About this file

This federal solicitation is seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The services include providing all labor, materials, equipment, and supervision to construct new facilities in accordance with drawings and specifications. The estimated price range for the project is $5-10 million. Interested firms must have experience on similar airport projects both in size and complexity. The performance period is 605 calendar days starting November 15, 2020. Offers are due by October 7, 2020 and must include documentation of relevant past performance, insurance, bonding capacity, and a small business subcontracting plan. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -l o c l-c .d g n

/2

/2

:4

:2

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

9-WAY 5" CECO DUCTBANK

EM-OH6144.200.420-02

EM-OH6144.200.420-01

EM-OH6144.200.420-03

CE-OH6144.200.420-03

.0

CB-H6133.331-409

18"

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

COMM

HV

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

E L

V

EM-OH6144.200.420-74

EH-OH6144.200.420-66

EH-OH6144.200.420-65

EH-OH6144.200.420-69

EH-OH6144.200.420-56EH-OH6144.200.420-52

EH-OH6144.200.420-54

EH-OH6144.200.420-53

EH-OH6144.200.420-55

EH-OH6144.200.420-50

EH-OH6144.200.420-51

LOCALIZER

FFM

IM

EH-OH6144.200.420-73

200.420-68

EM-OH6144.

200.420-71

EH-OH6144.

200.420-72

EH-OH6144.

.200.420-70

EM-OH6144

FFM

200.420-78

EH-OH6144.

200.420-67

EH-OH6144.

VB-0H6134.710.371.106

FH-0H6134.710.371.107

LOCALIZER SHELTER

ALSF-2 /

LOCATION FOR THE

BUILDING

IN FUTURE

CONTINUATION

4(4") FAA-SEC

4 (4") COMm

8-WAY- 4"CED

COMM

LV

COMM

COMM

HV

COMM

HV

LV

COMM

LV

COMM

MH-OH6143.710.371-05

CB-H6133.331-410

FH-0H6134.710.371.108

COMM

HV

COMM

LVHV

COMM

HV

CE-OH6144.200.420-01

CE-OH6144.200.420-02

HV

LV

LV

COMM

HV

H V L V

COMM

COMM

HV

LV

HV

COMM

HV

LV

COMM

HV

LV

COMM

HV

LV

COMM

LV

COMM

HV

LV

LV

HV

COMM

HV

HV HVHV

LV

HV

ATT - 12(4")

COMM - 6(4")

MH-OH6143.710.371-06

CB-OH6143.710.371-07

1-12’x8’ BOX CULVERT

CE OH 6134.710.371.113

COMM - 6(4")

ATT - 12(4")

CB-OH6143.710.371-02

MH-OH6143.710.371-02

MH-OH6143.710.371-03

CB-OH6143.710.371-04

MH-OH6143.710.371-01

MH-H6133.331-404

60" RCP

FH-0H6134.710.371.106

T OH 6134.200.420.107 (TFR)

MH-OH6143.710.371-07

CB-OH6143.710.371-08

ATT - 12(4")

CE OH 6134.710.371.111

COMM - 6(4")

LOCALIZER CRITICAL AREA

EH-OH6144.200.420-79

CE OH 6134.710.371.112

EH-OH6144.200.420-75

6 (2") POWER

6-WAY- FAA

18"

H

H

H H

H

H

H

H

H

H

H

H

H

H

H

H

2 (2") COM-FL

2 (2") LV-FL

6 (2") HV-ALSF

10-WAY-2" FAA

DUCTBANK BY OTHERS.

DUCTBANK.

CONCRETE ENCASED

GROUND IN 2" PVC

AND 1-1/C #6 GREEN

5/8" HELIAX CABLE

INSTALL

& SUPPORT

FFM ANTENNA

INSTALL

NEMA 4X

CBL. JCT. BOX

12"X16"X6" D

INSTALL

1083.71’

(24" DEEP)

#4/0 BARE

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-LOC27L-C007

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

LOC

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -l o c l-c .d g n

SITE PLAN

NOTES:

ITEMS APPLY

ONLY CLOUDED

LKN

ABANDON IN PLACE

FENCE

WATER DISTRIBUTION

TELEPHONE

COMED DUCTBANK

FUELING FACILITIES

NATURAL GAS

AND REMOVE)

DEMO (DEMOLISH

CATCH BASIN

DRAINAGE MANHOLE

FIRE HYDRANT

ELECTRICAL HANDHOLE

MANHOLE

MJ GATE VALVE

SANITARY SEWER

STORM SEWER

PIPE UNDERDRAIN

DUCTBANK

COMMON ELECTRICAL

SANITARY MANHOLE

COMED/AT&T MANHOLES

AIRFIELD ELECTRIC

MANHOLE CLUSTER

FAA, COMM, AIRFIELD

FAA DUCTBANK

STRUCTURE AND BASE

ALSF-2 ELEVATED LIGHT

SEQUENCED FLASHER

AND BASE WITH

LIGHT STRUCTURE

ALSF-2 APPROACH

TSA = TAXIWAY SAFETY AREA

RSA = RUNWAY SAFETY AREA

ABBREVIATIONS:

T

G

CECO

W

ST

SA

SD

F

FAA

CED

UTILITY LEGEND

CENTER OF DISTRIBUTION UNIT.

PLANE: 20’ AT LEAST. CONDUITS TO ROUTE INTO

ROUTED WITH VERY LONG SWEEPS IN THE HORIZONTAL

ALL CONDUITS WITH HELIAX CABLES MUST BE 5.

FOUNDATION BY OTHERS.

LOCALIZER ANTENNA INSTALLATION DETAILS.

SEE SHEETS ORD-D-LOC27L-C001 THRU C006 FOR 4.

DETAILS. FOUNDATION BY OTHERS.

SEE SHEET ORD-D-IM27L-C001 (FFM) INSTALLATION3.

PROPER INSTALLATION OF ALL FACILITIES.

COORDINATE WITH CITY CONTRACTOR TO INSURE2.

TERMINATE CONDUITS, INSTALL ANTENNAS.

BY OTHERS. FAA CONTRACTOR TO PULL CABLES

FFM & LOC FOUNDATIONS ARE CONSTRUCTED

THE ALSF LIGHT LANE, ALL DUCT BANKS, ROADS1.

ELV

ELV

FAR-FIELD MONITOR - RUNWAY 27L

2020-07-06T09:45:19-0500
RAFAEL CRAME
2020-07-09T16:38:13-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .