About this file

This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with the drawings, specifications, and contract clauses. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate experience completing similar projects both in dollar amount and scope of work at an operational airport. Offers are due by October 7, 2020 and must include details on past performance, financial capability, insurance, bonding, and small business subcontracting plans. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -i m r-c .d g n

/2

/2

:3

:2

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

9’-0"

22’-0"

12’-0"

21’-0"

IN

S

T A

L

A

S F

IG

H T

B

R

F O

U N

D A

T

IO

N

R U

N W

Y

R

S

A

.0

A L

S F

S

A

.0

E L

V

FAA ACCESS ROAD 1

6’-0" 12’-0"

7’-9"

10’-3"

SEE INSET.

SEE 9R-27L STA 290+68.00

ALSF-2 STA 9+32.00 RWY

RWY 9R INNER MARKER

INSTALL

E 1092658.76

N 193863.73

FAA H6143-10

FAA HANDHOLE

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-IM09R-C001

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

IM

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -i m r-c .d g n

INNER MARKER - RUNWAY 9R

SITE PLAN

NOTES:

DETAILS ON INNER MARKER.

SEE ORD-D-IM27C-C001 FOR FURTHER 3.

PROPER INSTALLATION OF ALL FACILITIES.

COORDINATE WITH CITY CONTRACTOR TO ENSURE2.

GROUND ITEMS.

CONDUITS, INSTALL ANTENNAS AND ALL ABOVE-

FAA CONTRACTOR TO PULL CABLES, TERMINATE

IM FOUNDATION ARE CONSTRUCTED BY OTHERS.

THE ALSF LIGHT LANE, ALL DUCT BANKS AND1.

ITEMS APPLY

ONLY CLOUDED

SCALE: 1" = 10’

10’ 20’010’

SS JB

12"X16"X6"

INSTALL

ANTENNA GND

CONNECT #2 GREEN

ANTENNA & SUPPORT

INSTALL INNER MARKER

INNER MARKER - RUNWAY 9R

SCALE: 1" = 10’-0"

CONDUIT

2" PVC CONCRETE ENCASED

6 GREEN IN EXISTING#& 1-1/C

INSTALL 5/8" HELIAX CABLE

2020-07-06T09:35:22-0500
RAFAEL CRAME
2020-07-09T16:24:46-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .