About this file

This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with the contract drawings, specifications, and clauses. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar projects of comparable size and complexity. Offers are due by October 7, 2020 and must include details on past performance, financial capability, insurance, bonding, and small business subcontracting plans. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Attachment No. 04 - Section L-110 - Installation of Airport Underground Electrical Duct.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls l-c .d g n

/2

/2

:4

:1

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

1/2"

STRUCTURAL LUMBER

DOUGLAS-FIR NO. 2,

2 X 6 OR 2 X 12,

OSB FILLER

1/2" THICK

SHEATHING

1/2" PLYWOOD

CONT. SEALANT

MANUFACTURER

STANDING SEAM PANEL

CONT. JAMB FLASHING BY

CONT. SEALANT

(BELOW)

THRESHOLD

SHEATHING

1/2" PLYWOOD

METAL WALL PANEL

STANDING SEAM

PANEL MFR

STANDING SEAM

FLASHING BY

CONT METAL

FOUNDATION

FACE OF

ENTRY PAD

6’ CONCRETE

WALL PANEL BEYOND

STANDING SEAM

CONT. SEALANT

THRESHOLD

BREAK

THERMAL

ALUMINUM

7 5/8" FRAME

SILL

JAMB

WRAP INTO HEAD AND JAMB

AIR AND VAPOR BARRIER

METAL DOOR FRAME

HEAD

CONT SEALANT

3/4" PLYWOOD SHEATHING

2 X 6 STUD GRADE FRAMING

5/8" TYPE X GYPSUM BOARD

R-19 FIBERGLASS INSULATION

CONT SEALANT

NOT TO SCALE

TYPICAL HEADER DETAIL

NOT TO SCALE

EXTERIOR DOOR DETAIL

A

NOT TO SCALE

SECTION

B

NOT TO SCALE

SECTION

IMPROVEMENT

PROPOSED SURFACE

SEE CIVIL PLANS FOR

SHEATHING.

PROVIDE J-CHANNEL CAP AT THE BOTTOM OF

OVERLAP SHEATHING OVER FOUNDATION 2" MIN.

FIBERGLASS BATT INSULATION, R-19

2 X 6 STANDARD WALL STUD, 16" O.C.

TYVEK COMMERCIAL WRAP.

APPLY AIR AND WATER INFILTRATION BARRIER,

1/2" ORIENTED STRAND BOARD (OSB) SHEATHING.

TIE, MODEL H2 MEETS SPECIFICATIONS

DOUBLE TOP WALL PLATES. SIMPSON STRONG

THE RAFTER AND CEILING JOISTS TO THE

18 GA. GALVANIZED TIE CONNECTOR. ANCHOR

FIBERGLASS BATT INSULATION, R=30 MIN.

COVER SHEATHING WITH ICE AND WATER SHIELD.

3/4" ORIENTED STRAND BOARD (OSB) SHEATHING.

SUBMIT TRUSS CALCULATIONS TO RESIDENT ENGINEER.

PER TRUSS MANUFACTURER’S TRUSS DESIGN.

WOOD TRUSS WITH METAL CONNECTION PLATES

BETWEEN EACH RAFTER

STYROFOAM BAFFLE

OVER 3/4" PLYWOOD SHEATHING

5/8" TYPE X GYPSUM BOARD

7 3/8"

6 1/4"

PER NOTE 1

FINISHED FLOOR

VINYL WALL BASE

SPECIFICATIONS

CORP MEETS

STRIP, PROTECTO

3/8" SILL SEALER

FINISHED FLOOR PER NOTE 1

VINYL WALL BASE (TYPICAL)

3/4" PLYWOOD SHEATHING

6 1/4"

INSULATION, R-13

FIBERGLASS BATT

2 X 4 STUD GRADE 16" O.C.

5/8" TYPE X GYPSUM BOARD

3/4" PLYWOOD ON CEILING

WITH MINIMUM R=30

FIBERGLASS BATT INSULATION

1" MIN BETWEEN CONDUIT AND DRYWALL

1’-6"

INSULATION (TYP)

MIN. R-3 THERMAL

W/NUT AND WASHER, 3’ O.C.

1/2" X 18" EXPANSION ANCHOR

J-BOLT ANCHOR PER NOTE 5

(DOUBLE)

GRADE SILL PLATE

2 X 6 STUD

PRESSURE-TREATED

(K.A.S.: GRACE ICE & WATER SHIELD, 40 MILS)

ICE AND WATER SHIELD

AS THE ROOF PANELS.

USING THE SAME GAUGE, MATERIAL, FINISH, AND COLOR

PROVIDE CONTINUOUS GUTTERS AND DOWNSPOUTS

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS27L-C014

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls l-c .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

NOTE:

WALL DETAILS AND SECTIONS

KE

RC

RUNWAY 27L ALSF-2 / 9R LOCALIZER

FOUND ON SHEET ORD-GL-D-XXXX-C010.

NOTES REFERENCED ON THIS DRAWING ARE

2020-07-02T13:59:25-0500
RAFAEL CRAME
2020-07-09T15:16:53-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .