ord-d-gs27l-e001.pdf
PDF 371 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This federal solicitation is seeking construction services for the establishment of NAVAIDS facilities serving an extended runway at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project, including installation of a 12' x 16' equipment shelter, glide slope antenna tower, conduit runs, and fiber optic cables. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar projects over the past five years both in dollar amount and airport scope of work. Proposals are due by October 7, 2020 and must include details on past performance, schedule, insurance, bonding, and subcontracting plans. The selected contractor must be registered in SAM.gov and any questions should be directed to the point of contact.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -g s l-e .d g n
/2
/2
:3
:2
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
FRONT WALL INTERIOR ELEVATION
SECTION
C
REAR WALL INTERIOR ELEVATION
A
SECTION
R a y v o s s
EXIT
R a y v o
TOWER
TO GS
D
A
C
FRONT OF RACKS
S
B
DETAIL
PLAN
2’-0"
S SINGLE POLE 20A SWITCH
GROUND
DUPLEX RECEPTACLE
PHASE
NEUTRAL
LEGEND
12 AWG (U.N.D.)#3-WIRE NETWORK,
EMERGENCY LIGHTS (B-5)
6’-0" 6’-0" 3’-0"5’-0"
2’-0"
4’-0"
12’-0"
7’-0"
47 58
8"
3’-0" 2’-6"
4"
3 3
6’-0"
31 25
7’-0"
3’-0"
5’-0"
4’-0"
GRADE
TOP OF
GFI
WP
50 50
INTERIOR LIGHT FIXTURE (B-3)
D
SECTION
RIGHT WALL INTERIOR ELEVATION
B
SECTION
LEFT WALL INTERIOR ELEVATION
ANTENNA FOUNDATION
AROUND GLIDE SLOPE
COUNTERPOISE EXTENDS
PLAN)
FRAMING
PER
(LOCATION
NOTE
SEE
THERMOSTAT
CABLES TO
HVAC CNTRL
FLEXIBLE CONDUIT
LIQUID-TITE
GROUND IN�"
8 INSULATED GREEN
TWO 8 AWG AND ONE
CEILING
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
21.
22.
20.
SLOPE ANTENNA TOWER
OVERHEAD TO GLIDE
CONDUITS CONTINUE
AND SWITCHGEAR
TO TRANSFORMER 7
FOR CONTINUATION
74 75
2" GRSC
2" NIPPLE
23.
ROOF OVERHANG
ACCOMODATE
OFFSET TO
SCALE:1/2"=1’-0"
INTO CBS IF REQUIRED FOR PAPI AND RVR POWER.
INSTALL TERMINAL LUGS IN HERE FOR LARGE CABLES THAT DO NOT FIT
INSTALLED IN PANELBOARD.
PROVIDE MANUFACTURER APPROVED L.O.T.O. DEVICE FOR EACH CB TYPE
PROVIDE SHEATHING & FLASHING FOR ALL MT EXTERIOR ITEMS.
HVAC UNIT 51 .
SET LOCATION OF DISCONNECT TO ALLOW ACCESS TO SIDE PANELS OF
AT CEILING.
PROVIDE WITH POWER STRIP OPTION. ROUTE POWER TO PANEL VIA GANG-BOX
DOORS WITH LOCKING HANDLES FULLY ASSEMBLED & PLACED PER FAA. R.E.
PROVIDE WORKBENCH & STEEL TYPE STORAGE LOCKER (TWO
STD-D-LTNGPROT-E01.
FOR LIGHTNING PROTECTION REQUIREMENTS, SEE SHEET
FAA TO PROVIDE SURGE SUPPRESSION ON INCOMING DATA LINE.
GROUND PLATE.
LUGS SHALL BE REPAIRED TO PREVENT RUSTING. BOND TO MULTI-POINT
ANY PAINT REMOVED TO SECURE THE ATTACHMENT OF THE GROUND
WIREWAYS AND COVERS. USE GROUDING LUGS TO SECURE THE BRAID.
PROVIDE 6 AWG GROUND WIRE BETWEEN ALL CONTRACTOR PROVIDED
TO PREVENT RUSTING.
SECURE THE ATTACHMENT OF THE GROUND LUGS SHALL BE REPAIRED
GROUDING LUGS TO SECURE THE BRAID. ANY PAINT REMOVED TO
BOXES AND ENCLOSURES BETWEEN THE J.B. BODY AND COVER. USE
PROVIDE GROUNDING, BRAID ON ALL CONTRACTOR PROVIDED JUNCTION
LOCATED WITHIN SHELTER PER FAA DIRECTION.
ONE-LINE DIAGRAM UNDER PROTECTIVE COVERING. DRAWING TO BE
CONTRACTOR TO PROVIDE AN "AS-BUILT’ 11"x17" COPY OF SYSTEM
WITH FAA PERSONNEL.
WITHIN THE SAME JUNCTION BOX AT A FUTURE DATE. COORDINATE WORK
IN SUCH A MANNER TO ALLOW ANOTHER PATCH PANEL TO BE MOUNTED
FOTS PATCH PANEL SHALL BE MOUNTED BY OTHERS WITHIN JUNCTION BOX
LIGHTNING PROTECTION DEVICES AFTER THIS TERMINATION.
TERMINAL BLOCKS PER FAA-GL-918D. THE FAA SHALL INSTALL THE
CONTRACTOR SHALL TERMINATE THE COPPER CONTROL CABLES ONTO
OVER-REMOVAL WITH MANUFACTURER APPROVED PVC COATING.
2 AWG MINIMUM PER FAA-STD-019E. REMOVE PVC COATING AND RESTORE
ALL ENTRANCE CONDUITS TO BE BONDED TO SITE EES USING
SHARED NEUTRALS AND GROUND WIRES ARE NOT ALLOWED.
OPTIC LOOP.
SLOPE SHELTER AND ONE EACH TO THE ADJACENT NODES ON THE FIBER
SINGLEMODE, OUTSIDE PLANT FIBER OPTIC CABLES BETWEEN THE GLIDE
OTHERS TO FURNISH, INSTALL AND TERMINATE (2)-24 STRAND,
SEE SHEET ORD-D-GS27C-E002 FOR EQUIPMENT LEGEND.
FIELD WIRING CONDUCTORS.
PROVIDE HACR TYPE CIRCUIT BREAKER FOR PROTECTION OF
FROM EES PER FAA-STD019.
ALL CONDUITS ENTERING SHELTER TRANSITION FROM GRSC TO PVC 10’
FEET OUTSIDE SHELTER. DO NOT ENCASE THIS CONNECTION IN CONCRETE.
CONDUIT OF THE SAME RESPECTIVE DIAMETER AT A POINT AT LEAST 5
GRSC CONDUITS SHALL TRANSITION TO CONCRETE-ENCASED SCH 40 PVC
PVC-COATED. SEE NOTE 11.
THE SEGMENT OF GRSC THAT CONTACTS THE SOIL SHALL BE
�" MINIMUM DIA., UNLESS NOTED OTHERWISE.
NUMBER OF BENDS. ALL CONDUITS INSIDE THE SHELTER SHALL BE EMT,
RUNS SHALL BE INSTALLED PLUMB OR HORIZONTAL WITH THE MINIMUM
SWITCHES, AND CONDUITS SHALL BE SURFACE-MOUNTED. CONDUIT
ELECTRICAL EQUIPMENT, LIGHT FIXTURES, RECEPTACLES, LIGHT
GRADE SILICONE CAULK. COLOR SHALL BE WHITE.
ALL WALL PENETRATIONS SHALL BE SEALED WITH EXTERIOR
WELDS ARE NOT ALLOWED ON FAA FACILITIES, NO EXCEPTIONS.
SHALL BE BY EXOTHERMIC WELD. ONE SHOT EXOTHERMIC
ALL CONNECTIONS TO EES CONDUCTOR 2 OR TO ROD 3
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-GS27L-E001
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
GS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -g s l-e .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
GLIDE SLOPE - RUNWAY 27L
PLAN AND INTERIOR ELEVATIONS
12’ X 16’ EQUIPMENT SHELTER
LKN
SCALE: 1/2" = 1’-0"
5’1’ 2’01’
| 2020-07-06T09:34:24-0500 | |
| RAFAEL CRAME |
| 2020-07-09T16:23:18-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .