Attachment No. 14 - Ground Resistance Testing Form.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Establishment of the NAVAIDS Facilities Serving Extended Runway 9R-27L at O'Hare International Airport, Chicago, Illinois
Solicitation number
697DCK-20-R-00436
Issued by

About this file

This document includes a ground resistance testing form template and details of a federal contract opportunity for construction services. The contract is for establishment of NAVAIDS facilities serving an extended runway at O'Hare International Airport in Chicago, Illinois. The opportunity involves providing all labor, materials, equipment, and construction services to complete the project in accordance with drawings, specifications and contract terms. The performance period is 605 calendar days with an anticipated start of November 15, 2020. The estimated price range for the procurement is between $5 million and $10 million. Offerors must meet minimum experience requirements and submit all required documents by the closing date of October 7, 2020, including past performance references, schedules, financial information, insurance documentation and subcontracting plans. The solicitation is being conducted by the Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ground Resistance Test Form

TECHNICAL REFERENCELocation (City / State)Date PreparedPage No.
DATA RECORD
Cost Center CodeLocation Ident.Facility Alpha CodeFacility Ident. CodeSCFTM
Reference Handbook / Directive for: GROUND RESISTANCE TESTING
FAA-STD-019f Change 1 Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Facilities and Electronic Equipment, Ref 4.4.2
FAA-HDBK-010 Change 1 Recommended Practices and Procedures for Lightning and Surge Protection, Grounding, Bonding and Shielding Implementation, Ref. 3.9.1 and 4.2.3
FAA-HDBK-011 Fundamental Considerations of Lightning and Surge Protection, Grounding, Bondind and Shielding, Ref. 3.4.3
Equipment Used:Type of Test:Date of Test:Soil Condition:
Humidity:Temperature:Dimension of Ground Grid:"C" Probe Spacing (C1,C2):250.0
Depth of Probes (C2, P2):Calculated Ground Resistance:3.02 OhmsComments:
FIELD DATA FOR GROUND RESISTANCE TESTING
Distance from Grid (C1 to P2) Calculated FeetResistance (from Meter) Ohms
P21 = 0.1C =250.80
P22 = 0.2C =501.12
P23 = 0.3C =751.60
P24 = 0.4C =1002.00
P25 = 0.5C =1252.30
P26 = 0.6C =1502.70
P27 = 0.7C =1754.30
P28 = 0.8C =2005.80
P29 = 0.9C =2258.40
The theoretical earth resistance is at 62% of the current probe distance.
The 62% distance of this test is:155.0

Sketch the Ground Grid Plot below and indicate the position and direction of this test.

(Compass Orientation can be rotated as needed.)

Ground Resistance Plot

Measured Resistance 25 50 75 100 125 150 175 200 225 0.8 1.1200000000000001 1.6 2 2.2999999999999998 2.7 4.3 5.8 8.4 62% Resistance Point 155 10 Distance from Ground Grid (Ft)

Resistance (Ohms)

Instructions

NOTES:
1. All areas to be filled in by the user are shaded in a light bluish gray. All other cells are locked and cannot be selected to protect the template.
2. Each time you open this template and edit it, it will automatically save as a new, separate document. The template will retain its original condition for future use.
3. It is recommended that you input the ground grid area in as a plot: A' x B' first. Then calculate the distance you want to position the current probe, C2.
To obtain at least 90% accuracy on the ground resistance, the distance you use for the current probe (C2) from the point of connection to the EES [labeled as the "C" Probe Spacing (C1, C2) on the form] is recommended to be either 3 times the longest diagonal in your plot (diagonal = the square root of (A2 + B2), or, if the plot is very large, then one to two times the distance of the longest side of your plot. This is taken from FAA-HDBK-011 Chapter 3.4.3.

4. Perform the test and record your resistance measurements for each P2 position in the table on the left of the chart. The chart will automatically update and the template will calculate the theoretical earth ground resistance at a P2 position that is 62% from the EES connection for your plot and automatically fill this value in the cell labeled "Calculated Ground Resistence". This is the official results of your test.

5. Finally, you'll notice I already have values on the form. This is so you can see how the chart plots and calculates. Go ahead and punch in some new numbers and distances to test out the form. Use old data that you have to check the form's calculated outputs.

A (ft) B (ft) image1.png

File details come from the government source that posted it. Updated .