COMPACTED
TO 95% MODIFIED PROCTOR
6" MIN CA-6 COMPACTED
SPECIFICATIONS
PROTECTO CORP. MEETS
3/8" SILL SEALER STRIP,
SHEATHING
INTERIOR PLYWOOD
BOARD 3/4" OVER
5/8"TYPE X GYPSUM
BY CONTRACTOR
SUPPORT INSTALLED
1 1/4" ANTENNA
INSTALL BETWEEN EACH RAFTER.
STYROFOAM VENT BAFFLE.
BE WHITE.
PANEL. PROVIDE SHOP DRAWINGS FOR SUBSTITUTION. COLOR SHALL
COMBINATION STEEL AND NEOPRENE WASHER WITH COLOR TO MATCH
SHEATHING USING STAINLESS STEEL SCREWS WITH A NO. 14 X 1"
FROM FABRAL MEETS SPECIFICATIONS. PANELS SHALL BE FASTENED TO
FADE AND CHALK WARRANTY. MIGHTI-RIB PBR METAL SIDING SYSTEM
10-YEAR WARRANTY AGAINST EDGE RUST AND ACID RAIN, AND 30-YEAR
STEEL, EXPOSED FASTENERS, LIFETIME FILM INTEGRITY WARRANTY.
STRUCTURAL EXPOSED FASTENER WALL SYSTEM, 26 GA., GRADE 80 KSI
AND MOISTURE INFILTRATION.
SEAL BUILDING CORNERS AND DOOR FRAME TO PREVENT RODENT
ENTIRE ROOF.
AND 30 LB. FELT. INSTALL ICE AND WATER SHIELD OVER
WHITE. PANELS SHALL BE INSTALLED OVER 3/4" SHEATHING
ROOFING SYSTEMS MEETS SPECIFICATIONS. COLOR SHALL BE
ROOFING (16" COVERAGE) FROM FABRAL METAL WALL AND
WARRANTY ON ROOFING MATERIAL. SLIM SEAM METAL
STEEL, 20 YEAR WARRANTY ON FACTORY FINISH, LIFETIME
STANDING SEAM METAL ROOFING SYSTEM, 24 GA., GRADE 40
REFER TO HVAC MANUFACTURER’S FRAMING REQUIREMENTS.
PAINT. REFER TO DOOR MANUFACTURER’S FINISHING INSTRUCTIONS.
PAINT DOOR AND FRAME LIGHT GRAY USING EXTERIOR LATEX
SETS THAT ACCEPT BEST CORP. CORES.
CORPORATION LOCK SETS WILL BE PERMITTED FOR LOCK
35H-7-F-3-J-626-LHRB. SUBSTITUTIONS FOR BEST LOCK
DOOR, 3’-0" X 6’-8" X 1 3/4", WITH BEST LOCK SET
DOOR SHALL BE A HOLLOW METAL INSULATED EXTERIOR
ANCHORS 3’ O.C. MAX. AROUND PERIMETER.
SECURE WALLS TO FOUNDATION USING 1/2" X 18" J-BOLT
EACH STUD USING RING-SHANK NAILS SPACED 16" O.C.
STRAND BOARD (OSB) SHEATHING. SECURE PLYWOOD TO
EXTERIOR WALLS SHALL BE SHEATHED WITH 1/2" ORIENTED
INTERIOR SURFACES SHALL BE MADE SMOOTH AND PAINTED WHITE.
SHEATHING.
APPLY 5/8" TYPE X DRYWALL OVER THE INTERIOR PLYWOOD
BE FIRE RETARDANT TREATED (FRT) PLYWOOD.
WOOD SCREWS SPACED 16" O.C. . ALL PLYWOOD SHALL
OF THE STUDS. SECURE PLYWOOD TO EACH STUD USING
APPLY 3/4" PLYWOOD SHEATHING OVER INTERIOR SIDE
2-COAT GRAY, SATIN, WITH NON-SKID, NON-SLIP ADDITIVE.
UTILIZE A TWO PART EPOXY TYPE FLOOR COVERING,
CONCRETE FLOOR SLAB SHALL BE SEALED AS FOLLOWS:
EDGE ALL SIDES
GALVANIZED DRIP
o rd -d -g s r-a .d g n
/2
/2
:3
:3
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
| 2020-07-02T14:12:07-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:03:56-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .