About this file

This federal solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. Interested firms must have experience completing similar airport construction projects valued between $5 million to $10 million. The contractor shall provide all labor, supervision, materials, and equipment to perform the work in accordance with contract documents. The performance period is 605 calendar days starting November 15, 2020. Offers are due by October 7, 2020 and must include documentation of past performance, safety plans, insurance, bonding capacity, and subcontracting commitments. The Federal Aviation Administration Southwestern Region is the contracting agency.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-e .d g n

/2

/2

:0

:1

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

1.

2.

STAND-OFF INSULATOR.

OTHER SHIMS), AND BE SNUG WHEN FULLY ENGAGED IN THE

OR OTHER MOUNTING BODY (INCLUDING WASHERS OR

LENGTH TO PASS THROUGH THE MOUNTING CHANNEL, BRACKET,

SHELTER DRAWING. THE FASTENERS SHALL BE OF SUFFICIENT

SCREWED TO THE WALL, OR AS SHOWN ON THE EQUIPMENT

WALL, GALVANIZED CHANNEL OR METAL MOUNTING BRACKET

USING A PAINTED PLYWOOD PANEL SHIMMED OUT FROM THE

THE STAND-OFF INSULATORS SHALL BE SECURED TO THE WALL

3.

MULTI-POINT GROUNDING PLATE

ELECTRONIC

CAUTION

ALL AROUND PERIMETER

3/8" GREEN/ORANGE STRIPING,

WITH CLEAR WINDOW

1/8" CLEAR ACRYLIC COVER

LETTERS (TYPICAL)

3/8" HIGH BLACK

(4 PLACES)

5/16" HOLE

MAIN GROUNDING PLATE

ELECTRONIC

CAUTION

ALL AROUND PERIMETER

3/8" GREEN/ORANGE STRIPING,

WITH CLEAR WINDOW

1/8" CLEAR ACRYLIC COVER

LETTERS (TYPICAL)

3/8" HIGH BLACK

(4 PLACES)

5/16" HOLE

01 2 5

SCALE IN INCHES

(4 PLACES)

ROD OR HEX HEAD BOLTS

1/4"-20 UNC SS THREADED

5/16" DIA HOLE FOR

PER NOTE 3

ACCOMMODATE BOLT

DRILL PLATE TO

GROUNDING PLATE

1/4" SOLID COPPER

(14 PLACES)

1/4" DIA HOLE

SIZED FOR CONDUCTOR

2-HOLE LUGS APPROPRIATELY

(4 PLACES)

SS THREADED ROD

1/4"-20 UNC X 3 1/2"

GROUNDING PLATE COVER

(4 PLACES)

1/4" WASHER

NUT (8 PLACES)

1/4"-20UNC SS HEX DETAIL "1"

PLATE PER

COPPER GROUNDING

12" X 6" X 1/4"

1/4"-20UNC (4 PLACES)

WITH 1/4" THREAD INSERTS,

STAND-OFF INSULATOR, 600V

(4 PLACES)

2 1/4" LONG

1/2" O.D. SPACER

PER NOTE 1

MOUNTING SURFACE

(4 PLACES)

FASTENER PER NOTE 1

1/4"-20 UNC THREADED

TO A GROUNDING ROD USING AN EXOTHERMIC WELD.

SHALL BE PVC SCHEDULE 80. CONNECT CONDUCTOR

CONDUITS CONTAINING GROUND CONDUCTORS ONLY

1"

GROUNDING CABLES TO 12-TON CONCENTRICALLY APPLIED.

THE SELECTED CONNECTOR. CONNECTORS CRIMPED TO

THE SECOND HOLE TO MATCH THE BOLT PATTERN OF

DETAIL "1". THE INSTALLER OF THE CONNECTOR SHALL DRILL

FOR INSTALLING EACH 2-BOLT CONNECTOR IS SPECIFIED IN

ACCEPTABLE. NOTE THAT ONLY ONE OF THE HOLES REQUIRED

THE GROUNDING PLATES. ONE-BOLT CONNECTORS ARE NOT

ARE REQUIRED FOR ALL CONDUCTORS TO BE CONNECTED TO

3/8"-16 UNC X 1 1/2" HEX HEAD BOLT, NUT, AND LOCK WASHER

TWO-BOLT CONNECTORS WITH SILICON BRONZE

NOTES:

NOT TO SCALE

GROUNDING PLATE DETAIL

ACRYLIC COVER FOR MAIN

TOP VIEW

FRONT VIEW

NOT TO SCALE

TYPICAL GROUNDING PLATE DETAIL

NOT TO SCALE

MULTI-POINT GROUNDING PLATE

ACRYLIC COVER FOR

1’-2"

TYP

1 1/2"

T Y

P

1/2" TYP

TYP

1 3/4"

TYP

1 1/4"

T Y

P

1’-2"

1 1/2"

TYP

1"

TYP

TYP

T Y

P

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-E006

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

RUNWAY 9R ALSF-2/27L LOCALIZER

GROUNDING PLATE DETAILS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -a ls r-e .d g n

2020-07-02T13:40:17-0500
RAFAEL CRAME
2020-07-09T14:16:24-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .