This solicitation is for construction services for the establishment of navigational aids facilities serving the extended Runway 9R-27L at Chicago O'Hare International Airport. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with the contract drawings, specifications, and clauses. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate experience completing similar airport construction projects within the past five years that are comparable in dollar amount and scope of work. Offers are due by October 7, 2020. Respondents must meet insurance requirements and provide performance bonds, subcontracting plans, and past performance questionnaires as specified in the solicitation. The Federal Aviation Administration Southwestern Region is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -g s r-c .d g n
/2
/2
:4
:4
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
CONTRACTOR FURNISHED
OBSTRUCTION LIGHT
S
E
N O
T E
S
T E
S
T E
BRACKET C
ANTENNA
CROSS-BRACE
ANTENNA TOWER
SEE NOTE 2.
5’ ORANGE TOP SECTION.
SEE NOTE 2.
5’ ORANGE SECTION.
SECTION. SEE NOTE 2.
20’ ORANGE/WHITE
SEE NOTE 1.
PER DETAIL "3" (TYPICAL).
TOWER LEG CONNECTION
AIR TERMINAL
CABLE CONDUIT
POWER AND SIGNAL
REINFORCED CONCRETE FOUNDATION
CLAMPS.
LEGS CONNECTED TO LOOP WITH PARALLEL
AND INSTALL TWO DOWN CONDUCTORS ON SPARATE
AT TOP OF TOWER, CONNECT TO AIR TERMINAL,
CLASS II DOWN CONDUCTOR, FORM CLOSED LOOP
BOTTOM. SEE NOTE 2.
SECTION W/ORANGE ON
20’ ORANGE/WHITE TOWER
WITH LADDER)
HARDWARE FURNISHED
(TYPICAL, ATTACHING
1/2" U-BOLT
CONNECTORS PER SPECIFICATIONS.
GROUND WIRE WITH CRIMPED
SECTIONS USING 6 AWG INSULATED
WITH ANTENNA TOWER). BOND LADDER
GALVANIZED STEEL LADDER (FURNISHED
WITH ANTENNA TOWER)
LADDER (FURNISHED
GALVANIZED STEEL
WITH LADDER)
HARDWARE FURNISHED
(TYPICAL, ATTACHING
1/2" U-BOLT
CROSS-BRACE
ANTENNA TOWER
T
Y P
IC
A L
3/8"-16 X 1 1/2" S.S. HEX BOLT
LOCK CHANNEL (TYPICAL)
ANTENNA MOUNTING CHANNEL
3/8" S.S. LOCK WASHER
3/8"-16 S.S. HEX NUT
FRAME SECTION
ANTENNA MOUNTING
WASHER
3/8" S.S. LOCK
HEX NUT
3/8"-16 S.S.
PER NOTE 3
GROUNDING LUG
GROUNDING WIRE
6 AWG BARE COPPER
ANTENNA MOUNTING BRACKET
ARE FURNISHED BY FAA)
AND ATTACHING HARDWARE
MOUNTING FRAMES,
(TYPICAL OF THREE,
ANTENNA ELEMENT
(TYPICAL)
ANTENNA TOWER LEG
SEE NOTE 3.
GROUNDING CLAMP.
OF TWO PER LEG)
3/8"-16 (TYPICAL
3" U-BOLT CLAMP,
ANTENNA MOUNTING CHANNEL
OF TWO PER LEG)
SUPPORT ANGLE (TYPICAL
3/8" S.S. LOCK WASHER
3/8"-16 S.S. HEX NUT
L
NOT TO SCALE
DETAIL
NOT TO SCALE
DETAIL
ELEVATION
NOT TO SCALE
DETAIL
50’ GLIDE SLOPE ANTENNA TOWER
NOT TO SCALE
DETAIL
ANTENNA TOWER CROSS-BRACE
ELEVATION
LADDER ATTACHMENT TO ANTENNA TOWER
NOT TO SCALE
DETAIL
PLAN
NOT TO SCALE
DETAIL
FALL ARRESTER
TOWER LEG
HEX BOLT (TYPICAL)
7/8"-9 X 2 1/2"
ANTENNA MOUNTING FRAME
GALVANIZED LOCK WASHER
GALVANIZED 7/8"-9 HEX NUT
TOWER LEG
SEE NOTE 1
TOWER LEG
MOUNTING DETAILS.
OF 3). SEE DETAIL "2" FOR
ANTENNA ELEMENT (TYPICAL
AND ANTENNA TOWER CONNECTIONS
ANTENNA ELEMENT MOUNTING BRACKET
OSHA TIE-OFF POINTSTOWER LEG CONNECTION
LOCATIONS (TYP 3)
AT ANTENNA BRACKET
TOWER LEG APPROXIMATELY
SECURE TIE-OFF TO
TIE-OFF POINTS.
P/N 506277
MSA DYNA-GLIDE
FALL ARRESTER
NO SUBSTITUTIONS. SEE NOTE 4
NOTCHED RAIL, P/N 506270.
MSA DYNA-GLIDE GALVANIZED
SAFETY CLIMB RAIL SYSTEM
DYNA-GLIDE GALVANIZED
CLIMB RAIL, MSA
GALVANIZED SAFETY
SEE NOTE 3
7.
6.
8.
9.
10.
1.
2.
3.
4.
5.
NOTES:
11.
12.
13.
SPECIFICATION GL-D-918D.
THIS SHALL BE ACCOMPLISHED PER PARAGRAPH 28 OF THE SPECIAL SPECIFICATIONS AS WELL AS SECTION 9A OF
THE GLIDE SLOPE ANTENNA MASTS ARE GOVERNMENT-FURNISHED AND NEED TO BE REPAINTED PRIOR TO ERECTION.
IF THEY DIFFER FROM PLAN
PLACE TIE-OFF POINTS AT ANTENNA ELEVATIONS. VERIFY WITH FAA DISTRICT EOSH PERSONNEL ON LOCATION
TORQUE VALVES ARE PER NORMAL PUBLISHED STANDARD VALUES FOR THE SIZED NUT/BOLT COMBINATION.
ASSEMBLIES.
THE FAA SSC AND INSTALL THE DYNA-GLIDE CLIMB SYSTEM. THE CONTRACTOR ALSO INSTALL AND SUPPLY OSHA TIE-OFF HARDWARE
A SAFETY CLIMBING SYSTEM WITH A ROUND NOTCHED BAR ARE SHIPPED WITH THE ANTENNA TOWER. DELIVER THESE PARTS TO
THE CONTRACTOR MUST MAKE THE NECESSARY TOWER HEIGHT ADJUSTMENT TO FLIGHT CHECK AS DIRECTED BY THE FAA.
CLIMBING SYSTEM. NO SUBSTITUTIONS. SEE SHEET ORD-D-GS09C-C005-1.
CONTRACTOR INSTALL LADDER CLIMBING SAFETY SYSTEM. LADDER CLIMBING SYSTEM IS DYNA-GLIDE
AND INSTALL GS ANTENNA COAXIAL CABLES. ALL OTHER ITEMS SHOWN HERE BY CONTRACTOR UNLESS OTHERWISE NOTED.
FAA TO FURNISH AND CONTRACTOR INSTALL GLIDE SLOPE TOWER, ANTENNAS, AND ANTENNA MOUNTING KITS. FAA TO FURNISH
TO THE CENTER OF THE ANTENNA. THE LADDER POSITION WAS BE APPROVED BY THE FAA PRIOR TO INSTALLATION.
THE RUNWAY THRESHOLD. LADDER WAS INSTALLED CLOSER TO THE READ LEG OF ANTENNA MAST TO ALLOW ACCESS
INSTRUCTED BY FAA. THE LADDER WAS INSTALL ON THE RIGHT SIDE OF THE ANTENNA TOWER WHEN LOOKING TOWARD
THE CONTRACTOR MUST USE OFFSET BRACKETS IN PLACE OF U-BOLT ASSEMBLIES ON THE ANTENNA, FOUR PER ANTENNA IF
THE CONTRACTOR SHALL RE-PAINT ANY AREAS DAMAGED DURING CONSTRUCTION, SHIPPING, ETC.
THE CONTRACTOR SHALL PROVIDE AN LED OBSTRUCTION LIGHT TO REPLACE THE GFM INCANDESCENT TYPE PROVIDED WITH TOWER.
SEE THE GOVERNMENT-FURNISHED PROPERTY LIST FOR ITEMS PROVIDED BY THE FAA, ALSO SEE DWG. OED-D-GS09R-C005-1
AND 6 AWG BARE COPPER GROUNDING WIRE. CONNECT 6 AWG BARE TO ANTENNA TOWER STRUCTURE USING GROUNDING CLAMP.
FIELD-DRILL 3/8" DIAM. HOLE IN ANTENNA MOUNTING FRAME, SCRAPE PAINT FROM BONDING AREA AND INSTALL GROUNDING LUG
ORIGIN. ALL BARE METAL SHALL BE TREATED WITH ZRC GALVILITE GALVANIZING REPAIR COMPOUND.
CONDUCTOR, AND OBSTRUCTION LIGHT TO TOP OF SHORTENED TOWER. NON-CONTINUOUS CROSS-BRACING SHALL BE CUT AT ITS
CONTRACTOR TO CUT ANTENNA TOWER STRUCTURE, LADDER, AND SAFETY CLIMBING SYSTEM AND RELOCATE AIR TERMINAL, DOWN
SHORTEN THE TOWER TO 5’’-0" MAXIMUM HEIGHT ABOVE CENTERLINE OF TOP ANTENNA ELEMENT. THIS WILL REQUIRE THE
5’-0" BELOW TOP OF TOWER, TOWER MUST BE SHORTENED. CONTRACTOR SHOULD INCLUDE COSTS TO RETURN TO THE SITE AND
BE ADJUSTED BY FAA INSTALLATION PERSONNEL TO ACHIEVE BEST SIGNAL GENERATION. IF TOP ANTENNA ELEMENT IS MORE THAN
MATCHED THE ANTENNA HEIGHTS WITH THE ADJACENT GLIDE SLOPE TOWER ANTENNA HEIGHTS. ANTENNA ELEMENT LOCATIONS WILL
WITH ELEMENT CENTERED ON THE MOUNTING BRACKETS AT THE DESIGN HEIGHTS PROVIDE BY THE ELECTRONICS ENGINEER.
THE TOWER IS PLUMB. CONTRACTOR SHALL INSTALL ANTENNA MOUNTING BRACKET AND ELEMENT ASSEMBLIES (3 REQUIRED)
CONTRACTOR SHALL ERECT TOWER WITH ALTERNATING ORANGE AND WHITE COLORED SECTIONS TO FULL 50’ HEIGHT. VERIFY THAT
FOR ELECTRICAL CONTINUITY BETWEEN THE TOWER SECTIONS.
CONTRACTOR SHALL TACK-WELD THE BOLTED CONNECTIONS ON ANTENNA TOWER LEG TO WHICH GROUNDING ASSEMBLY IS ATTACHED
14.
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-GS09R-C005
C
N S
T R
U C
T
IO
ENGINEERING SERVICES
GS
GLIDE SLOPE - RUNWAY 9R
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -g s r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
ANTENNA TOWER ASSEMBLY DETAILS
| 2020-07-02T14:14:33-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:07:18-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .