ord-d-ald09r-g004.pdf
PDF 2 MB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract documents, drawings, and specifications over a 605 calendar day period with an anticipated start date of November 15, 2020. Interested firms must demonstrate experience completing similar projects between $5,000,000 and $10,000,000 at an operational airport. Offers are due by October 7, 2020 and must include details on past performance, financial capability, insurance, bonding, and small business subcontracting plans. The Federal Aviation Administration Southwestern Region is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ld r-g .d g n
/2
/2
:0
:3
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
JOHNSON ROAD
LOCALIZER
RWY 9R
R/W 27L PAPI
ONLY
ONLYONLY
ONLY
ONLY
ONLY
ONLY
ONLY
23+00
25+00
ONLY
ONL
Y
ONL
Y
ONLYONLY
ONLY
ONLY
ONLY
ONL
Y
ONL
Y
ONLYONLY ONLY
ONLY
ONLY
ONLY
ONLY
ONLY ONLY
ONLY
ONLY ONLY
ONL
Y
ONL
Y
ONL
Y
ONL
Y
ONL
Y
ONL
Y
ONLY
ONLYONLY ONLY
ONLYONLY
ONLY
ONLY
ONLY
O N
L Y
ONLY
ONLY
ONL
Y
ONLY
CANOPY
SIGN
SIGN
SIGN
GATE
SIGN
SIGN
SIGN
SIGN
W.E.
SIGN
SIGN
SIGN
SIGN
SIGN
PILE
PILE
PILE
PILE
PILE
PILE
PILE
PILE
PILE
PILE
AREA UNDER CONSTRUCTION
AREA UNDER CONSTRUCTION
RIP RAP
GATE
RIP RAP
RIP RAP
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
GATE
CONVERYORS
CONVERYORS
STOCKPILE
STOCKPILE
STOCKPILE
STOCKPILE
STOCKPILE
TANKS
SIGN
PILES
ROCK PILE
STOCKPILE
BILLBOARD STOCKPILE
O F F S E T .0 ’ R
T
S T A .9
O F F S E T .2 ’ R
T
S T A .0
O F F S E T .9 ’ R
T
S T A .1
O F F S E T .0 ’ L
T
S T A .7
O F F S E T .0 ’ R
T
S T A .3
E X
IS
TI
N
G F
E N C E
C O
N N E C T
TO
E X
IS
TI
N
G F
E N C E
C O
N N E C T
TO
O F F S E T .6 ’ L
T
S T A .6
R A
D
IU
S
O F F S E T .1 ’ L
T
S T A .8
O F F S E T .0 ’ L
T
S T A .9
O F F S E T .0 ’ L
T
S T A .1
E 1094279.12
N 1939590.78
E 1094102.93
N 1939706.67
SIGN
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
BB
BB
TANK
TANK
TANK
TANK
TANK
TANK
TANK
T
T
T
TANK
TANK
TANK
T
T
TANKS
T
T
T
T
T
T
T
T
T
T
T
T
T T
T T
T
T
T
TANKS
T
T
T
T T
T
T
T
T
T
T
SIGN
BILLBOARD
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
BILLBOARD
S
IG
N
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
BILLBOARD
BILLBOARD
BILLBOARD
TANK
BILLBOARD
BILLBOARD
TANK
SIGN
BILLBOARD
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
T
TANK
TANK
T T
T
RW 9R-27L
R/W 27L ALSF-2
LIGHT LANE
R/W 27L ALSF-2
LIGHT LANE
R/W 9R ALSF-2
R/W 9R ALSF-2
ACCESS GATE
CONSTRUCTION
POST-12
ACCESS ROUTE
CONSTRUCTION
EQUIPMENT SHELTER
AND 9R LOCALIZER
RWY 27L ALSF-2
LOCALIZER
R/W 27l
30102362646 026GROUND SHOT
30103072646 276GROUND SHOT
30102363646 462GROUND SHOT
30103076646 552GROUND SHOT
EDGE OF SIDEWALK
R/W 9R PAPI
SHELTER
LOCALIZER EQUIPMENT
RWY 9R ALSF-2 AND 27L
MID-POINT RVR
R/W 9R-27
TW D
RW 9C-27C
CRITICAL AREA
RW 9R-27L LOCALIZER
ACCESS GATE
CONSTRUCTION
FROM POST 1 -
SLOPE AND TD RVR
R/W 9R GLIDE
CRITICAL AREA
GLIDE SLOPE
R/W 9R
SLOPE AND TD RVR
RWY 27L GLIDE
SHELTER
ALSF-2 EQUIPMENT
EXISTING R/W 27L
TW E
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
RC 10/31/2019 1898272
ORD-D-ALD09R-G004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALD
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
o rd -d -a ld r-g .d g n
UTILITIES:
STAGING AREA:
AIRPORT OPERATIONS:
CONSTRUCTION ACTIVITY:
NEEDING THE UTILITY OWNER TO LOCATE THE UTILITY.
THE CONTRACTOR MUST NOTIFY THE RESIDENT ENGINEER, IN WRITING, 5 DAYS PRIOR TO
UNION PACIFIC RAILROAD CO.-GARY WILWERDING-(708)649-5210
WEST SHORE-MIKE GRAHAM-(918)-495-5894
SHELL OIL CO.-RICH ALMAQUER-(847)439-4603
BP AMOCO OIL CO.-JIM SWAPMAN-(847)824-5176
DOUGLAS WAHL/MIKE LOVERIDGE-(773)686-7500
FUEL LINES/FARMS-AIRPORT GROUP INTERNATIONAL
CITY OF CHICAGO COMMUNICATION-(773)686-2321
NSMJAWA-STEVE PITTMAN-(773)686-0077
COORDINATING ENGINEER-LARRY PINATO-(773)894-5404
COMMUNICATIONS-KEN WARRICK-(773)894-5358
ELECTRICAL-JOHN SISCO-(773)686-2320
WATER/SEWER-PAUL BROWN-(773)686-7310
CITY OF CHICAGO (DOA)
TELEPHONE-AT&T-MICHAEL CARNEY-(630)941-4246
ELECTRIC-COMMONWEALTH EDISON (COMED)-DANIEL STARZEC-(708)410-5052
NICOR INC.-NORTHERN ILLINOIS GAS CO.-DUC LE (708)544-5707 EXT. 262
NATURAL GAS PIPELINE CO.-(312)691-3855
GAS-PEOPLE’S ENERGY-THOMAS NASH-(773)395-4229 AND DAN CEMPEL-(773)794-6867
DIGGER-(312)744-7000
JOINT UTILITY LOCATING INFORMATION FOR EXCAVATORS (J.U.L.I.E.)-(800)892-0123
NATIONAL AIRSPACE PLANS AND PROGRAM MANAGER-(773)601-7600
THE WORK SO THAT THE OWNERS MAY LOCATE AND STAKE THEIR UTILITIES.
THE CONTRACTOR MUST CONTACT THE OWNERS OF ALL UTILITIES PRIOR TO THE START OF
AND COMMUNICATIONS CABLES, WATER AND FUEL LINES AND SEWER AND DRAINAGE LINES.
LIMITED TO THE FOLLOWING: CITY, FAA, AT&T, PEOPLE’S GAS, CECO POWER, CONTROL
DURING THE PROSECUTION OF THE WORK. THESE UTILITIES INCLUDE, BUT ARE NOT
ALL EXISTING UTILITIES SERVING THE AIRPORT MUST REMAIN IN CONTINUOUS OPERATION
MUST PERFORM THE EXCAVATION BY HYDRO EXCAVATING OR HAND DIGGING.
FAA UTILITY LINES BE LOCATED. WHEN LOCATING EXISTING UTILITIES, THE CONTRACTOR
CONTRACTOR MUST SUBMIT AN "FAA LOCATE REQUEST FORM" TO REQUEST THAT
THE CONTRACTOR MUST UTILIZE A UTILITY LOCATOR DURING EXCAVATION. THE
AND THE GENERAL OPERATION OF THE AIRPORT.
OFFER THE LEAST OBSTRUCTION AND/OR IMPEDIMENT TO AIRPORT TRAFFIC
WILL REQUIRE THE COMPLETION OF ALL WORK HEREIN SPECIFIED SO AS TO
AN ESSENTIAL FEATURE OF THIS CONTRACT AND THE CONTRACTING OFFICER
THIS CONTRACT IS TAKING PLACE. TIMING AND COORDINATION OF THE WORK IS
CHICAGO O’HARE AIRPORT WILL BE IN OPERATION WHILE CONSTRUCTION UNDER
DESIRED ACCESS DATE. FORM IS AVAILABLE THROUGH THE FAA RE.
REQUESTING ACCESS TO THE FAA FACILITY FIVE WORKING DAYS PRIOR TO
OFFICE. CONTRACTOR SHALL SUBMIT A "REQUEST FOR FAA ASSISTANCE" FORM
ACCESS TO FAA FACILITIES MUST BE COORDINATED WITH THE LOCAL FAA SSC
DIRECTED BY THE CONTRACTING OFFICER.
EQUIPMENT, MACHINERY, AND MATERIALS SHALL BE BARRICADED AND LIGHTED AS
FROM THE SITE OF THE WORK ALL EQUIPMENT, MACHINERY, AND MATERIALS. ALL SUCH
WHEN SO ORDERED BY THE CONTRACTING OFFICER, THE CONTRACTOR SHALL REMOVE
SNOW FENCE.
LIMITS OF CRITICAL AREAS NEAR THE WORK AREA SHALL BE DELINEATED WITH ORANGE
THE AIR TRAFFIC CONTROL TOWER OR FLIGHT CREWS.
ALL LIGHTING WILL BE SHIELDED BY THE CONTRACTOR SO THAT IT DOES NOT AFFECT
FOR USE AT ALL TIMES.
AND PIECE OF EQUIPMENT SHALL HAVE A ROTATING YELLOW BEACON MOUNTED ON THE ROOF
IT IN A VERTICAL AND CLEARLY VISIBLE POSITION A WARNING FLAG. IN ADDITION, EACH VEHICLE
OR OTHER PIECE OF EQUIPMENT BELONGING TO THE CONTRACTOR SHALL HAVE ATTACHED TO
SHALL DISPLAY A FLAG WHICH SHALL BE MAINTAINED VERTICAL AT ALL TIMES. EACH VEHICLE
IN ALL WORK AREAS, REGARDLESS OF WHETHER OR NOT NEAR RUNWAYS, TAXIWAYS OR APRONS, FOR PERSONAL USE. EACH SEPARATE GROUP OR INDIVIDUAL VEHICLE AND EQUIPMENT ITEM
WHITE, THREE FOOT SQUARE, FOR VEHICLES AND EQUIPMENT USE AND ONE FOOT SQUARE
THE CONTRACTOR SHALL FURNISH AIRCRAFT WARNING FLAGS, COLORED ORANGE AND
COORDINATE THE ACTIVITIES OF THE AIRPORT AND CONTRACTOR.
CLOSING OF ANY AREA SO THAT THE AIRPORT OPERATIONS PERSONNEL CAN PROPERLY
AIRFIELD. THE CONTRACTOR SHALL NOTIFY THE REPRESENTATIVE TO REQUESTING THE
OFFICER, MUST BE IN CONSTANT COMMUNICATION TO INSURE SAFE OPERATIONS ON THE
THE CONTRACTOR AND AIRPORT OPERATIONS PERSONNEL, THROUGH THE CONTRACTING
DURING THE PERIOD OF CONSTRUCTION.
THE CONTRACTOR MUST MAINTAIN DRAINAGE TO PREVENT PONDING OR FLOODING
& DETERMINED WITH CITY CPS AT PRE-CONSTRUCTION.
THE CONTRACTOR STAGING AREA SHALL BE LOCATED WILL BE DISCUSSED
EXTRA COSTS OR TIME EXTENSIONS DUE TO SUCH STOPPAGE OF WORK.
SERVICE IS RESTORED. THE CONTRACTOR WILL NOT BE ALLOWED TO MAKE CLAIMS FOR
CONTRACTING OFFICER IN WRITING. THE CONTRACTOR WILL HALT ALL OPERATIONS UNTIL
ALL CONTRACT WORK MUST BE SUSPENDED UNLESS OTHERWISE DIRECTED BY THE
TYPES CABLES OR UTILITIES ARE OUT OF SERVICE DUE TO THE CONTRACTOR’S OPERATIONS,
AND AT THE CONTRACTOR’S EXPENSE. DURING THE PERIOD OF TIME THAT THE ABOVE
WILL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR, UNDER THE OWNER’S DIRECTION,
EXISTING UTILITY LINE THAT IS DAMAGED DURING THE PERFORMANCE OF THIS CONTRACT
THE EXCAVATION BY HYDRO EXCAVATING OR BY HAND DIGGING ANY CABLE OR OTHER
EXISTING CABLES OR OTHER EXISTING UTILITY LINES. THE CONTRACTOR MUST PERFORM
SPECIFICATIONS FOR DIG BOOK REQUIREMENTS. WHEN EXCAVATING WITHIN 5 FEET OF
AVIATION. THIS COMPILATION IS REFERRED TO AS THE "DIG BOOK". SEE SUPPLEMENTAL
PREPARE AND SUBMIT ALL DOCUMENTS REQUIRED BY THE CITY OF CHICAGO DEPT. OF
EXCAVATION ON THE AIRPORT UNDER THIS PROJECT WILL REQUIRE THE CONTRACTOR TO
COMPLY WITH ALL FAA PART 139 TRAINING REQUIREMENTS AND REGULATIONS.
BY THESE PLANS AND SPECIFICATIONS, WILL APPLY TO THE WORK. CONTRACTOR SHALL
CONTAINED IN FAA ADVISORY CIRCULAR 150/5370-2F OR NEWER AND AUGMENTED
THE CONTRACTOR IS ADVISED THAT CERTAIN RULES AND RESTRICTIONS, AS
0600’ 600’ 1200’
SCALE: 1" = 600’
STAGING AREAS OR AS DESIGNATED BY THE RESIDENT ENGINEER.
THE CONTRACTOR SHALL STORE ALL EQUIPMENT, VEHICLES, AND MATERIALS ONLY IN THOSE
CONTRACT WORK AREA
CLOUDED ITEMS INDICATE
RUNWAY 9R-27L NAVAIDS
CONSTRUCTION AND SAFETY PLAN
1.
2.
1.
1.
3.
LIMIT LINES.
WHEN THE WORK AFFECTS A CABLE, SEWER, OR OTHER UTILITY WITHIN THE CONTRACT
THE CONTRACTOR INTENDS TO PROTECT, SHORE, SUPPORT, BRACE, ETC., EXISTING UTILITIES
ENGINEER WHICH CLEARLY AND ACCURATELY DEPICT THE METHODS AND MEANS BY WHICH
THE CONTRACTOR MUST PREPARE AND SUBMIT CONSTRUCTION DRAWINGS TO THE RESIDENT
4.
WILL BE MADE FOR ANY SUCH INTERFERENCE OR OBSTRUCTION.
STRUCTURE TO THE SATISFACTION OF THE CONTRACTING OFFICER. NO EXTRA PAYMENT
CONSTRUCTION, THE CONTRACTOR WILL MAKE REPAIRS OR PAY FOR REPAIRS TO THE
FOR THE PROTECTION OR RELOCATION OF SUCH STRUCTURES. IF DAMAGED DURING
THE CONTRACTOR WILL MAKE ALL ARRANGEMENTS WITH THE CONTRACTING OFFICER
ENCOUNTERED DURING CONSTRUCTION MUST BE PROPERLY SUPPORTED AND MAINTAINED.
CORRECT, OR COMPLETE. ALL STRUCTURES ABOVE OR BELOW GROUND THAT ARE
CONTRACTOR, BUT MUST NOT BE CONSTRUED AS BEING ABSOLUTELY ACCURATE,
UPON AVAILABLE RECORDS AND ARE SHOWN ON THE PLANS STRICTLY AS AN AID TO THE
MATERIAL, AND DIMENSIONS OF EXISTING FACILITIES AND OBSTRUCTIONS ARE BASED
EXISTING UTILITIES MUST BE MAINTAINED IN SERVICE AT ALL TIMES. THE LOCATION,
CORRECT. THE CONTRACTOR WILL VERIFY THE FEATURES PRIOR TO CONSTRUCTION.
CONCERNING FEATURES AND UTILITIES IS NOT GUARANTEED TO BE ALL INCLUSIVE OR
EXISTING CONDITIONS TAKEN FROM THE BEST AVAILABLE SURVEY. INFORMATION SHOWN
5.
RESIDENT ENGINEER.
BY THE RESIDENT ENGINEER. NO ITEM WILL BE DEMOLISHED UNTIL APPROVED BY THE
ALL ITEMS PROPOSED FOR DEMOLITION MUST BE MARKED BY THE CONTRACTOR FOR REVIEW
6.
BY THE RESIDENT ENGINEER.
RESIDENT ENGINEER. NO ITEM WILL BE CONSTRUCTED UNTIL THE LOCATION IS APPROVED
THE CONTRACTOR MUST LAY OUT THE LOCATION OF ALL NEW ITEMS FOR REVIEW BY THE
7.
CONDITIONS.
ACCORDANCE WITH THE PROVISIONS OF THE APPROPRIATE SECTION OF THE GENERAL
THE CONTRACTING OFFICER WILL REVIEW THE SHOP DRAWINGS AND PROCEDURES IN
8.
REVIEWED THE SHOP DRAWINGS AND PROCEDURES FOR PROTECTION OF THE UTILITY.
RIVATE UTILITY CABLES, PIPELINES, OR SEWERS UNTIL THE RESIDENT ENGINEER HAS
WORK WHICH MAY AFFECT EXISTING CITY, FAA, AT&T, CECO, PEOPLES GAS, OR OTHER P
IN ACCORDANCE WITH THE GENERAL CONDITIONS, THE CONTRACTOR WILL NOT START ANY
9.
REPLACED BY THE CONTRACTOR AT THE CONTRACTOR’S EXPENSE.
ALL AIRFIELD LIGHTING DAMAGED BY CONSTRUCTION OPERATIONS WILL BE REPAIRED OR
10.
CHANNELS. THE UTILITY NAME AND TYPE MUST BE IDENTIFIED ON THE FENCE.
INSTALL PROTECTIVE ORANGE SNOW FENCE TO FURTHER DEMARCATE PROTECTED UTILITY
PLACEMENT OF ADDITIONAL PAINT TO CLEARLY IDENTIFY THE UTILITY FOR WORKERS.
FLUORESCENT PAINT. THE RESIDENT ENGINEER RESERVES THE RIGHT TO REQUEST THE
THE CONTRACTOR MUST MARK EXPOSED UTILITY LINES WITH AN ADEQUATE AMOUNT OF
11.
12.
AND IF THE ARTIFICIAL LIGHT PROVIDED IS SUFFICIENT.
WILL HAVE THE FINAL DETERMINATION ON WHETHER OR NOT ARTIFICIAL LIGHTING IS NEEDED, LIGHT IS AVAILABLE WHEN EXCAVATING NEAR EXISTING UTILITIES. THE RESIDENT ENGINEER
CONTRACTOR MUST TAKE EXTRA PRECAUTIONS TO ENSURE THAT MORE THAN SUFFICIENT
ILLUMINATE WORK AREAS DURING NIGHT WORK OR DURING LOW-LIGHT HOURS. THE
THE CONTRACTOR MUST PROVIDE AN ADEQUATE NUMBER OF LIGHT PLANTS TO PROPERLY
13.
UTILITIES HAVE BEEN UPDATED.
CONTRACTOR’S DEDICATED UTILITY PERSON MUST VISIT THE SITE TO ENSURE THAT THE
WHEN THE RESIDENT ENGINEER ASKS FOR A "REFRESHING" OF THE UTILITY LOCATES, THE
14.
NUMBER OF THIS PERSON MUST BE PROVIDED TO THE CONTRACTING OFFICER.
MONITOR THESE CONSTRUCTION ACTIVITIES. THE NAME AND 24 HOUR CONTACT PHONE
EXISTING UTILITIES, THE CONTRACTOR MUST HAVE A DEDICATED UTILITY PERSON ON SITE TO
DURING EXCAVATING OR DURING OTHER CONSTRUCTION ACTIVITIES ADJACENT TO OR NEAR
15.
2.
2.
3.
TRAFFIC.
REQUIREMENT WILL APPLY WHETHER THE PAVEMENT IS OPENED OR CLOSED TO AIRCRAFT
PARK VEHICLES/EQUIPMENT OR STORE MATERIALS ON ANY AIRFIELD PAVEMENT. THIS
THE CONSTRUCTION OPERATION. IN NO CASE WILL THE CONTRACTOR BE PERMITTED TO
AIRCRAFT AND VEHICLES USING THE FIELD WILL NOT BE SUBJECTED TO HAZARDS DUE TO
CONSTRUCTION WORK AND SHALL SO UTILIZE HIS MACHINERY AND EQUIPMENT SO THAT
COMPLETING THEIR RESPECTIVE WORK. THE CONTRACTOR SHALL SO HANDLE
DOING WORK ON OR ABOUT THE CONTRACT SITE TO THE MUTUAL BENEFIT OF ALL IN
THE CONTRACTOR SHALL COOPERATE IN EVERY WAY WITH ANY OTHER CONTRACTOR
4.
5.
TO THE VARIOUS WORK SITES.
AND/OR MAINTENANCE OF ALL HAUL ROADS TO AND FROM THE DESIGNATED ENTRANCE
AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION, REPAIR,
THE PLANS. NO PERSONAL VEHICLES WILL BE PERMITTED WITHIN THE AIR OPERATIONS
ENTER AND LEAVE THE CONTRACT SITE VIA THE GATES AND ROUTES DESIGNATED ON
EQUIPMENT, SUPPLIES, AND WORKING PERSONNEL NECESSARY TO DO THE WORK SHALL
THE CONTRACTOR SHALL PLAN HIS CONSTRUCTION OPERATION SO THAT MATERIAL,
6.
IMPEDE THE PROGRESS OF THE WORK.
TO THE PHASING OF THE WORK, OR DUE TO NORMAL WEATHER CONDITIONS WHICH MAY
COMPLETION FOR THE PROJECT, OR ANY PHASE OF THE PROJECT WILL BE ALLOWED DUE
THESE SPECIFICATIONS: NO ADDITIONAL COMPENSATION OR EXTENSION OF TIME OF
IN ESTABLISHING THE SCHEDULE FOR THIS CONTRACT, THE CONTRACTOR IS TO CONSIDER
OF 10:00 P.M. AND 6:00 A.M.
B. NIGHT TIME WORK - WORK TO BE ACCOMPLISHED BETWEEN THE HOURS
SATURDAYS, SUNDAYS, AND HOLIDAYS.
A. CALENDAR DAY - EVERY DAY SHOWN ON THE CALENDAR. INCLUDING
SHALL BE INTERPRETED AS FOLLOWS:
CONSTRUCTION WHERE THESE SPECIFICATIONS GOVERN, THE INTENT AND MEANING
CONTRACT, OR IN ANY DOCUMENTS OR OTHER INSTRUMENTS PERTAINING TO
WHENEVER THE FOLLOWING TERMS ARE USED IN THESE SPECIFICATIONS, IN THE 7.
UTILITIES PRESENT, AND THE CONTRACTOR’S PLAN TO PROTECT AND AVOID THESE UTILITIES.
UTILITIES WITHIN THE CURRENT WORK ZONE ARE LOCATED, THE TYPE, SIZE AND NUMBER OF
EVERY TOOLBOX SAFETY MEETING MUST INCLUDE A DISCUSSION OF WHERE THE EXISTING
1.
2.
8.
9.
AIRPORT AUTHORITIES TO KEEP THE AIRPORT IN OPERATION.
REFUSED FOR LIMITED PERIODS OF TIME. THE CONTRACTOR MUST COOPERATE WITH
TO THE FACT THAT ACCESS TO CERTAIN CONTRACT AREAS MAY BE LIMITED AND/OR
EVERY TIME AN ACTIVE RUNWAY IS CROSSED. THE CONTRACTOR’S ATTENTION IS CALLED
THE CONTRACTOR WILL BE ASSESSED A FINE BY THE AIRPORT AUTHORITY EACH AND
CANNOT CROSS ANY ACTIVE RUNWAY OR TAXIWAY TO DELIVER MATERIAL OR WORKMEN.
ALL OF THE WORK UNDER THIS CONTRACT IS IN RESTRICTED AREAS. THE CONTRACTOR
CLEANERS ON SITE AT ALL TIMES.
THE CONTRACTOR MUST HAVE A MINIMUM OF TWO (2) OPERATING POWER VACUUM
RESTORED TO ITS ORIGINAL CONDITION BY THE CONTRACTOR AT HIS OWN EXPENSE.
AT ALL TIMES. ANY AREA DAMAGED DURING CONSTRUCTION SHALL BE IMMEDIATELY
THAT ARE USED OR CROSSED BY CONSTRUCTION VEHICLES BE KEPT CLEAR OF DEBRIS
THE CONTRACTOR SHALL MAKE SURE ALL TAXIWAYS, RUNWAYS, ROADS, AND APRONS
10.
TO AIRPORT OPERATIONS.
AIRPORT AND THEIR FAILURE DUE TO CONSTRUCTION ACTIVITY MAY CAUSE DISRUPTION
ARE CRITICAL TO THE OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION OF THE
EQUIPMENT HOUSES, DIRECT BURIED CABLES, AND DUCT BANKS. ALL THESE FACILITIES
OVER EARTH AREAS WILL OCCUR OVER, AROUND AND UNDER FAA FACILITIES SUCH AS
EXCAVATION FOR PAVEMENT OR STRUCTURES, SITE GRADING, AND VEHICULAR TRAFFIC
CONTRACTOR OPERATIONS SUCH AS TRENCHING, JACKING OF PIPE OR CASINGS,
11.
THE PUBLIC, OR MAINTENANCE AND OPERATIONS OF THE AIRPORT.
PRECAUTIONS AS WILL ACCOMPLISH SUCH END, WITHOUT INTERFERENCE TO AIRCRAFT,
AIRCRAFT, THE PUBLIC AND ALL PERSONS ENGAGED IN THE WORK AND SHALL TAKE SUCH
THE CONTRACTOR SHALL AT ALL TIMES MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD
ASSUMED BY THE CONTRACTOR UNDER OR IN CONNECTION WITH THIS CONTRACT, AND
OR OMITTED TO BE REQUIRED SHALL BE DEEMED TO LIMIT OR IMPAIR ANY OBLIGATIONS
NO REQUIREMENTS OF THIS CONTRACT WITH RESPECT TO PRECAUTIONS REQUIRED
12.
REQUIREMENTS FOR ENTERING AND OPERATING WITHIN THE A.O.A. REQUIREMENTS.
RESPONSIBILITY TO FAMILIARIZE CONSTRUCTION PERSONNEL WITH ANY CHANGE IN THE
O’HARE BADGING OFFICE WHEN APPLYING FOR BADGES. IT SHALL BE THE CONTRACTOR’S
DOCUMENTS), AND SIGN THE CERTIFICATION STATEMENT. PRESENT THIS FORM TO THE
FAA AIRPORT GROUND VEHICLE OPERATIONS GUIDE (INCLUDED IN CONTRACT BID
WORK WITHIN THE RESTRICTED AREA. CONTRACTOR SHALL REVIEW FAA ORDER 5200.7A,
SECURITY BADGES, AND SATISFY ALL SECURITY REQUIREMENTS PRIOR TO BEGINNING
THE CONTRACTOR WILL BE REQUIRED TO OBTAIN ALL VEHICLE PASSES, PERSONNEL
ALL CONSTRUCTION WILL OCCUR WITHIN THE AIRCRAFT OPERATIONS AREA (A.O.A.).
13.
VISIBILITY AND/OR DARKNESS. UNDER NO CIRCUMSTANCES ARE FLARE POTS TO BE USED.
(ACCEPTABLE TO AIRPORT OPERATIONS AND THE FAA) DURING HOURS OF RESTRICTED
SHALL BE PROMINENTLY MARKED WITH BARRICADES AND LIGHTED WITH RED LIGHT UNITS
OPEN TRENCHES, EXCAVATIONS, AND STOCKPILED MATERIAL AT THE CONSTRUCTION SITE
FORWARDED FOR PAYMENT BY THE CONTRACTOR.
THE AIRPORT AUTHORITY BECAUSE OF IMPROPER CONDUCT BY THE CONTRACTOR WILL BE
THE CONTRACTOR UNDER THIS CONTRACT. IN ADDITION, ANY FINES LEVIED BY THE FAA OR
THE CONTRACTING OFFICER. THESE ASSESSMENTS WILL BE DEDUCTED FROM MONIES OWED
THE RESTRICTED ZONES OF TAXIWAYS OR RUNWAYS WITHOUT WRITTEN PERMISSION OF
EACH AND EVERY OCCURRENCE WHERE AN EMPLOYEE OR PIECE OF EQUIPMENT IS WITHIN
THE CONTRACTOR WILL BE LIABLE TO AN ASSESSMENT BY THE AIRPORT AUTHORITY PER
3.
OPERATIONS A DAILY NOTICE TO AIRMEN (NOTAM).
FAA FORM 7460-1 FOR CRANE HEIGHT AND THE CONTRACTOR SHALL REQUEST FROM
DURING DAY TIME. HOWEVER PRIOR TO CONSTRUCTION, THE ENGINEER SHALL FILE FOR
ALL CRANES MUST BE EQUIPPED WITH OBSTRUCTION LIGHTS AT NIGHT AND A FLAG
4.
BY THE RESIDENT ENGINEER.
CONTRACTOR SHALL RESTORE THE SITE AT THE END OF EACH WORK SHIFT AS DIRECTED
APPROVED BY THE RESIDENT ENGINEER WITHIN THE PROJECT AREA. REGARDLESS, THE
OF A WORK SHIFT, SO THAT THERE ARE NO SUDDEN GRADE DIFFERENTIALS AND AS
FINISHED GRADE, AS APPROPRIATE AND IN ACCORDANCE WITH AC 150/5300-13, AT THE END
SHALL BE RETURNED TO WITHIN 3 INCHES OR A MAXIMUM 5% SLOPE OF EXISTING OR
NO EXCAVATION SHALL REMAIN OPEN AFTER ANY WORK SHIFT. IN ADDITION, THE AREA
5.
6.
7.
8.
9.
LKN
N
| 2020-07-02T13:14:54-0500 | |
| RAFAEL CRAME |
| 2020-07-09T11:49:43-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .