ord-d-loc09r-c002.pdf
PDF 389 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials and equipment to perform the project, including installation of a localizer antenna foundation array and distribution unit. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must have successfully completed similar projects both in dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020. Offerors must include relevant past performance and experience, insurance documentation, bonding verification, and a small business subcontracting plan with their response. The anticipated period of performance is 605 calendar days beginning November 15, 2020.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -l o c r-c .d g n
/2
/2
:0
:4
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
7’-0"
8 1/4" 8 1/4"
L
5 5/8"
5 5/8"
CENTERLINE OF REAR
ANTENNA SUPPORTS
1’-3"2’-3"2’-3"1’-3"
8 13/16"
ALL CONDUITS LEAD TO HANDHOLE
SEE NOTE 7
ANTENNA C EXTENDED
C002
DISTRIBUTION UNIT AND FOUNDATION
SCALE: 3/4" = 1’-0"
2 BARE GND#
LOCALIZER
DISTRIBUTION UNIT
5’-0" 3’-0"
7"
6"
+/-5’
1%
5’ -9 7/16" +/-5’
FOUNDATION
SUPPORT
REAR ANTENNA
(TYP)
9’-4"
1’-6" (TYP)
3"
6"
MEET EXISTING GRADE
5% MAX SLOPE TO
C002
ANTENNA MOUNTING DETAILS
LIGHT (TYP BOTH ENDS)
OBSTRUCTION
DISTRIBUTION UNIT
LOCALIZER
AND GROUNDING WIRES
1 1/4" PVC FOR POWER
FOUNDATION
SUPPORT
FRONT ANTENNA
SCALE: 1/2" = 1’-0"
TO HANDHOLE
24" X 12"
6 DOWELS, #
GEOTEXTILE
3" CLEAR FROM CONCRETE SURFACES.
MAX, W/NO. 3 TIES 1’ O.C. MAINTAIN
NO. 4 GRADE 60 VERTICAL REBAR, 11" O.C.
CONTROL CONDUCTORS
3" PVC FOR SIGNAL AND
3/4" X 10’ STAINLESS STEEL
GROUNDING ROD (TYPICAL)
GUARD WIRE
1/0 AWG BARE COOPER
ALL PIERS)
(TYPICAL FOR
EL = XXXX
TOP OF FDN
L
C002
(TYP OF 38)
C002
9’-8 1/2"
17’-7"
25’-5 1/2"
33’-4"
LOCALIZER C EXTENDED
41’-2 1/2"
49’-7"
57’-5 1/2"
65’-4"
73’-8 1/2"
79’-8 1/2"
6’-0"
10’-0"
TYPICAL
(SEE SITE PLAN)
ANTENNA SPACING IS SYMMETRICAL
1%
1%
1%
1%
TOLERANCE
ELEVATION
FOUNDATION TOPS SHALL BE 1/8" MAX OF SHOWN
1/8" AND SIDE TO SIDE – 1/16" OF DIMENSION SHOWN
ANTENNA MASTS MUST BE LOCATED FRONT TO REAR –
7’-0 1/4" 7’-10 1/2" 7’-10 1/2"2’-8 1/4" 7’-10 1/2" 7’-10 1/2" 8’-4 1/2" 7’-10 1/2" 7’-10 1/2" 8’-4 1/2"
CORNER. SEE TABLE A
NORTH-WEST FOUNDATION
CORNER. SEE TABLE A
SOUTH-WEST FOUNDATION
CONCRETE FOOTING
(TYPICAL)
SUPPORT FOUNDATION
FRONT ANTENNA
CORNER. SEE TABLE A
SOUTH-EAST FOUNDATION
(TYPICAL)
SUPPORT FOUNDATION
REAR ANTENNA
CONCRETE FOOTING
SCALE: 1/8" = 1’-0"
SHELTER
TO LOC
LOCALIZER ANTENNA PLOT
GROUNDING GRID INSTALLED BY OTHERS
FOUNDATION, DUCTBANK, ROUGH GRADING AND
CENTERLINE
ANTENNA MAJOR AXIS SHALL BE WITHIN – 0.05° OF
ARRAY CENTER MUST BE WITHIN – 3" RWL CL
PLAN
L
10 3/4"
4 1/8" 4 1/8"
ANTENNA C
PARALLEL TO
ELEMENT BASE PLATE
3/8" THICK ANTENNA
NOTE 2 WITH 3/4" CHAMFER
18" DIA. CONCRETE PIER PER
CONCRETE SURFACES.
MAINTAIN 3" CLEAR FROM
REBAR W/NO. 3 TIES 1’ O.C.
NO. 4 GRADE 60 VERTICAL
SEE TABLE A
CENTER FOUNDATION
LOCALIZER DISTRIBIUTION UNIT
08’ 8’
SCALE: 1/8" = 1’-0"
16’
01’ 1’ 3’2’
SCALE: 3/4" = 1’-0"
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
NOTES:
MEET THE TOLERANCE REQUIREMENTS.
REPLACE, AT HIS OWN EXPENSE, ANY FOUNDATIONS THAT DO NOT
TOLERANCES TO THE FAA R.E. THE CONTRACTOR MUST REMOVE AND
THAT THE FOUNDATIONS AND ANCHOR BOLTS MEET THE REQUIRED
OF EACH FOUNDATION TO THE FAA RE , WITH WRITTEN CERTIFICATION
LOCATIONS AND ELEVATIONS AT THE CENTER OF ALL THE BOLT CENTERS
CONTRACTOR MUST SURVEY THE COMPLETED FOUNDATIONS AND PROVIDE
FROM THE FAA R.E. BEFORE CONSTRUCTION OF THE FOUNDATIONS. THE
AND ELEVATIONS ON SITE PRIOR TO CONSTRUCTION AND OBTAIN APPROVAL
THE CONTRACTOR MUST LAYOUT THE FOUNDATION LOCATIONS
FOUNDATIONS MUST BE CONSTRUCTED TO THE TOLERANCES NOTED.
BUILDING SHALL NOT SHARE NEUTRAL OR GROUNDING CONDUCTORS.
POWER CIRCUITS INSTALLED TO THE ANTENNA ARRAY FROM THE
PIER FOUNDATIONS.
DISTURBING THE ADJACENT SOIL WHICH MUST SUPPORT THE CONCRETE
THAN NECESSARY IN THE VICINITY OF THE ANTENNA ARRAY TO AVOID
THE CONTRACTOR MUST EXCAVATE THE DUCT BANK TRENCH NO DEEPER
INSPECTOR.
AT THE DIRECTION AND UNDER THE SUPERVISION OF FAA RESIDENT
CONTRACTOR SHALL INSTALL & ERECT THE LOCALIZER ANTENNA ARRAY
ANTENNA RACEWAY.
2 GREEN INSULATED COPPER WIRE TO GROUNDING LUG IN #CONNECT
CENTERS TO THE FAA RESIDENT ENGINEER AFTER INSTALLATION.
THE CONTRACTOR SHALL PROVIDE A SURVEY OF ALL THE BOLT
EXTEND RUNWAY CENTERLINE.
ALIGN MAJOR AXIS OF ANTENNA ARRAY PREPENDICULAR TO RUNWAY
PERSONNEL.
COIL OF 6 AWG GROUND FOR CONNECTION BY FAA INSTALLATION
THE GROUNDING LUG IN THE DISTRIBUTION UNIT AND LEAVE 3’
WIRES IN 1 1/4" PVC CONDUIT. CONNECTED 2 AWG CONDUCTOR TO
FINISH AND INSTALL 6 AWG INSULATED AND 2 AWG BARE GROUND
UP TO REAR OF ANTENNA LEGS.
THE MOUNTING PLATE LOCATIONS TO INSURE CABLEWAY SECTIONS WILL BOLT
SETTING THE ANTENNAS ON THE TOPS OF THE FOUNDATIONS AND ADJUSTING
ANTENNAS ON EITHER SIDE OF CENTERLINE SHALL BE INSTALLED FIRST,
PERSONNEL.
EQUIPMENT SHELTER FOR TERMINATION BY FAA INSTALLATION
SHALL BE LEFT AT THE DISTRIBUTION UNIT AND AT THE JUNCTION BOX ON THE
5’ LONG PIGTAILS FOR EACH SIGNAL CONDUCTOR AND CONTROL CABLE
AND CONVENIENCE OUTLET.
CONDUCTORS TO OBSTRUCTION LIGHT AT EACH END OF ANTENNA ARRAY
DISTRIBUTION UNIT ENCLOSURE AND INSTALLED 12 AWG THWN POWER
TERMINATE POWER CONDUCTORS ON TERMINAL BLOCK INSIDE
SPECIFICATIONS.
GROUNDING CONDUCTOR SHALL BE MADE USING EXOTHERMIC WELDS PER
ALL CONNECTIONS TO GROUNDING RODS AND BARE COPPER PERIMETER
FOR TWO DAYS.
FIBER FORM SHALL BE REMOVED TO 6" BELOW GRADE AFTER CURING
TOP TWO FEET OF CONCRETE PIER SHALL BE FORMED IN A FIBER FORM.
REINFORCEMENT, MATERIAL, PLACEMENT, AND CURING SPECIFICATIONS.
(RLS). SEE SPECIFICATION FAA-GL-918D FOR CONCRETE FORM WORK,
FOUNDATIONS SHALL BE STAKED BY A REGISTERED LAND SURVEYOR
GRADE WITH NO WATER-RETAINING DEPRESSIONS.
SURFACE SLOPES AWAY FROM THE FOUNDATION TO EXISTING
FLUSH WITH THE FOUNDATION TOP ELEVATION. CRUSHED ROCK
CRUSHED ROCK TO MINIMUM 6" DEPTH. THE CRUSHED ROCK SHALL BE
FABRIC PER SPECIFICATION FAA-GL-918D, AND PLACE AND COMPACT
CONTRACTOR SHALL COMPACT SUBGRADE, PLACE GEOTEXTILE
TOPSOIL SHALL BE STRIPPED FROM AREA TO RECEIVE CRUSHED ROCK.
ITEMS APPLY
ONLY CLOUDED
C002 SCALE: 1 1/2" = 1’-0"
ANTENNA BASE PLATE INSTALLATION
STAINLESS WASHER (TYPICAL)
2" SQUARE X 1/4" THICK
WITH TOP OF COCRETE PIER
GRAVEL PLOT SHALL BE FLUSH
BASE PLATE
3/8" THICK ANTENNA ELEMENT
GROUND
LEAVE 6" ABOVE
BOLT W/4" HOOK.
FULL THREAD ANCHOR
5/8" STAINLESS STEEL,
FLUSH WITH FINISHED GRADE
SET NO. 5 REBAR 36" LONG
ANTENNA REFERENCE POINT.
PERIMTER COUNTERPOISE
4/0 BARE COPPER
PLOT PER NOTE 1
CRUSHED ROCK
CORNER. SEE TABLE A
NORTH-EAST FOUNDATION
STEEL GROUNDING ROD (TYP)
3/4" x 10’ STAINLESS
ANTENNA TROUGH (TYP BOTH ENDS)
CONDUCTOR AND BOND TO
2 AWG BARE GROUNDING
FINISHED GRADE. (TYPICAL BOTH ENDS)
SET NO. 5 REBAR 36" LONG FLUSH WITH
AND 12 PR
LDF 4.5-50 COAX CABLE
FOUR 5/8" COMMSCOPE
CONDUITS TO CONTAIN
TWO 4" PVC COATED GRS
COUNTERPOISE
4/0 PERIMETER
CONNECTORS MEET SPECS. (TYP)
CONNECTOR. BURNDY GAR-SERIES
COUNTERPOISE AND TO GROUNDING
2 AWG BARE GND TO #CONNECTED
GROUND WIRE. SEE NOTE 4
ONE 6 AWG INSULATED
8 AWG TYPE U.S.E AND#1/C
EACH CXONTAINS FOUR
1 1/4" PVC COATED GRS CONDUIT
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-LOC09R-C002
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
LOC
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -l o c r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LOCALIZER - RUNWAY 9R
ANTENNA FOUNDATION INSTALLATION DETAILS
| 2020-07-06T09:38:06-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:27:05-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .